关注
Dr. Kherun Nita Ali
标题
引用次数
引用次数
年份
Green buildings cost premium: A review of empirical evidence
LN Dwaikat, KN Ali
Energy and Buildings 110, 396-403, 2016
3292016
Industry 4.0 for the construction industry—how ready is the industry?
R Maskuriy, A Selamat, KN Ali, P Maresova, O Krejcar
Applied Sciences 9 (14), 2819, 2019
2352019
Green buildings life cycle cost analysis and life cycle budget development: Practical applications
LN Dwaikat, KN Ali
Journal of Building Engineering 18, 303-311, 2018
1632018
Review of green building demand factors for Malaysia
GU Aliagha, M Hashim, AO Sanni, KN Ali
Journal of Energy Technologies and Policy 3 (11), 471-478, 2013
1372013
The economic benefits of a green building–Evidence from Malaysia
LN Dwaikat, KN Ali
Journal of Building engineering 18, 448-453, 2018
1272018
User satisfaction adaptive behaviors for assessing energy efficient building indoor cooling and lighting environment
A Keyvanfar, A Shafaghat, MZ Abd Majid, HB Lamit, MW Hussin, KNB Ali, ...
Renewable and Sustainable Energy Reviews 39, 277-295, 2014
1072014
Small and medium sized construction firms job satisfaction and performance evaluation in Nigeria
A Abdullah, AA Bilau, WI Enegbuma, WI Ali, SA Bustani
International Journal of Social Science and Humanity, 2012
892012
Evaluation of job satisfaction and performance of employees in small and medium sized construction firms in Nigeria
A Abdullah, AA Bilau, WI Enegbuma, AM Ajagbe, KN Ali
IACSIT Press, Singapore, 2011
862011
A review on BIM-based automated code compliance checking system
AS Ismail, KN Ali, NA Iahad
2017 international conference on research and innovation in information …, 2017
842017
Preliminary building information modelling adoption model in Malaysia: A strategic information technology perspective
W Imoudu Enegbuma, U Godwin Aliagha, K Nita Ali
Construction Innovation 14 (4), 408-432, 2014
792014
Critical cost factors of building construction projects in Malaysia
TC Toh, C Ting, KN Ali, GU Aliagha, O Munir
Procedia-Social and Behavioral Sciences 57, 360-367, 2012
582012
Improving the business process of reactive maintenance projects
K Nita Ali, M Sun, G Petley, P Barrett
Facilities 20 (7/8), 251-261, 2002
522002
Collaboration and risk in building information modelling (BIM): a systematic literature review
KN Ali, HH Alhajlah, MA Kassem
Buildings 12 (5), 571, 2022
462022
Construction industry from perspective of force majeure and environmental risk compared to the CoViD-19 outbreak: a systematic literature review
MO Alfadil, MA Kassem, KN Ali, W Alaghbari
Sustainability 14 (3), 1135, 2022
452022
Building information modelling (BIM) educational framework for quantity surveying students: The Malaysian perspective
KN Ali, NE Mustaffa, QJ Keat, WI Enegbuma
Journal of Information Technology in Construction (ITcon) 21 (9), 140-151, 2016
432016
Exploring gamification approach in hazard identification training for Malaysian construction industry
NI Mohd, KN Ali, S Bandi, F Ismail
International Journal of Built Environment and Sustainability 6 (1), 51-57, 2019
412019
Effects of perceptions on BIM adoption in Malaysian construction industry
WI Enegbuma, GU Aliagha, KN Ali
Jurnal Teknologi 77 (15), 2015
392015
Academic readiness for building information modelling (BIM) integration to Higher Education Institutions (HEIs) in Malaysia
BY Yusuf, MR Embi, KN Ali
2017 International Conference on Research and Innovation in Information …, 2017
362017
Confirmatory strategic information technology implementation for building information modelling adoption model
WI Enegbuma, GU Aliagha, KN Ali, YY Badiru
Journal of Construction in Developing Countries 21 (2), 113, 2016
362016
Building information modeling as a process of systemic changes for collaborative education in higher institution
BY Yusuf, KN Ali, MR Embi
Procedia-Social and Behavioral Sciences 219, 820-827, 2016
312016
系统目前无法执行此操作,请稍后再试。
文章 1–20