关注
Majid Ataee-pour
Majid Ataee-pour
在 aut.ac.ir 的电子邮件经过验证
标题
引用次数
引用次数
年份
Development of a model to predict peak particle velocity in a blasting operation
H Dehghani, M Ataee-Pour
International Journal of Rock Mechanics and Mining Sciences 48 (1), 51-58, 2011
1412011
Integration of sustainable development concepts in open pit mine design
N Adibi, M Ataee-pour, M Rahmanpour
Journal of Cleaner Production 108, 1037-1049, 2015
812015
A critical survey of the existing stope layout optimization techniques
M Ataee-Pour
Journal of Mining Science 41, 447-466, 2005
722005
Determination of the effect of operating cost uncertainty on mining project evaluation
H Dehghani, M Ataee-Pour
Resources Policy 37 (1), 109-117, 2012
702012
A new model for mining method selection of mineral deposit based on fuzzy decision making
F Samimi Namin, K Shahriar, M Ataee-Pour, H Dehghani
Journal of the Southern African Institute of Mining and Metallurgy 108 (7 …, 2008
662008
A heuristic algorithm to optimise stope boundaries
M Ataee-Pour
552000
Evaluation of the mining projects under economic uncertainties using multidimensional binomial tree
H Dehghani, M Ataee-pour, A Esfahanipour
Resources Policy 39, 124-133, 2014
482014
A 3D approximate hybrid algorithm for stope boundary optimization
V Nikbin, M Ataee-Pour, K Shahriar, Y Pourrahimian
Computers & Operations Research 115, 104475, 2020
342020
Optimisation of stope limits using a heuristic approach
M Ataee-Pour
Mining Technology 113 (2), 123-128, 2004
342004
Channel characterization using multiple-point geostatistics, neural network, and modern analogy: A case study from a carbonate reservoir, southwest Iran
S Hashemi, A Javaherian, M Ataee-pour, P Tahmasebi, H Khoshdel
Journal of Applied Geophysics 111, 47-58, 2014
322014
A 2D dynamic programming algorithm to optimize stope boundaries
SE Jalali, M Ataee-Pour
Proceedings of the 13th Symposium on Mine Planning and Equipment Selection …, 2004
272004
Pit limits optimization using a stochastic process
SE Jalali, M Ataee-Pour, K Shahriar
CIM Magazine 1 (6), 90, 2006
262006
Investigating the impact of gas emission uncertainty on airflow distribution in an auxiliary ventilation system using CFD and Monte-Carlo simulation
S Rahimi, M Ataee-pour, H Madani, SM Aminossadati
Building and Environment 204, 108165, 2021
232021
Determination of the effect of economic uncertainties on mining project evaluation using Real Option Valuation
H Dehghani, M Ataee-Pour
International Journal of Mining and Mineral Engineering 4 (4), 265-277, 2013
222013
A hybrid augmented Lagrangian multiplier method for the open pit mines long-term production scheduling problem optimization
E Moosavi, J Gholamnejad, M Ataee-Pour, E Khorram
Journal of Mining Science 50, 1047-1060, 2014
202014
Improvement of Lagrangian relaxation performance for open pit mines constrained long-term production scheduling problem
E Moosavi, J Gholamnejad, M Ataee-Pour, E Khorram
Journal of Central South University 21, 2848-2856, 2014
192014
Stope boundary optimization: A mathematical model and efficient heuristics
V Nikbin, M Ataee-Pour, K Shahriar, Y Pourrahimian, SA MirHassani
Resources Policy 62, 515-526, 2019
182019
Optimal extraction sequence modeling for open pit mining operation considering the dynamic cutoff grade
E Moosavi, J Gholamnejad, M Ataee-Pour, E Khorram
Gospodarka Surowcami Mineralnymi 30, 2014
182014
A new heuristic algorithm to optimise stope boundaries
M Ataee-Pour
Proceeding of the 2nd Regional APCOM Symposium on Computer Applications in …, 1997
161997
Estimations of utility function and values of sustainable mining via the choice experiment method
S Narrei, M Ataee-pour
Journal of Cleaner production 267, 121938, 2020
152020
系统目前无法执行此操作,请稍后再试。
文章 1–20