Flexible job-shop scheduling problem with resource recovery constraints J Vallikavungal Devassia, MA Salazar-Aguilar, V Boyer International Journal of Production Research 56 (9), 3326-3343, 2018 | 32 | 2018 |
The generalized flexible job shop scheduling problem V Boyer, J Vallikavungal, XC Rodríguez, MA Salazar-Aguilar Computers & Industrial Engineering 160, 107542, 2021 | 27 | 2021 |
A parallel machine batch scheduling problem in a brewing company CA Sáenz-Alanís, J VD, MA Salazar-Aguilar, V Boyer The International Journal of Advanced Manufacturing Technology 87, 65-75, 2016 | 25 | 2016 |
On soft lattice operations VD Jobish, KV Babitha, SJ John J Adv Res Pure Math 5 (2), 71-86, 2013 | 8 | 2013 |
Fast and efficient algorithms to handle the dynamism in a single machine scheduling problem with sequence-dependent setup times F Angel-Bello, J Vallikavungal, A Alvarez Computers & Industrial Engineering 152, 106984, 2021 | 6 | 2021 |
Two approaches to handle the dynamism in a scheduling problem with sequence-dependent setup times F Angel-Bello, J Vallikavungal, A Alvarez Expert Systems with Applications 167, 114137, 2021 | 5 | 2021 |
3-sequent achromatic sum of graphs C Dominic, JV Devassia Discrete Mathematics, Algorithms and Applications, 2150039, 2020 | | 2020 |
Simultaneous consideration of sequence-dependent and position-dependent setup times in single machine scheduling problems F Angel-Bello, J Vallikavungal, A Alvarez J. Math. Comput. Sci. 10 (5), 2033-2052, 2020 | | 2020 |