Facilitating claims settlement using building information modeling in the school building projects RAR Ibraheem, AMR Mahjoob Innovative Infrastructure Solutions 7, 1-17, 2022 | 16 | 2022 |
Integrated project delivery (IPD) method with BIM to improve the project performance: a case study in the Republic of Iraq MS Salim, AMR Mahjoob Asian Journal of Civil Engineering 21, 947-957, 2020 | 16 | 2020 |
Identify the main factors affecting labor productivity within different organizational structures in the Iraqi construction sector ZRA Al-Rubaye, AMR Mahjoob IOP Conference Series: Materials Science and Engineering 745 (1), 012146, 2020 | 12 | 2020 |
Using AHP to prioritize the corruption risk practices in the Iraqi construction sector SHN Alani, AMR Mahjoob Asian Journal of Civil Engineering 22 (7), 1281-1299, 2021 | 10 | 2021 |
Corruption risk analysis at the project planning stage in the Iraqi construction sector using the bowtie methodology SHN Alani, AMR Mahjoob Engineering, Technology & Applied Science Research 11 (3), 7223-7227, 2021 | 8 | 2021 |
Using BIM for optimizing the upgrading cost to convert the traditional buildings to sustainable buildings in iraq SA Abdulrasool, AMR Mahjoob IOP Conference Series: Materials Science and Engineering 901 (1), 012024, 2020 | 7 | 2020 |
Assessing BIM integration with sustainable requirement for buildings construction A Mahjoob, MM Abed International Journal of Science and Research (IJSR) 6, 2258-2265, 2015 | 7 | 2015 |
Solving Time-Cost Tradeoff Problem with Resource Constraint Using Fuzzy Mathematical Model SM Rashed, AMR Mahjoob Journal of Engineering 20 (09), 10-29, 2014 | 7 | 2014 |
Supply Chain Management of Infrastructure Projects in Iraq DS Jarallah, AMR Mahjoob Engineering, Technology & Applied Science Research 12 (3), 8611-8616, 2022 | 6 | 2022 |
investigating the critical success factors for water supply projects: case of Iraq OA Al-Juboori, HA Rashid, AMR Mahjoob Civil and Environmental Engineering 17 (2), 438-449, 2021 | 6 | 2021 |
Exploring the factors affecting the elemental cost estimation with relationship analysis using AHP AMR Mahjoob, MR Wali, HA Atyah Journal of Engineering 22 (8), 1-13, 2016 | 6 | 2016 |
Using measured mile method to quantify the loss of labor productivity in Iraqi construction site ZRA Al-Rubaye, AMR Mahjoob Asian Journal of Civil Engineering 21, 1287-1296, 2020 | 5 | 2020 |
Achieving the benefits and requirements of integrated project delivery method using BIM MS Salim, AMR Mahjoob IOP Conference Series: Materials Science and Engineering 901 (1), 012033, 2020 | 5 | 2020 |
Safety management in private construction project in Iraq HA Rashid, OA Al-juboori, AMR Mahjoob Periodicals of Engineering and Natural Sciences 9 (1), 322-335, 2021 | 4 | 2021 |
Risk Response in Construction Project: A Review Study HO Ghaeb, AMR Mahjoob Journal of Engineering 29 (08), 121-137, 2023 | 3 | 2023 |
New cost control techniques in mega construction projects HA Rashid, OA Al-juboori, AMRMR Mahjoob Periodicals of Engineering and Natural Sciences 9 (2), 454-461, 2021 | 3 | 2021 |
An Extensive Literature Review on Risk Assessment Models (Techniques and Methodology) for Construction Industry RJK Jalhoom, AMR Mahjoob Journal of Engineering 29 (08), 76-93, 2023 | 2 | 2023 |
Identification of key criteria of selecting the delivery system and type of contract in construction projects SAM Alkaabi, AMR Mahjoob Proceedings of Seventh International Congress on Information and …, 2022 | 2 | 2022 |
Pavement maintenance management using multi-objective optimization:(case study: Wasit governorate-iraq) AK Shadhar, AM Raoof Mahjoob International Journal of Engineering 33 (11), 2155-2161, 2020 | 2 | 2020 |
The Effect of Age and occupation on the Type and the Number of workers injuries in construction sector in Iraq AMR Mahjoob Journal of Engineering 20 (12), 31-44, 2014 | 2 | 2014 |