关注
Михаил Маринин Mikhail Marinin
Михаил Маринин Mikhail Marinin
Санкт-Петербургский горный университет Saint Petersburg Mining University
在 pers.spmi.ru 的电子邮件经过验证 - 首页
标题
引用次数
引用次数
年份
Recycling of coal fly ash as an example of an efficient circular economy: A stakeholder approach
O Marinina, M Nevskaya, I Jonek-Kowalska, R Wolniak, M Marinin
Energies 14 (12), 3597, 2021
462021
Assessing of losses and dilution impact on the cost chain: Case study of gold ore deposits
M Marinin, O Marinina, R Wolniak
Sustainability 13 (7), 3830, 2021
242021
Methodological approach to assessing influence of blasted rock fragmentation on mining costs
MA Marinin, OA Marinina, RA Rakhmanov
Gornyi Zhurnal 2023 (9), 28-34, 2023
222023
Improvement of project decisions efficiency and cost optimization at the mine engineering stage of reclamation in the context of open pit ore mining
M Marinin, O Marinina
International Multidisciplinary Scientific GeoConference: SGEM 17 (1.3), 423-428, 2017
222017
Determination of rock mass weakening coefficient after blasting in various fracture zones
V Isheyskiy, M Marinin
Engineering Solid Mechanics 5 (3), 199-204, 2017
172017
Selecting cyclical-and-continuous process flow diagrams for deep open pit mines
VL Yakovlev, VA Bersenev, AV Glebov, SS Kulniyaz, MA Marinin
Journal of Mining Science 55, 783-788, 2019
142019
Comprehensive study of filtration properties of pelletized sandy clay ores and filtration modes in the heap leaching stack
MA Marinin, MA Karasev, GB Pospehov, AA Pomortseva, VN Kondakova, ...
Записки Горного института, 30-40, 2023
132023
Modeling of the welding process of flat sheet parts by an explosion
MA Marinin, SV Khokhlov, VA Isheyskiy
Записки Горного института 237, 275-280, 2019
132019
Blasting preparation for selective mining of complex structured ore deposition
MA Marinin, VV Dolzhikov
IOP Conference Series: Earth and Environmental Science 87 (5), 052016, 2017
132017
Quality preparation improvement of mined rock for mining extraction considering spatial temporary formation of field strain
VV Dolzhikov, MA Marinin
IOP Conference Series: Earth and Environmental Science 87 (5), 052003, 2017
122017
Combination of fracturing areas after blasting column charges during destruction of rocks
V Isheyskiy, M Marinin, V Dolzhikov
International Journal of Engineering Research and Technology 12 (12), 2953-2956, 2019
112019
State-of-Art of mine engineering reclamation while developing of steep-dipping ore fields
MA Marinin, VA Isheysky
Asian Journal of Microbiology, Biotechnology and Environmental Sciences 19 …, 2017
102017
Sushkova VI Effect of grain size distribution of blasted rock on WK-35 shovel performance
MA Marinin, RA Rakhmanov, IA Alenichev, PI Afanasyev
MIAB. Mining Inf. Anal. Bull, 111-125, 2023
92023
Engineering and geological parameters for heap leaching of gold from low-grade sandy clay ores: A feasibility study
MA Marinin, MA Karasev, GB Pospekhov, AA Pomortseva, VI Sushkova
Mining Inf. Anal. Bull 9, 22-37, 2023
72023
Production of Blasting Operations for a Given Granulometric Composition of Ore within the Framework of the “Mine-to-Mill” Concept: Current State and Prospects
MA Marinin, MV Evgrafov, VV Dolzhikov
Bulletin of the Tomsk Polytechnic University. Geo Assets Engineering 332 (7 …, 2021
72021
Quality improvement of mining specialists tarining on the basis of cooperation between Saint-Petersburg mining university and Orica company
MN Overchenko, MA Marinin, SP Mozer
Записки Горного института 228, 681-687, 2017
72017
Methodological approach to assessing influence of blasted rock fragmentation on mining costs. Gornyi Zhurnal, 2023 (9), 28-34
MA Marinin, OA Marinina, RA Rakhmanov
62023
Practice of underground leaching of uranium in blocks
VI Golik, MA Marinin
MIAB. Mining Inf. Anal. Bull, 6-1, 2022
62022
Профессиональная переподготовка в системе кадрового обеспечения горных предприятий
ОИ Казанин, МА Маринин, АМ Блинов
Безопасность труда в промышленности, 79-84, 2021
62021
Improving the efficiency of drilling and blasting operations for high water cut conditions
MA Marinin, VV Dolzhikov, VA Isheyskiy
Key Engineering Materials 836, 124-130, 2020
62020
系统目前无法执行此操作,请稍后再试。
文章 1–20