Performance prediction of hard rock TBM using Rock Mass Rating (RMR) system JK Hamidi, K Shahriar, B Rezai, J Rostami Tunnelling and Underground Space Technology 25 (4), 333-345, 2010 | 308 | 2010 |
Geotechnical risk assessment based approach for rock TBM selection in difficult ground conditions K Shahriar, M Sharifzadeh, JK Hamidi Tunnelling and Underground Space Technology 23 (3), 318-325, 2008 | 143 | 2008 |
Application of fuzzy set theory to rock engineering classification systems: an illustration of the rock mass excavability index J Khademi Hamidi, K Shahriar, B Rezai, H Bejari Rock mechanics and rock engineering 43, 335-350, 2010 | 117 | 2010 |
Simultaneous effects of joint spacing and orientation on TBM cutting efficiency in jointed rock masses H Bejari, J Khademi Hamidi Rock mechanics and rock engineering 46, 897-907, 2013 | 102 | 2013 |
Risk assessment based selection of rock TBM for adverse geological conditions using Fuzzy-AHP J Khademi Hamidi, K Shahriar, B Rezai, J Rostami, H Bejari Bulletin of engineering geology and the environment 69, 523-532, 2010 | 93 | 2010 |
A case study on TBM tunnelling in fault zones and lessons learned from ground improvement M Bayati, JK Hamidi Tunnelling and Underground Space Technology 63, 162-170, 2017 | 89 | 2017 |
Optimization of flyrock and rock fragmentation in the Tajareh limestone mine using metaheuristics method of firefly algorithm PF Asl, M Monjezi, JK Hamidi, DJ Armaghani Engineering with Computers 34, 241-251, 2018 | 84 | 2018 |
The integrated optimization of underground stope layout designing and production scheduling incorporating a non-dominated sorting genetic algorithm (NSGA-II) S Foroughi, JK Hamidi, M Monjezi, M Nehring Resources Policy 63, 101408, 2019 | 42 | 2019 |
An investigation of the relationship between muck geometry, TBM performance, and operational parameters: A case study in Golab II water transfer tunnel S Heydari, JK Hamidi, M Monjezi, A Eftekhari Tunnelling and Underground Space Technology 88, 73-86, 2019 | 41 | 2019 |
A closer look into chip shape/size and efficiency of rock cutting with a simple chisel pick: a laboratory scale investigation M Mohammadi, J Khademi Hamidi, J Rostami, K Goshtasbi Rock Mechanics and Rock Engineering 53, 1375-1392, 2020 | 40 | 2020 |
A discrepancy between observed and predicted NATM tunnel behaviors and updating: a case study of the Sabzkuh tunnel M Taromi, A Eftekhari, JK Hamidi, A Aalianvari Bulletin of Engineering Geology and the Environment 76, 713-729, 2017 | 38 | 2017 |
An estimation of the penetration rate of rotary drills using the Specific Rock Mass Drillability index A Cheniany, KS Hasan, K Shahriar, JK Hamidi International Journal of Mining Science and Technology 22 (2), 187-193, 2012 | 37 | 2012 |
An integrated GIS-based approach for geohazards risk assessment in coal mines V Vaziri, J Khademi Hamidi, AR Sayadi Environmental earth sciences 77, 1-18, 2018 | 27 | 2018 |
A comparison of artificial neural network and multiple regression analysis in TBM performance prediction M Gholami, K Shahriar, M Sharifzadeh, JK Hamidi ISRM International Symposium-Asian Rock Mechanics Symposium, ISRM-ARMS7-2012-115, 2012 | 26 | 2012 |
TBM tunneling and analysis of high gas emission accident in Zagros long tunnel K Shahriar, J Rostami, J KhademiHamidi Proceedings of the ITA-AITES World Tunnel Congress, 2009 | 18 | 2009 |
Assessment of ground squeezing and ground pressure imposed on TBM shield JK Hamidi, H Bejari, K Shahriar, B Rezai Proceedings of the 12th International Conference of International …, 2008 | 14 | 2008 |
Use of rock microscale properties for introducing a cuttability index in rock cutting with a chisel pick K Rostami, JK Hamidi, HR Nejati Arabian Journal of Geosciences 13 (18), 960, 2020 | 13 | 2020 |
Application of decision tree to selection of MTBM for adverse geological conditions A Jafarimoghaddam, JK Hamidi, M Najafi International Journal of Mining Science and Technology 23 (4), 503-511, 2013 | 10 | 2013 |
Simultaneous effects of joint spacing and orientation on the penetration rate of TBM using numerical modeling H Bejari, JK Hamidi ISRM SINOROCK, ISRM-SINOROCK-2009-083, 2009 | 9 | 2009 |
A preliminary cost estimation for short tunnels construction using parametric method AR Sayadi, JK Hamidi, M Monjezi, M Najafzadeh Engineering Geology for Society and Territory-Volume 1: Climate Change and …, 2015 | 8 | 2015 |