Integrated simulation system for construction operation and project scheduling DE Lee, CY Yi, TK Lim, D Arditi Journal of computing in civil engineering 24 (6), 557-569, 2010 | 68 | 2010 |
An advanced stochastic time‐cost tradeoff analysis based on a CPM‐guided genetic algorithm HG Lee, CY Yi, DE Lee, D Arditi Computer‐Aided Civil and Infrastructure Engineering 30 (10), 824-842, 2015 | 67 | 2015 |
Concurrent construction scheduling simulation algorithm TK Lim, CY Yi, DE Lee, D Arditi Computer‐Aided Civil and Infrastructure Engineering 29 (6), 449-463, 2014 | 44 | 2014 |
Stochastic carbon emission estimation method for construction operation CY Yi, HS Gwak, DE Lee Journal of Civil Engineering and Management 23 (1), 137-149, 2017 | 20 | 2017 |
Stochastic optimal haul-route searching method based on genetic algorithm and simulation HS Gwak, CY Yi, DE Lee Journal of Computing in Civil Engineering 30 (3), 04015029, 2016 | 11 | 2016 |
Image processing and QR code application method for construction safety management JS Kim, CY Yi, YJ Park Applied Sciences 11 (10), 4400, 2021 | 9 | 2021 |
Resource-based quality performance estimation method for construction operations YJ Park, CY Yi Applied Sciences 11 (9), 4122, 2021 | 8 | 2021 |
Stochastic multi-variate performance trade-off method for technical tender evaluation CY Yi, HS Gwak, BS Kim, DE Lee KSCE Journal of Civil Engineering 22, 4240-4253, 2018 | 7 | 2018 |
A stacked generalization model to enhance prediction of earthquake-induced soil liquefaction S Preethaa, Y Natarajan, AP Rathinakumar, DE Lee, Y Choi, YJ Park, ... Sensors 22 (19), 7292, 2022 | 5 | 2022 |
Construction equipment fleet optimization for energy saving in earthmoving operation CY Yi, HC Lee, JW Seo, DE Lee Journal of the Architectural Institute of Korea Structure & Construction 31 …, 2015 | 5 | 2015 |
Setting Process Monitoring of Cement Paste Using Electromechanical Impedance of Piezoelectric Patch JC Lee, CY Yi Materials 15 (22), 8114, 2022 | 3 | 2022 |
Methodology for Selecting Optimal Earthmoving Haul-Routes using Genetic Algorithm HS Gwak, CY Yi, DE Lee Proceedings of the Korean Institute of Building Construction Conference, 4-5, 2014 | 3 | 2014 |
Stochastic flame locating method hybridizing Kalman filter and deep neural network for rapid fire response at construction sites JH Kim, YJ Park, CY Yi, DE Lee Journal of Building Engineering 66, 105967, 2023 | 2 | 2023 |
Eco-Economic Performance Estimation Method for Pretensioned Spun High-Strength Concrete Pile Installation CY Yi, JY Park, CY Park, JC Lee, YJ Park Sustainability 14 (19), 11990, 2022 | 2 | 2022 |
Multi-objective Optimization System for Time-Cost-Environment-Quality Trade-off in Construction Project DE Lee, CY Yi, HS Gwak Journal of the Architectural Institute of Korea Structure & Construction 31 …, 2015 | 2 | 2015 |
Methodology for Estimating Stochastic CO2 Emission for Construction Operation CY Yi, HS Gwak, DE Lee Journal of the Architectural Institute of Korea Structure & Construction 30 …, 2014 | 2 | 2014 |
Parametric image-based concrete defect assessment method DE Lee, G Hong, M Maruthi, CY Yi, YJ Park Case Studies in Construction Materials 20, e02962, 2024 | | 2024 |
Time of Flight Distance Sensor–Based Construction Equipment Activity Detection Method YJ Park, CY Yi Applied Sciences 14 (7), 2859, 2024 | | 2024 |
A Comparison Study of Edge Line Estimation Algorithms for Dimensional Quality Assessment of Precast Concrete Slabs CY Yi, F Li, JPP Thedja, SH Sim, YK Choi, GH Kim, MK Kim Advances in Civil Engineering 2024 (1), 4166203, 2024 | | 2024 |
Contingency Estimation Method based on Stochastic Earned Value Management System HS Gwak, BY Choi, CY Yi, DE Lee Proceedings of the Korean Institute of Building Construction Conference, 72-73, 2018 | | 2018 |