关注
Milos Ivic
Milos Ivic
在 sf.bg.ac.rs 的电子邮件经过验证
标题
引用次数
引用次数
年份
A fuzzy Petri net model to estimate train delays
S Milinković, M Marković, S Vesković, M Ivić, N Pavlović
Simulation Modelling Practice and Theory 33, 144-157, 2013
1572013
Group decision making process for early stage evaluations of infrastructure projects using extended VIKOR method under fuzzy environment
I Belošević, M Kosijer, M Ivić, N Pavlović
European Transport Research Review 10, 1-14, 2018
522018
Multicriteria decision-making in railway route planning and design
M Kosijer, M Ivić, M Marković, I Belošević
Građevinar 64 (03.), 195-205, 2012
512012
Variable neighborhood search for multistage train classification at strategic planning level
I Belošević, M Ivić
Computer‐Aided Civil and Infrastructure Engineering 33 (3), 220-242, 2018
372018
Effects of the application of conventional methods in the process of forming the pick-up trains
M Ivić
Yugoslav Journal of Operations Research 17 (2), 2016
252016
Višekriterijsko odlučivanje u planiranju i projektiranju trase željezničke pruge
M Kosijer, M Ivić, M Marković, I Belošević
Građevinar 64 (3), 195-205, 2012
142012
Simulation model for estimating effects of forming pick-up trains by simultaneous method
M Ivić, A Marković, S Milinković, I Belošević, M Marković, S Vesković, ...
Proceedings of 7th EUROSIM Congress on Modelling and Simulation, Prague, 2010
102010
Challenges in the railway yards layout designing regarding the implementation of intermodal technologies
I Belošević, M Ivić, M Kosijer, N Pavlović, S Aćimović
2nd logistics international conference. Aćimović, 62-67, 2015
92015
Conditions for simultaneous formation of multigroup freight trains
M Ivić, M Kosijer
Građevinar 64 (07.), 553-563, 2012
92012
Track properties for formation of pick-up trains
I Belošević, S Milinković, M Kosijer, N Pavlović, M Ivić
72012
Fuzzy multicriteria decision-making in railway infrastructure planning and design
M Kosijer, M Ivić, I Belošević, N Pavlović, M Opricović
Građevinar 72 (04.), 323-334, 2020
62020
A fuzzy group decision making for a rail-road transshipment yard micro locaton problem
I Belošević, S Milinković, P Marton, S Vesković, M Ivić
MATEC Web of Conferences 235, 00019, 2018
62018
Railroad transshipment yards: layouts and rail operation
I Belošević, M Ivić, M Kosijer, N Pavlović, S Aćimović
Horizons Series B 3, 559-569, 2016
62016
Fuzzy renewal theory about forecasting mistakes done by a locomotive driver: A serbian railway case study
M Marković, N Pavlović, M Ivić
Transport 26 (4), 403-409, 2011
62011
Železničke pruge i stanice: postrojenje za vezu koloseka
M Ivić
Saobraćajni fakultet Univerziteta, 2005
62005
Analysis of simulation model aplication to forecast the railway workers failures
M Marković
Yugoslav Journal of Operations Research 17 (1), 2016
42016
Simulation model of a railway junction based on Petri Nets and fuzzy logic
S Milinković, S Vesković, M Marković, M Ivić, N Pavlović
Selected Proceedings of the 12th World Conference on Transport Research …, 2010
42010
Bezbednost, proračun i ispitivanje grbine
M Marković, M Ivić
Saobraćajni fakultet Univerziteta, 2005
42005
Primena višekriterijumske optimizacije pri izboru optimalnog koridora železničke pruge
MV Kosijer, MS Ivić
31997
Advanced evaluation of simultaneous train formation methods based on fuzzy compromise programing
I Belošević, S Milinković, M Ivić, P Marton
E3S Web of Conferences 135, 02026, 2019
22019
系统目前无法执行此操作,请稍后再试。
文章 1–20