Geotechnical engineering circular No. 7-soil nail walls CA Lazarte, V Elias, PJ Sabatini, RD Espinoza United States. Federal Highway Administration. Office of Technology Applications, 2003 | 122 | 2003 |
Towards sustainable mining (Part I): Valuing investment opportunities in the mining sector RD Espinoza, J Rojo Resources Policy 52, 7-18, 2017 | 88 | 2017 |
Decoupled NPV: a simple, improved method to value infrastructure investments D Espinoza, JWF Morris Construction management and economics 31 (5), 471-496, 2013 | 78 | 2013 |
Soil-geotextile interaction: evaluation of membrane support RD Espinoza Geotextiles and Geomembranes 13 (5), 281-293, 1994 | 75 | 1994 |
Separating project risk from the time value of money: A step toward integration of risk management and valuation of infrastructure investments RD Espinoza International Journal of Project Management 32 (6), 1056-1072, 2014 | 67 | 2014 |
Soil nail walls CA Lazarte, V Elias, RD Espinoza, PJ Sabatini Geotechnical Engineering Circular, 2003 | 67 | 2003 |
Unified formulation for analysis of slopes with general slip surface RD Espinoza, PL Bourdeau, B Muhunthan Journal of geotechnical engineering 120 (7), 1185-1204, 1994 | 55 | 1994 |
General framework for stability analysis of slopes RD Espinoza, PC Repetto, B Muhunthan Géotechnique 42 (4), 603-615, 1992 | 49 | 1992 |
Towards sustainable mining (part II): Accounting for mine reclamation and post reclamation care liabilities RD Espinoza, JWF Morris Resources Policy 52, 29-38, 2017 | 42 | 2017 |
An integrated approach to evaluating single-layer reinforced soils RD Espinoza, JD Bray Geosynthetics International 2 (4), 723-739, 1995 | 40 | 1995 |
Using DNPV for valuing investments in the energy sector: A solar project case study RD Espinoza, J Rojo Renewable energy 75, 44-49, 2015 | 37 | 2015 |
Reliability of state of practice for selection of shear strength parameters for waste containment system stability analyses PJ Sabatini, LM Griffin, R Bonaparte, RD Espinoza, JP Giroud Geotextiles and Geomembranes 20 (4), 241-262, 2002 | 31 | 2002 |
Contingency estimating using option pricing theory: closing the gap between theory and practice RD Espinoza Construction Management and Economics 29 (9), 913-927, 2011 | 19 | 2011 |
DNPV: a valuation methodology for infrastructure and Capital investments consistent with prospect theory D Espinoza, J Rojo, A Cifuentes, J Morris Construction management and economics 38 (3), 259-274, 2020 | 15 | 2020 |
Infiltration RD Espinoza Groundwater engineering handbook, 1999 | 15 | 1999 |
The role of traditional discounted cash flows in the tragedy of the horizon: another inconvenient truth D Espinoza, J Morris, H Baroud, M Bisogno, A Cifuentes, A Gentzoglanis, ... Mitigation and Adaptation Strategies for Global Change, 2019 | 14 | 2019 |
Geofeap-geotechnical finite element analysis program JD Bray, RD Espinoza, K Soga, RL Taylor Dept. of Civ. and Envir. Engrg., University of California, Berkeley, Calif, 1995 | 13 | 1995 |
Financial sustainability as a metric for infrastructure projects R Gupta, JWF Morris, R David Espinoza Geo-Chicago 2016, 653-662, 2016 | 11 | 2016 |
Geotechnical Circular No. 7–Soil Nail Walls CA Lazarte, V Elias, RD Espinoza, PJ Sabatini Report No. FHWA IF-02-017, Federal Highway Administration, 2003 | 11 | 2003 |
An Approximate Solution for Perpetual American Option with Time to Build: The Value of Environmental Remediation Investment Projects. RD Espinoza, LX Luccioni International Journal of Business 12 (3), 2007 | 10 | 2007 |