关注
Mahendrini Fernando Ariyachandra
Mahendrini Fernando Ariyachandra
Assistant Professor
在 ucl.ac.uk 的电子邮件经过验证 - 首页
标题
引用次数
引用次数
年份
Competencies expected of graduate quantity surveyors working in developing countries
G Yogeshwaran, B Perera, MRMF Ariyachandra
Journal of Financial Management of Property and Construction 23 (2), 202-220, 2018
532018
Detection of railway masts in airborne LiDAR data
M Ariyachandra, I Brilakis
Journal of Construction Engineering and Management 146 (9), 04020105, 2020
352020
Digital twin smart cities for disaster risk management: a review of evolving concepts
MRMF Ariyachandra, G Wedawatta
Sustainability 15 (15), 11910, 2023
182023
Digital Twinning of Railway Overhead Line Equipment from Airborne LiDAR Data
MF Ariyachandra, I Brilakis
37th International Symposium on Automation and Robotics in Construction …, 2020
182020
Understanding the challenge of digitally twinning the geometry of existing rail infrastructure
M Ariyachandra, I Brilakis
122019
Competencies expected from an information manager working in BIM based projects
M Ariyachandra, HS Jayasena, B Perera
International Journal of Construction Education and Research 18 (1), 49-66, 2022
112022
Procurement system selection model for the Sri Lankan construction industry
SMNAMRMFA R.A.C. Chanudha, P.A.P.V.D.S. Disaratna
The 6th World Construction Symposium 2017: What's New and What's Next in the …, 2017
8*2017
Application of railway topology for the automated generation of geometric digital twins of railway masts
M Ariyachandra, I Brilakis
ECPPM 2021-eWork and eBusiness in Architecture, Engineering and Construction …, 2021
52021
Generating railway geometric Digital Twins from airborne LiDAR data
MR Ariyachandra, I Brilakis
EC3 Conference 2021 2, 322-331, 2021
42021
Real-virtual synchronisation: a review on the state-of-the-art geometric digital twinning of infrastructure
M Ariyachandra, A Samarakkody, B Perera
42019
Comparative effectiveness of quantity surveying in BIM implementation
G Kulasekara, HS Jayasena, M Ariyachandra
32016
Leveraging railway topology to automatically generate track geometric information models from airborne LiDAR data
MRMF Ariyachandra, I Brilakis
Automation in Construction 155, 105068, 2023
22023
Automated generation of railway track geometric digital twins (RailGDT) from airborne LiDAR data
MF Ariyachandra, I Brilakis
Universitätsverlag der TU Berlin, 451, 2021
22021
Automatic detection of railway masts in air-borne LiDAR data
I Brilakis, M Ariyachandra
22020
Challenges of transcending BIM information from design phase to real time on-site construction phase
M Wijewickrama, HS Jayasena, M Ariyachandra
Ceylon Institute of Builders, 2017
12017
Review on lean construction and tps approximation with BIM
MZM Zuhair, HS Jayasena, M Ariyachandra
Ceylon Institute of Builders, 2016
12016
Knowledge Driven Rule-Based Building Geometric Digital Twin Construction: State of the Art Review
Y Wen, M Wang, MRMF Ariyachandra, R Wei, I Brilakis, L Xiao
2024 European Conference on Computing in Construction, 2024
2024
An Integrated Solution for Automatic 3D Object-based Information Retrieval
Y Wen, M Wang, G Wang, M Ariyachandra, I Brilakis, L Xiao
2024
The Potential for Utilizing Knowledge Graphs with Digital Twins in Solving Road Maintenance Skills Shortages
R Kang, M Ariyachandra, I Brilakis
2024
Automating the Generation of Geometric Information Models to Support Digital Twinning of Existing Rail Infrastructure
MF Ariyachandra
2022
系统目前无法执行此操作,请稍后再试。
文章 1–20