关注
Ebrahim Asadi-Gangraj
Ebrahim Asadi-Gangraj
Associate Professor of Industrial Engineering; Babol Noshirvani University of Technology
在 nit.ac.ir 的电子邮件经过验证
标题
引用次数
引用次数
年份
Multi-objective Fuzzy Robust Optimization Approach to Sustainable Closed-Loop Supply Chain Network Design
S Nayeri, MM Paydar, E Asadi-Gangraj, S Emami
Computers & Industrial Engineering, 106716, 2020
1562020
Designing a bi-objective multi-echelon robust blood supply chain in a disaster
M Habibi-Kouchaksaraei, MM Paydar, E Asadi-Gangraj
Applied Mathematical Modelling 55, 583-599, 2018
1122018
Scenario-based design of a steel sustainable closed-loop supply chain network considering production technology
M Pourmehdi, MM Paydar, E Asadi-Gangraj
Journal of Cleaner Production 277, 123298, 2020
812020
A robust bi-level optimization modelling approach for municipal solid waste management; a real case study of Iran
S Pouriani, E Asadi-Gangraj, MM Paydar
Journal of Cleaner Production 240, 118125, 2019
632019
Designing a mathematical model for dental tourism supply chain
F Ahmadimanesh, MM Paydar, E Asadi-Gangraj
Tourism management 75, 404-417, 2019
612019
A hybrid genetic algorithm for integrating virtual cellular manufacturing with supply chain management considering new product development
A Rostami, MM Paydar, E Asadi-Gangraj
Computers & Industrial Engineering 145, 106565, 2020
402020
Metaheuristic algorithms to allocate and schedule of the rescue units in the natural disaster with fatigue effect
S Nayeri, E Asadi-Gangraj, S Emami
Neural Computing and Applications 31 (11), 7517–7537, 2019
332019
Reaching sustainability through collection center selection considering risk: using the integration of Fuzzy ANP-TOPSIS and FMEA
M Pourmehdi, MM Paydar, E Asadi-Gangraj
Soft Computing 25, 10885-10899, 2021
322021
Goal programming-based post-disaster decision making for allocation and scheduling the rescue units in natural disaster with time-window
S Nayeri, GE ASADI, S Emami
INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND PRODUCTION RESEARCH …, 2018
182018
A multi-objective location-routing model for dental waste considering environmental factors
G Kordi, P Hasanzadeh-Moghimi, MM Paydar, E Asadi-Gangraj
Annals of Operations Research, 1-38, 2023
152023
Lagrangian relaxation approach to minimize makespan for hybrid flow shop scheduling problem with unrelated parallel machines
E Asadi-Gangraj
Scientia Iranica 25 (6), 3765-3775, 2018
142018
Flexible Flow Shop Scheduling Problem to Minimize Makespan with Renewable Resources
N Abbaszadeh, E Asadi-Gangraj, S Emami
Scientia Iranica 28 (3), 1853- 1870, 2021
132021
A hybrid approach based on LP metric method and genetic algorithm for the vehicle-routing problem with time windows, driver-specific times, and vehicles-specific capacities
E Asadi-Gangraj, S Nayeri
International Journal of Operations Research and Information Systems (IJORIS …, 2018
132018
Designing a reverse logistics network to manage construction and demolition wastes: A robust bi-level approach
A Jahangiri, E Asadi-Gangraj, A Nemati
Journal of Cleaner Production 380, 134809, 2022
122022
Designing a bi-objective decision support model for the disaster management
S Nayeri, E Asadi-Gangraj, S Emami, J Rezaeian
RAIRO-Operations Research 55 (6), 3399-3426, 2021
112021
Scheduling on flexible flow shop with cost-related objective function considering outsourcing options
M Enayati, E Asadi-Gangraj, MM Paydar
Journal of Optimization in Industrial Engineering 14 (2), 69-88, 2021
62021
A Simultaneous Worker Assignment and Scheduling Problem to Minimize Makespan in Flexible Flow Shop via Metaheuristic Approaches
E Asadi-Gangraj, F Bozorgnezhad, MM Paydar
نشریه بین المللی مهندسی صنایع و تحقیقات تولید 30 (2), 207-223, 2019
6*2019
A new Lower Bound for Flexible Flow Shop Problem with unrelated parallel machines
N NAHAVANDI, E ASADI-GANGRAJ
INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND PRODUCTION RESEARCH …, 2014
52014
A bi-objective model for Cancer hospitals’ location and cancer patients’ allocation in Iran
M Haghshenas, A Nemati, E Asadi-Gangraj
Int J Hosp Res 10 (4), 1-18, 2021
42021
A Metaheuristic approach for batch sizing and scheduling problem in flexible flow shop with unrelated parallel machines
E Asadi-Gangraj, N Nahavandi
International journal of computer applications 97 (6), 2014
42014
系统目前无法执行此操作,请稍后再试。
文章 1–20