“Flipping” the classroom to explore active learning in a large undergraduate course S Zappe, R Leicht, J Messner, T Litzinger, HW Lee 2009 Annual Conference & Exposition, 14.1385. 1-14.1385. 21, 2009 | 591 | 2009 |
Impact of team integration and group cohesion on project delivery performance B Franz, R Leicht, K Molenaar, J Messner Journal of construction engineering and management 143 (1), 04016088, 2017 | 240 | 2017 |
BIM Project Execution Planning Guide (v. 3.0) J Messner, C Anumba, C Dubler, S Goodman, C Kasprzak, R Kreider, ... Computer Integrated Construction Research Program, Pennsylvania State University, 2020 | 136* | 2020 |
Evaluating the impact of virtual reality on design review meetings Y Liu, F Castronovo, J Messner, R Leicht Journal of Computing in Civil Engineering 34 (1), 04019045, 2020 | 82 | 2020 |
Practices for designing cross-functional teams for integrated project delivery J Laurent, RM Leicht Journal of Construction Engineering and Management 145 (3), 05019001, 2019 | 81 | 2019 |
Employing the classroom flip to move “lecture” out of the classroom R Leicht, S Zappe, JI Messner, T Litzinger Journal of Applications and Practices in Engineering Education 3 (1), 19-31, 2012 | 65 | 2012 |
Implementing observational research methods to study team performance in construction management RM Leicht, ST Hunter, C Saluja, JI Messner Journal of Construction Engineering and Management 136 (1), 76-86, 2010 | 62 | 2010 |
Automated rule-based constructability checking: Case study of formwork L Jiang, RM Leicht Journal of Management in Engineering 31 (1), A4014004, 2015 | 61 | 2015 |
An alternative classification of project delivery methods used in the United States building construction industry BW Franz, RM Leicht Construction management and economics 34 (3), 160-173, 2016 | 53 | 2016 |
Process indicators to track effectiveness of high-performance green building projects P Gultekin, S Mollaoglu-Korkmaz, DR Riley, RM Leicht Journal of construction engineering and management 139 (12), A4013005, 2013 | 53 | 2013 |
BIM server requirements to support the energy efficient building lifecycle Y Jiang, J Ming, D Wu, J Yen, P Mitra, JI Messner, R Leicht Computing in Civil Engineering (2012), 365-372, 2012 | 40 | 2012 |
Project impacts of specialty mechanical contractor design involvement in the health care industry: Comparative case study BW Franz, RM Leicht, DR Riley Journal of Construction Engineering and Management 139 (9), 1091-1097, 2013 | 36 | 2013 |
Comparing traditional schematic design documentation to a schematic building information model RM Leicht, JI Messner Bringing ITCKnowledge to Work: 2Proceedings of the 24th W78 Conference …, 2007 | 36 | 2007 |
Operationalizing emotional intelligence for team performance GA Macht, DA Nembhard, RM Leicht International Journal of Industrial Ergonomics 71, 57-63, 2019 | 34 | 2019 |
Integrating BIMserver and OpenStudio for energy efficient building N Yu, Y Jiang, L Luo, S Lee, A Jallow, D Wu, JI Messner, RM Leicht, J Yen Computing in Civil Engineering (2013), 516-523, 2013 | 33 | 2013 |
Case study of integrated decision-making for deep energy-efficient retrofits P Gultekin, C J. Anumba, R M. Leicht International Journal of Energy Sector Management 8 (4), 434-455, 2014 | 30 | 2014 |
Initiating IPD Concepts on Campus Facilities with a" Collaboration Addendum" B Franz, RM Leicht Construction Research Congress 2012: Construction Challenges in a Flat World …, 2012 | 29 | 2012 |
Gaining end user involvement through virtual reality mock-ups: a medical facility case study RM Leicht, PM Abdelkarim, JI Messner Proceedings of the CIB W 78, 2010, 2010 | 29 | 2010 |
A process model for usability and maintainability design reviews Y Liu, JI Messner, RM Leicht Architectural Engineering and Design Management 14 (6), 457-469, 2018 | 28 | 2018 |
Development of a process model to support integrated design for energy efficient buildings S Lee, Y Liu, S Chunduri, RL Solnosky, JI Messner, RM Leicht, ... Computing in Civil Engineering (2012), 261-268, 2012 | 27 | 2012 |