关注
Professor Srinath Perera
Professor Srinath Perera
Professor of Built Environment & Construction Managemengt, Western Sydney University
在 westernsydney.edu.au 的电子邮件经过验证 - 首页
标题
引用次数
引用次数
年份
Cost studies of buildings
A Ashworth, S Perera
Routledge, 2015
8502015
Blockchain technology: Is it hype or real in the construction industry?
S Perera, S Nanayakkara, MNN Rodrigo, S Senaratne, R Weinand
Journal of industrial information integration 17, 100125, 2020
4712020
Digital twin application in the construction industry: A literature review
DGJ Opoku, S Perera, R Osei-Kyei, M Rashidi
Journal of Building Engineering 40, 102726, 2021
4242021
Contractual procedures in the construction industry
A Ashworth, S Perera
Pearson Education, 2006
329*2006
Drivers and barriers to public sector e-procurement within Northern Ireland’s construction industry
R Eadie, S Perera, G Heaney, J Carlisle
Journal of Information Technology in Construction 12, 103-120, 2007
1672007
Barriers to public private partnership projects in developing countries: A case of Nigeria
SO Babatunde, S Perera, L Zhou, C Udeaja
Engineering, Construction and Architectural Management 22 (6), 669-691, 2015
1582015
Case-based design: A review and analysis of building design applications
I Watson, S Perera
AI EDAM 11 (1), 59-87, 1997
1201997
Identification of e-procurement drivers and barriers for UK construction organisations and ranking of these from the perspective of quantity surveyors
R Eadie, S Perera, G Heaney
Journal of Information Technology in Construction 15, 23-43, 2010
1182010
A methodology for selection of a Blockchain platform to develop an enterprise system
S Nanayakkara, MNN Rodrigo, S Perera, GT Weerasuriya, AA Hijazi
Journal of Industrial Information Integration 23, 100215, 2021
1162021
Stakeholder perceptions on critical success factors for public-private partnership projects in Nigeria
SO Babatunde, S Perera, L Zhou, C Udeaja
Built Environment Project and Asset Management 6 (1), 74-91, 2016
942016
Blockchain and smart contracts: A solution for payment issues in construction supply chains
S Nanayakkara, S Perera, S Senaratne, GT Weerasuriya, HMND Bandara
Informatics 8 (2), 36, 2021
902021
Innovation management model: a tool for sustained implementation of product innovation into construction projects
ME Murphy, S Perera, G Heaney
Construction Management and Economics 33 (3), 209-232, 2015
802015
Product-cost modelling approach for the development of a decision support system for optimal roofing material selection
S Rahman, H Odeyinka, S Perera, Y Bi
Expert Systems with Applications 39 (8), 6857-6871, 2012
782012
Stakeholders’ perspective on blockchain and smart contracts solutions for construction supply chains
S Nanayakkara, S Perera, S Senaratne
CIB World Building Congress, 17-21, 2019
762019
A methodology for evaluating construction innovation constraints through project stakeholder competencies and FMEA
M Murphy, G Heaney, S Perera
Construction Innovation, 2011
732011
Potential application of blockchain technology for embodied carbon estimating in construction supply chains
MNN Rodrigo, S Perera, S Senaratne, X Jin
Buildings 10 (8), 140, 2020
702020
Analysis of the use of E-Procurement in the Public and Private Sectors of the UK construction Industry
R Eadie, S Perera, G Heaney
Journal of Information Technology in Construction 16, 669-686, 2011
662011
Rationale for the integration of BIM and blockchain for the construction supply chain data delivery: A systematic literature review and validation through focus group
AA Hijazi, S Perera, RN Calheiros, A Alashwal
Journal of construction engineering and management 147 (10), 03121005, 2021
642021
A cross-discipline comparison of rankings for e-procurement drivers and barriers within UK construction organisations
R Eadie, S Perera, G Heaney
Journal of Information Technology in Construction, 217-233, 2010
632010
A hierarchical case representation using context guided retrieval
S Perera, I Watson
Knowledge-based Systems 11, 285-292, 1998
631998
系统目前无法执行此操作,请稍后再试。
文章 1–20