Transportation decision making: Principles of project evaluation and programming KC Sinha, S Labi John Wiley & Sons, 2011 | 597 | 2011 |
An analysis of cost overruns and time delays of INDOT projects C Bordat, BG McCullouch, S Labi, KC Sinha Joint Transportation Research Program, 2004 | 201 | 2004 |
Life-cycle evaluation of flexible pavement preventive maintenance S Labi, KC Sinha Journal of transportation engineering 131 (10), 744-751, 2005 | 157 | 2005 |
Graph neural network and reinforcement learning for multi‐agent cooperative control of connected autonomous vehicles S Chen, J Dong, P Ha, Y Li, S Labi Computer‐Aided Civil and Infrastructure Engineering 36 (7), 838-857, 2021 | 155 | 2021 |
Three-stage least-squares analysis of time and cost overruns in construction contracts A Bhargava, PC Anastasopoulos, S Labi, KC Sinha, FL Mannering Journal of construction engineering and management 136 (11), 1207-1218, 2010 | 154 | 2010 |
Decision support for optimal scheduling of highway pavement preventive maintenance within resurfacing cycle G Lamptey, S Labi, Z Li Decision Support Systems 46 (1), 376-387, 2008 | 150 | 2008 |
A deep learning algorithm for simulating autonomous driving considering prior knowledge and temporal information S Chen, Y Leng, S Labi Computer‐Aided Civil and Infrastructure Engineering 35 (4), 305-321, 2020 | 128 | 2020 |
Life cycle cost analysis for INDOT pavement design procedures G Lamptey, MZ Ahmad, S Labi, KC Sinha Joint Transportation Research Program, 2005 | 127 | 2005 |
Measures of short-term effectiveness of highway pavement maintenance S Labi, KC Sinha Journal of Transportation Engineering 129 (6), 673-683, 2003 | 123 | 2003 |
Impact of road-surface condition on rural highway safety: A multivariate random parameters negative binomial approach S Chen, TU Saeed, S Labi Analytic methods in accident research 16, 75-89, 2017 | 122 | 2017 |
An empirical discourse on forecasting the use of autonomous vehicles using consumers’ preferences TU Saeed, MW Burris, S Labi, KC Sinha Technological Forecasting and Social Change 158, 120130, 2020 | 119 | 2020 |
Estimating cost discrepancies in highway contracts: Multistep econometric approach K Gkritza, S Labi Journal of Construction Engineering and Management 134 (12), 953-962, 2008 | 113 | 2008 |
Evaluating the cost effectiveness of flexible rehabilitation treatments using different performance criteria M Irfan, MB Khurshid, S Labi, W Flora Journal of Transportation Engineering 135 (10), 753-763, 2009 | 112 | 2009 |
Empirical assessment of the likelihood and duration of highway project time delays PC Anastasopoulos, S Labi, A Bhargava, FL Mannering Journal of Construction Engineering and Management 138 (3), 390-398, 2012 | 111 | 2012 |
Efficacies of roadway safety improvements across functional subclasses of rural two-lane highways S Labi Journal of safety research 42 (4), 231-239, 2011 | 107 | 2011 |
Planning-stage estimation of highway project duration on the basis of anticipated project cost, project type, and contract type M Irfan, MB Khurshid, P Anastasopoulos, S Labi, F Moavenzadeh International Journal of Project Management 29 (1), 78-92, 2011 | 103 | 2011 |
Effectiveness of microsurfacing treatments S Labi, G Lamptey, SH Kong Journal of transportation engineering 133 (5), 298-307, 2007 | 98 | 2007 |
Effectiveness of highway pavement seal coating treatments S Labi, KC Sinha Journal of transportation engineering 130 (1), 14-23, 2004 | 94 | 2004 |
Frequency of change orders in highway construction using alternate count-data modeling methods PC Anastasopoulos, S Labi, A Bhargava, C Bordat, FL Mannering Journal of construction engineering and management 136 (8), 886-893, 2010 | 86 | 2010 |
Analysis of long-term effectiveness of thin hot-mix asphaltic concrete overlay treatments S Labi, G Lamptey, S Konduri, KC Sinha Transportation Research Record 1940 (1), 2-12, 2005 | 86 | 2005 |