关注
Emilio Carlos Piesciorovsky
Emilio Carlos Piesciorovsky
Lab Space Manager
在 ornl.gov 的电子邮件经过验证
标题
引用次数
引用次数
年份
Fuse relay adaptive overcurrent protection scheme for microgrid with distributed generators
EC Piesciorovsky, NN Schulz
IET Generation, Transmission & Distribution 11 (2), 540-549, 2017
762017
Comparison of Programmable Logic and Setting Group Methods for adaptive overcurrent protection in microgrids
EC Piesciorovsky, NN Schulz
Electric Power Systems Research 151, 273-282, 2017
382017
Comparison of non-real-time and real-time simulators with relays in-the-loop for adaptive overcurrent protection
EC Piesciorovsky, NN Schulz
Electric Power Systems Research 143, 657-668, 2017
222017
Protection schemes used in North American microgrids
EC Piesciorovsky, T Smith, TB Ollis
International Transactions on Electrical Energy Systems 30 (9), e12461, 2020
212020
Microgrid fault location: Challenges and solutions
S Hossain-McKenzie, EC Piesciorovsky, MJ Reno, JC Hambrick
Sandia National Laboratories: Albuquerque, NM, USA, 2018
202018
Electrical substation grid testbed for DLT applications of electrical fault detection, power quality monitoring, DERs use cases and cyber-events
EC Piesciorovsky, G Hahn, RB Hink, A Werth, A Lee
Energy Reports 10, 1099-1115, 2023
82023
Modeling the impact of GIC neutral blocking devices on distance protection relay operations for transmission lines
EC Piesciorovsky, AG Tarditi
Electric Power Systems Research 180, 106135, 2020
82020
Comparison of high‐speed adaptive and nonadaptive backup overcurrent protection on fuse feeders with sensors
EC Piesciorovsky, MF Ferrari Maglia
International Transactions on Electrical Energy Systems 29 (4), e2812, 2019
72019
Burns & McDonnell—K-State Smart Grid Laboratory: Protection, communication & power metering
EC Piesciorovsky, NN Schulz
2014 IEEE PES General Meeting| Conference & Exposition, 1-5, 2014
72014
Variable frequency response testbed to validate protective relays up to 20 kHz✰
EC Piesciorovsky, T Karnowski
Electric Power Systems Research 194, 107071, 2021
62021
Assessment of the Phase‐to‐Ground Fault Apparent Admittance Method with Phase/Ground Boundaries to Detect Types of Electrical Faults for Protective Relays Using Signature …
EC Piesciorovsky, ME Morales Rodriguez
International Transactions on Electrical Energy Systems 2022 (1), 1951836, 2022
52022
A generic method for interfacing IEDs using low voltage interfaces to real-time simulators with hardware in the loop
EC Piesciorovsky, T Smith, SK Mukherjee, MW Marshall
Electric Power Systems Research 199, 107431, 2021
52021
High Voltage Modeling and Testing of Transformer, Line Interface Devices, and Bulk System Components Under Electromagnetic Pulse, Geomagnetic Disturbance, and other Abnormal …
AG Tarditi, JS Besnoff, R Duckworth, FR Li, Z Li, Y Liu, BW Mcconnell, ...
Oak Ridge National Lab.(ORNL), Oak Ridge, TN (United States), 2019
52019
Relay in the loop test procedures for adaptive overcurrent protection
EC Piesciorovsky
Kansas State University, 2015
52015
Oak Ridge National Laboratory Pilot Demonstration of an Attestation and Anomaly Detection Framework using Distributed Ledger Technology for Power Grid Infrastructure
G Hahn, A Werth, EC Piesciorovsky, W Monday, Y Polsky, A Lee, ...
Oak Ridge National Lab.(ORNL), Oak Ridge, TN (United States), 2022
42022
Tunable Q-wavelet transform based entropy measurement to detect and classify faults in certs microgrid test bed
SRK Joga, P Sinha, MK Maharana, C Jena
2021 International Conference in Advances in Power, Signal, and Information …, 2021
42021
Heat gain from adjustable speed (variable frequency) drives
EC Piesciorovsky
ASHRAE Transactions 116, 608, 2010
42010
Building Heat Load Contributions from Medium and Low Voltage Switchgear-Part II: Component and Overall Switchgear Heat Gains.
EC Piesciorovsky, WN White
ASHRAE Transactions 115 (2), 2009
42009
Building Heat Load Contributions from Medium and Low Voltage Switchgear: Part I–Solid Rectangular Bus Bar Heat Losses
WN White, EC Piesciorovsky
ASHRAE Transactions 115 (2), 370-381, 2009
42009
Assessment and Commissioning of Electrical Substation Grid Testbed with a Real-Time Simulator and Protective Relays/Power Meters in the Loop
EC Piesciorovsky, R Borges Hink, A Werth, G Hahn, A Lee, Y Polsky
Energies 16 (11), 4407, 2023
32023
系统目前无法执行此操作,请稍后再试。
文章 1–20