Analysing factors affecting delays in Indian construction projects H Doloi, A Sawhney, KC Iyer, S Rentala International Journal of Project Management, 2011 | 1053 | 2011 |
Structural equation model for assessing impacts of contractor's performance on project success H Doloi, KC Iyer, A Sawhney International journal of project management 29 (6), 687-695, 2011 | 375 | 2011 |
Construction 4.0 A Sawhney, M Riley, J Irizarry, M Riley Sawhney, A., Riley, M., Irizarry, J., Eds, 2020 | 270 | 2020 |
Structural equation model for investigating factors affecting delay in Indian construction projects H Doloi, A Sawhney, KC Iyer Construction Management and Economics 30 (10), 869-884, 2012 | 171 | 2012 |
Factors influencing BIM adoption in emerging markets–the case of India R Ahuja, A Sawhney, M Jain, M Arif, S Rakshit International Journal of Construction Management 20 (1), 65-76, 2020 | 170 | 2020 |
Adoption of BIM by architectural firms in India: technology–organization–environment perspective R Ahuja, M Jain, A Sawhney, M Arif Architectural engineering and design management 12 (4), 311-330, 2016 | 134 | 2016 |
Issues of construction health and safety in developing countries: a case of Jordan S Zaid Alkilani, J Jupp, A Sawhney Australasian Journal of Construction Economics and Building, The 13 (3), 141-156, 2013 | 114 | 2013 |
Adaptive probabilistic neural network-based crane type selection system A Sawhney, A Mund Journal of construction engineering and management 128 (3), 265-273, 2002 | 108 | 2002 |
Internet based interactive construction management learning system A Sawhney, J Marble, A Mund, A Vamadevan Construction Congress VI: Building Together for a Better Tomorrow in an …, 2000 | 93 | 2000 |
Driving lean and green project outcomes using BIM: A qualitative comparative analysis R Ahuja, A Sawhney, M Arif International Journal of Sustainable Built Environment 6 (1), 69-80, 2017 | 90 | 2017 |
Implications of even flow production methodology for US housing industry HH Bashford, A Sawhney, KD Walsh, K Kot Journal of construction engineering and management 129 (3), 330-337, 2003 | 89 | 2003 |
Environmental impacts over the life cycle of residential buildings using different exterior wall systems R Kahhat, J Crittenden, F Sharif, E Fonseca, K Li, A Sawhney, P Zhang Journal of Infrastructure Systems 15 (3), 211-221, 2009 | 88 | 2009 |
Relationship between skill development and productivity in construction sector: A literature review S Dixit, SN Mandal, A Sawhney, S Singh International Journal of Civil Engineering and Technology 8 (8), 649-665, 2017 | 86 | 2017 |
Agent-based modeling and simulation in construction Sawhney, Bashford, Mulky Proceedings of the 2003 Winter Simulation Conference, 2003. 2, 1541-1547 vol. 2, 2003 | 86 | 2003 |
Production system loading–cycle time relationship in residential construction HH Bashford, KD Walsh, A Sawhney Journal of Construction Engineering and Management 131 (1), 15-22, 2005 | 74 | 2005 |
HSM-Simulation–Based planning method for construction projects A Sawhney, SM AbouRizk Journal of construction engineering and management 121 (3), 297-303, 1995 | 72 | 1995 |
Construction project simulation using CYCLONE A Sawhney, SM AbouRizk, DW Halpin Canadian Journal of Civil Engineering 25 (1), 16-25, 1998 | 69 | 1998 |
Grand challenges for the Indian construction industry A Sawhney, R Agnihotri, V Kumar Paul Built Environment Project and Asset Management 4 (4), 317-334, 2014 | 67 | 2014 |
State of BIM adoption and outlook in India A Sawhney, A Kapoor, S Kamthan, N Agarwal, P Bhakre, S Jain RICS School of Built Environment 1 (1), 1-30, 2014 | 65 | 2014 |
Area of linkage between lean construction and sustainability in Indian construction industry S Dixit, SN Mandal, A Sawhney, S Singh International Journal of Civil Engineering and Technology 8 (8), 2017 | 63 | 2017 |