关注
Mohammad Waqar Ali Asad
Mohammad Waqar Ali Asad
在 curtin.edu.au 的电子邮件经过验证
标题
引用次数
引用次数
年份
Net present value maximization model for optimum cut-off grade policy of open pit mining operations
MWA Asad, E Topal
Journal of the Southern African Institute of Mining and Metallurgy 111 (11 …, 2011
1002011
Cutoff grade optimization algorithm with stockpiling option for open pit mining operations of two economic minerals
MWA Asad
International Journal of Surface Mining, Reclamation and Environment 19 (3 …, 2005
992005
Optimum cut‐off grade policy for open pit mining operations through net present value algorithm considering metal price and cost escalation
MWA Asad
Engineering Computations 24 (7), 723-736, 2007
962007
Implementing a parametric maximum flow algorithm for optimal open pit mine design under uncertain supply and demand
MWA Asad, R Dimitrakopoulos
Journal of the Operational Research Society 64 (2), 185-197, 2013
952013
A heuristic approach to stochastic cutoff grade optimization for open pit mining complexes with multiple processing streams
MWA Asad, R Dimitrakopoulos
Resources Policy 38 (4), 591-597, 2013
722013
A review of cut-off grade policy models for open pit mining operations
MWA Asad, MA Qureshi, H Jang
Resources Policy 49, 142-152, 2016
642016
Production phase and ultimate pit limit design under commodity price uncertainty
S Chatterjee, MR Sethi, MWA Asad
European Journal of Operational Research 248 (2), 658-667, 2016
642016
A heuristic approach to optimal design of an underground mine stope layout
DSS Sandanayake, E Topal, MWA Asad
Applied Soft Computing 30, 595-603, 2015
582015
Simultaneous stochastic optimization of production sequence and dynamic cut-off grades in an open pit mining operation
A Paithankar, S Chatterjee, R Goodfellow, MWA Asad
Resources Policy 66, 101634, 2020
502020
Designing an optimal stope layout for underground mining based on a heuristic algorithm
DSS Sandanayake, E Topal, MWA Asad
International Journal of Mining Science and Technology 25 (5), 767-772, 2015
482015
Optimal production scale of open pit mining operations with uncertain metal supply and long-term stockpiles
MWA Asad, R Dimitrakopoulos
Resources policy 37 (1), 81-89, 2012
432012
A new model for open-pit production and waste-dump scheduling
Z Fu, MWA Asad, E Topal
Engineering Optimization 51 (4), 718-732, 2019
422019
Review of solution methodologies for open pit mine production scheduling problem
K Fathollahzadeh, MWA Asad, E Mardaneh, M Cigla
International Journal of Mining, Reclamation and Environment 35 (8), 564-599, 2021
322021
Stochastic production phase design for an open pit mining complex with multiple processing streams
MWA Asad, R Dimitrakopoulos, J Eldert
Engineering Optimization 46 (8), 1139-1152, 2014
322014
A mixed-integer linear programming (MILP) model for short-range production scheduling of cement quarry operations
SU Rehman, MWA Asad
Asia-Pacific journal of operational research 27 (03), 315-333, 2010
322010
A mathematical model for open pit mine production scheduling with Grade Engineering® and stockpiling
K Fathollahzadeh, E Mardaneh, M Cigla, MWA Asad
International Journal of Mining Science and Technology 31 (4), 717-728, 2021
302021
Khan, G. u., Asif, MU, & Aftab, U.(2021). Sequential mediation of innovativeness and competitive advantage between resources for business model innovation and SMEs performance
AA Khan, M Asad
2021 International Conference on Decision Aid Sciences and Application (DASA …, 0
29
A review of machine learning applications for underground mine planning and scheduling
P Chimunhu, E Topal, AD Ajak, W Asad
Resources Policy 77, 102693, 2022
282022
A mathematical programming model for optimal cut-off grade policy in open pit mining operations with multiple processing streams
A Khan, MWA Asad
International Journal of Mining, Reclamation and Environment 34 (3), 149-158, 2020
272020
A heuristic approach to long-range production planning of cement quarry operations
MWA Asad
Production Planning & Control 22 (4), 353-364, 2011
272011
系统目前无法执行此操作,请稍后再试。
文章 1–20