Review on economic loss assessment of power outages M Shuai, W Chengzhi, Y Shiwen, G Hao, Y Jufang, H Hui Procedia computer science 130, 1158-1163, 2018 | 104 | 2018 |
Review on risk assessment of power system S Yu, H Hou, C Wang, H Geng, H Fan Procedia Computer Science 109, 1200-1205, 2017 | 40* | 2017 |
A hybrid prediction model for damage warning of power transmission line under typhoon disaster H Hou, S Yu, H Wang, Y Xu, X Xiao, Y Huang, X Wu IEEE Access 8, 85038-85050, 2020 | 32 | 2020 |
Intelligent detection of vegetation encroachment of power lines with advanced stereovision S Rong, L He, L Du, Z Li, S Yu IEEE Transactions on Power Delivery 36 (6), 3477-3485, 2020 | 31 | 2020 |
Damage probability assessment of transmission line-tower system under typhoon disaster, based on model-driven and data-driven views H Hou, H Geng, Y Huang, H Wu, X Wu, S Yu Energies 12 (8), 1447, 2019 | 28 | 2019 |
Risk assessment and its visualization of power tower under typhoon disaster based on machine learning algorithms H Hou, S Yu, H Wang, Y Huang, H Wu, Y Xu, X Li, H Geng Energies 12 (2), 205, 2019 | 27 | 2019 |
Study on risk assessment of the electric power tower and pole damage in power system under typhoon disaster S Yu, H Wu, H Geng, J Yu, S Mao, H Hou, Z Mao Procedia computer science 130, 1164-1169, 2018 | 16 | 2018 |
Risk assessment of transmission tower in typhoon based on spatial multi-source heterogeneous data H Hou, S Yu, X Xiao, Y Huang, H Geng, J Yu Automation of Electric Power Systems 44 (10), 127-134, 2020 | 13 | 2020 |
Research on prediction and evaluation of user power outage area under typhoon disaster H Hou, H Geng, X Xiao, Y Huang, H Wu, X LI, S YU Power System Technology 43 (06), 1948-1954, 2019 | 12 | 2019 |
Research on early warning method of overhead transmission line damage caused by typhoon disaster H Geng, Y Huang, S Yu, J Yu, H Hou, Z Mao Procedia computer science 130, 1170-1175, 2018 | 12 | 2018 |
Early warning for transmission line damage under typhoon disaster based on random wind field probability weighting H Hou, SW Yu, XQ Li, HB Wang, Y Huang, XX Wu Automation of Electric Power Systems 45 (7), 140-147, 2021 | 11 | 2021 |
Risk assessment of transmission line trip caused by windage yaw under typhoon H Hou, J Yu, Y Huang, HB Wang, SW Yu, H GENG High Voltage Engineering 45 (12), 3907-3915, 2019 | 9 | 2019 |
Damage prediction of transmission lines under typhoon disasters considering multi-effect H Hou, Z Zhang, S Yu, Y Huang, Y Zhang, Z Dong Journal of Smart Environments and Green Computing 1 (2), 90-102, 2021 | 7 | 2021 |
基于空间多源异构数据的台风下输电杆塔风险评估 侯慧, 于士文, 肖祥, 黄勇, 耿浩, 俞菊芳 电力系统自动化 44 (10), 127-134, 2020 | 6 | 2020 |
Review on the research status of power system risk identification under typhoon disaster X Chen, Z Lianhong, M Li, Y Huang, H Hou, S Yu, X Wu Procedia Computer Science 155, 780-784, 2019 | 6 | 2019 |
台风灾害下用户停电区域预测及评估 侯慧, 耿浩, 肖祥, 黄勇, 吴昊, 李显强, 于士文 电网技术 43 (6), 1948-1954, 2019 | 5 | 2019 |
Simulation research of offshore wind farm VSC-HVDC three-Level converters for grid integration Z Mao, X Xu, J Li, S Yu, H Geng Procedia Computer Science 130, 1146-1151, 2018 | 5 | 2018 |
Performance of Grid-forming Control of Grid-edge DERs in Distribution Grids S Yu, S Rong, L He 2022 IEEE Power & Energy Society General Meeting (PESGM), 2022 | 3 | 2022 |
基于随机风场概率加权的台风灾害下输电线路损毁预警 侯慧, 于士文, 李显强, 王红斌, 黄勇, 吴细秀 电力系统自动化 45 (7), 140-147, 2021 | 3 | 2021 |
台风侵袭下输电线路风偏跳闸风险评估 侯慧, 俞菊芳, 黄勇, 王红斌, 于士文, 耿浩 高电压技术 45 (12), 3907-3915, 2019 | 3 | 2019 |