Fuse relay adaptive overcurrent protection scheme for microgrid with distributed generators EC Piesciorovsky, NN Schulz IET Generation, Transmission & Distribution 11 (2), 540-549, 2017 | 76 | 2017 |
Comparison of Programmable Logic and Setting Group Methods for adaptive overcurrent protection in microgrids EC Piesciorovsky, NN Schulz Electric Power Systems Research 151, 273-282, 2017 | 38 | 2017 |
Comparison of non-real-time and real-time simulators with relays in-the-loop for adaptive overcurrent protection EC Piesciorovsky, NN Schulz Electric Power Systems Research 143, 657-668, 2017 | 22 | 2017 |
Protection schemes used in North American microgrids EC Piesciorovsky, T Smith, TB Ollis International Transactions on Electrical Energy Systems 30 (9), e12461, 2020 | 21 | 2020 |
Microgrid fault location: Challenges and solutions S Hossain-McKenzie, EC Piesciorovsky, MJ Reno, JC Hambrick Sandia National Laboratories: Albuquerque, NM, USA, 2018 | 20 | 2018 |
Electrical substation grid testbed for DLT applications of electrical fault detection, power quality monitoring, DERs use cases and cyber-events EC Piesciorovsky, G Hahn, RB Hink, A Werth, A Lee Energy Reports 10, 1099-1115, 2023 | 8 | 2023 |
Modeling the impact of GIC neutral blocking devices on distance protection relay operations for transmission lines EC Piesciorovsky, AG Tarditi Electric Power Systems Research 180, 106135, 2020 | 8 | 2020 |
Comparison of high‐speed adaptive and nonadaptive backup overcurrent protection on fuse feeders with sensors EC Piesciorovsky, MF Ferrari Maglia International Transactions on Electrical Energy Systems 29 (4), e2812, 2019 | 7 | 2019 |
Burns & McDonnell—K-State Smart Grid Laboratory: Protection, communication & power metering EC Piesciorovsky, NN Schulz 2014 IEEE PES General Meeting| Conference & Exposition, 1-5, 2014 | 7 | 2014 |
Variable frequency response testbed to validate protective relays up to 20 kHz✰ EC Piesciorovsky, T Karnowski Electric Power Systems Research 194, 107071, 2021 | 6 | 2021 |
Assessment of the Phase‐to‐Ground Fault Apparent Admittance Method with Phase/Ground Boundaries to Detect Types of Electrical Faults for Protective Relays Using Signature … EC Piesciorovsky, ME Morales Rodriguez International Transactions on Electrical Energy Systems 2022 (1), 1951836, 2022 | 5 | 2022 |
A generic method for interfacing IEDs using low voltage interfaces to real-time simulators with hardware in the loop EC Piesciorovsky, T Smith, SK Mukherjee, MW Marshall Electric Power Systems Research 199, 107431, 2021 | 5 | 2021 |
High Voltage Modeling and Testing of Transformer, Line Interface Devices, and Bulk System Components Under Electromagnetic Pulse, Geomagnetic Disturbance, and other Abnormal … AG Tarditi, JS Besnoff, R Duckworth, FR Li, Z Li, Y Liu, BW Mcconnell, ... Oak Ridge National Lab.(ORNL), Oak Ridge, TN (United States), 2019 | 5 | 2019 |
Relay in the loop test procedures for adaptive overcurrent protection EC Piesciorovsky Kansas State University, 2015 | 5 | 2015 |
Oak Ridge National Laboratory Pilot Demonstration of an Attestation and Anomaly Detection Framework using Distributed Ledger Technology for Power Grid Infrastructure G Hahn, A Werth, EC Piesciorovsky, W Monday, Y Polsky, A Lee, ... Oak Ridge National Lab.(ORNL), Oak Ridge, TN (United States), 2022 | 4 | 2022 |
Tunable Q-wavelet transform based entropy measurement to detect and classify faults in certs microgrid test bed SRK Joga, P Sinha, MK Maharana, C Jena 2021 International Conference in Advances in Power, Signal, and Information …, 2021 | 4 | 2021 |
Heat gain from adjustable speed (variable frequency) drives EC Piesciorovsky ASHRAE Transactions 116, 608, 2010 | 4 | 2010 |
Building Heat Load Contributions from Medium and Low Voltage Switchgear-Part II: Component and Overall Switchgear Heat Gains. EC Piesciorovsky, WN White ASHRAE Transactions 115 (2), 2009 | 4 | 2009 |
Building Heat Load Contributions from Medium and Low Voltage Switchgear: Part I–Solid Rectangular Bus Bar Heat Losses WN White, EC Piesciorovsky ASHRAE Transactions 115 (2), 370-381, 2009 | 4 | 2009 |
Assessment and Commissioning of Electrical Substation Grid Testbed with a Real-Time Simulator and Protective Relays/Power Meters in the Loop EC Piesciorovsky, R Borges Hink, A Werth, G Hahn, A Lee, Y Polsky Energies 16 (11), 4407, 2023 | 3 | 2023 |