Effect of initial pH value on the removal of reactive black dye from water by electrocoagulation (EC) method KS Hashim, AH Hussein, SL Zubaidi, P Kot, L Kraidi, R Alkhaddar, ... Journal of Physics: Conference Series 1294 (7), 072017, 2019 | 118 | 2019 |
Decolourization of dye solutions by electrocoagulation: an investigation of the effect of operational parameters KS Hashim, NH Al-Saati, SS Alquzweeni, SL Zubaidi, P Kot, L Kraidi, ... IOP Conference Series: Materials Science and Engineering 584, 012024, 2019 | 109 | 2019 |
Analyzing the critical risk factors associated with oil and gas pipeline projects in Iraq L Kraidi, R Shah, W Matipa, F Borthwick International Journal of Critical Infrastructure Protection 24, 14-22, 2019 | 70 | 2019 |
An investigation of mitigating the safety and security risks allied with oil and gas pipeline projects L Kraidi, R Shah, W Matipa, F Borthwick Journal of Pipeline Science and Engineering 1 (3), 349-359, 2021 | 40 | 2021 |
Using stakeholders’ judgement and fuzzy logic theory to analyze the risk influencing factors in oil and gas pipeline projects: Case study in Iraq, Stage II L Kraidi, R Shah, W Matipa, F Borthwick International Journal of Critical Infrastructure Protection 28, 100337, 2020 | 34 | 2020 |
2nd International Scientific Conference KS Hashim, AH Hussein, SL Zubaidi, P Kot, L Kraidi, R Alkhaddar, ... Al-Qadisiyah University, 2019 | 18 | 2019 |
Analyzing Stakeholders' Perceptions of the Critical Risk Factors in Oil and Gas Pipeline Projects L Kraidi, R Shah, W Matipa, F Borthwick Periodica Polytechnica Architecture 50 (2), 155-162, 2019 | 9 | 2019 |
Development of risk optimisation model for oil and gas transportation pipeline routes L Kraidi, R Shah, W Matipa, F Borthwick, K Hashim IOP Conference Series: Materials Science and Engineering 584 (1), 012025, 2019 | 9 | 2019 |
An analysis of the critical risk factors in oil and gas pipeline projects using a comprehensive risk management framework L Kraidi, RK Shah, WM Matipa, F Borthwick ARCOM Conference Proceedings, 360-369, 2018 | 9 | 2018 |
Analyzing the critical risk factors in oil and gas pipelines projects regarding the perceptions of the stakeholders L Kraidi, RK Shah, WM Matipa, F Borthwick CCC 2018-Proceedings, 2018 | 9 | 2018 |
Analysing the Critical Risk Factors of Oil and Gas Pipeline Projects in Iraq L Kraidi, RK Shah, WM Matipa, F Borthwick The 3rd BUiD Doctoral Research Conference 2017 Proceedings, 133-148, 2018 | 7 | 2018 |
Development of an Integrated Risk Management Framework for Oil and Gas Pipeline Projects L Kraidi PQDT-Global, 2020 | 5 | 2020 |
Application of Fuzzy Logic Theory on Risk Assessment in Oil and Gas Pipeline Projects. L Kraidi, RK Shah, WM Matipa, F Borthwick ASC 2019 International Conference, 2019 | 5 | 2019 |
The development of a questionnaire survey to investigate the critical risk factors in oil and gas pipelines projects L Kraidi, RK Shah, WM Matipa, F Borthwick CCC 2018-Proceedings, 2018 | 5 | 2018 |
Investigation of the Risk Factors Causing Safety and Delay Issues in Oil and Gas Pipeline Construction Projects R Shah, L Kraidi, W Matipa, F Borthwick Global Congress on Manufacturing and Management, 313-326, 2021 | 2 | 2021 |
Analysing Delay Impact from Potential Risk Factors on Project Delivery of Oil and Gas Pipeline: A Case Study in Iraq RK Shah, K Layth, WM Matipa, F Borthwick Journal of Construction Research 2 (2), 42-55, 2021 | 1 | 2021 |
Analyzing the Safety Risk Factors and Adaptation Measures in Downstream Oil and Gas Industry R Shah, M Tyyab, PG Student, L Kraidi Proceedings of 59th Annual Associated Schools 4, 166-174, 2023 | | 2023 |
A Model for Delay Analysis Impact at Planning Phase of Oil & Gas Pipeline Projects: A case of Iraq RK Shah, L Kraidi, WM Matipa, F Borthwick EPiC Series in Built Environment: ASC 2022, 58th Annual Associated Schools …, 2022 | | 2022 |
Quantitative Analysis of the Delay Factors in Oil and Gas Pipeline Projects L Kraidi, R Shah, W Matipa, F Borthwick EPiC Series in Built Environment 1, 356-363, 2020 | | 2020 |
Investigation of the Risk Factors Causing Safety and Delay Issues in Oil and Gas Pipeline Construction Projects L Kraidi, R Shah, W Matipa, F Borthwick Procedia Manufacturing, 2020 | | 2020 |