Prediction of shovel productivity in the Gol-e-Gohar iron mine M Osanloo, A Hekmat Journal of Mining science 41 (2), 177-184, 2005 | 51 | 2005 |
Springer International Publishing: Cham E Widzyk-Capehart, A Hekmat, R Singhal Switzerland, 2019 | 33 | 2019 |
New approach for selection of waste dump sites in open pit mines A Hekmat, M Osanloo, AM Shirazi Mining Technology 117 (1), 24-31, 2008 | 32 | 2008 |
Experimental quantification of hang-up for block caving applications R Castro, R Gómez, A Hekmat International Journal of Rock Mechanics and Mining Sciences 85, 1-9, 2016 | 31 | 2016 |
A comminution model for secondary fragmentation assessment for block caving R Gómez, RL Castro, A Casali, S Palma, A Hekmat Rock Mechanics and Rock Engineering 50, 3073-3084, 2017 | 22 | 2017 |
Prediction of rock fragmentation based on a modified Kuz-Ram model A Hekmat, S Munoz, R Gomez Proceedings of the 27th international symposium on mine planning and …, 2019 | 18 | 2019 |
Productivity of a continuous mining system for block caving mines LF Orellana, R Castro, A Hekmat, E Arancibia Rock Mechanics and Rock Engineering 50, 657-663, 2017 | 15 | 2017 |
Block size selection with the objective of minimizing the discrepancy in real and estimated block grade A Hekmat, M Osanloo, P Moarefvand Arabian Journal of Geosciences 6, 141-155, 2013 | 12 | 2013 |
Mud inflow risk assessment in block caving operation based on AHP comprehensive method A Hekmat, A Anani, F Tapia, I Navia Proceedings of the 18th Symposium on Environmental Issues and Waste …, 2019 | 11 | 2019 |
Reclamation of granite stone quarry—a case study in Jostan Granite Mine, Tehran, Iran M Osanloo, A Hekmat, A Aghajani Bazazi 1st international seminar on mine closure, Perth, Australia, 2006 | 10 | 2006 |
Influence of fine material, humidity and vertical loads on the flowability of caved rock D Olivares, R Castro, A Hekmat ARMA US Rock Mechanics/Geomechanics Symposium, ARMA-2015-582, 2015 | 7 | 2015 |
Optimizing cut-out distance for maximum coal productivity A Anani, W Nyaaba, A Hekmat, EA Cordova Simulation 95 (6), 545-559, 2019 | 6 | 2019 |
Automation fundamentals of continuous mining system R Castro, J Riquelme, E Widzyk-Capehart, A Hekmat, J Baraqui International Journal of Mining, Reclamation and Environment 29 (5), 419-432, 2015 | 6 | 2015 |
FlowSim–A versatile flow simulation tool to quantify extraction and design alternatives for block caving R Castro, A Hekmat, M Fuentes, F Armijo, F Rodriguez Proceedings of MassMin, 645-652, 2016 | 5 | 2016 |
Proceedings of the 27th International Symposium on Mine Planning and Equipment Selection-MPES 2018 E Widzyk-Capehart, A Hekmat, R Singhal Springer, 2019 | 2 | 2019 |
Combining geomechanical and hydrogeological modeling for drainage analysis in Block Caving mine development R Díaz, R Gómez, R Vidal, A Hekmat, D Oyarzo International Journal of Rock Mechanics and Mining Sciences 173, 105606, 2024 | 1 | 2024 |
Proceedings of the 18th Symposium on Environmental Issues and Waste Management in Energy and Mineral Production: SWEMP 2018—Selected Works E Widzyk-Capehart, A Hekmat, R Singhal Springer, 2018 | 1 | 2018 |
Optimization of coal production rate as a function of cut-out distance A Anani, W Nyaaba, A Hekmat Proceedings of the 27th International Symposium on Mine Planning and …, 2019 | | 2019 |
A dilution model for narrow vein mine design—a case study F Marco, JA Vallejos, R Castro, A Hekmat Design Methods 2015: Proceedings of the International Seminar on Design …, 2015 | | 2015 |
Automation fundamentals of continuous mining system R Castro Ruiz, J Riquelme Aguilar, E Widzyk-Capehart, A Hekmat, ... Taylor & Francis, 2015 | | 2015 |