关注
Namhyuk Ham
Namhyuk Ham
Hanyang Cyber University, Digital Architecture and Urban Engineering, Assistant Professor
在 hycu.ac.kr 的电子邮件经过验证
标题
引用次数
引用次数
年份
Economic analysis of design errors in BIM-based high-rise construction projects: Case study of Haeundae L project
N Ham, S Moon, JH Kim, JJ Kim
Journal of Construction Engineering and Management 144 (6), 05018006, 2018
642018
A study on application of bim (building information modeling) to pre-design in construction project
NH Ham, KM Min, JH Kim, YS Lee, JJ Kim
2008 Third International Conference on Convergence and Hybrid Information …, 2008
582008
Empirical study on structural safety diagnosis of large-scale civil infrastructure using laser scanning and BIM
N Ham, SH Lee
Sustainability 10 (11), 4024, 2018
432018
Fourth industrialization-oriented offsite construction: case study of an application to an irregular commercial building
S Moon, N Ham, S Kim, L Hou, JH Kim, JJ Kim
Engineering, Construction and Architectural Management 27 (9), 2271-2286, 2020
352020
Optimal BIM staffing in construction projects using a queueing model
N Ham, S Moon, JH Kim, JJ Kim
Automation in Construction 113, 103123, 2020
332020
BIM‐Based Digital Fabrication Process for a Free‐Form Building Project in South Korea
J Lee, N Kwon, N Ham, J Kim, Y Ahn
Advances in Civil Engineering 2019 (1), 4163625, 2019
282019
Impacts of macroeconomic fluctuations on insolvency: Case of Korean construction companies
J Sang, NH Ham, JH Kim, JJ Kim
Journal of Management in Engineering 30 (5), 05014009, 2014
232014
A study on the development and operation of a curriculum based on National Competency Standard (NCS): focus on the case of department of real estate and urban future at Hanyang …
NH Ham, JJ Kim, K Yuh
The Journal of the Korea Contents Association 16 (3), 694-711, 2016
202016
Appraisal of building information modeling (BIM) curriculum for early-career construction-industry professionals: case study at C educational institute in Korea
R Govender, G Saba, N Ham, L Hou, S Moon, JJ Kim
International Journal of Construction Management 22 (5), 891-899, 2022
172022
Phased reverse engineering framework for sustainable cultural heritage archives using laser scanning and BIM: The case of the Hwanggungwoo (Seoul, Korea)
N Ham, BI Bae, OK Yuh
Sustainability 12 (19), 8108, 2020
162020
Productivity analysis of documentation based on 3D model in plant facility construction project
M Yoo, N Ham
Applied Sciences 10 (3), 1126, 2020
142020
Project Benefits of Digital Fabrication in Irregular‐Shaped Buildings
N Ham, S Lee
Advances in Civil Engineering 2019 (1), 3721397, 2019
122019
BIM (Building Information Modeling) 을 활용한 건축 기획 지원 방안에 관한 연구
함남혁, 문혁, 이윤선, 김주형, 이순정, 김재준
대한건축학회 논문집-계획계 24 (7), 39-46, 2008
122008
An application strategy for PLM in construction industry
KM Min, NH Ham, JH Kim, YS Lee, JJ Kim
International Journal of Digital Content Technology and its Applications 2 …, 2008
122008
Cost–benefit analysis of scan-vs-BIM-based quality management
T Kim, Y Yoon, B Lee, N Ham, JJ Kim
Buildings 12 (12), 2052, 2022
112022
Enhanced subcontractors allocation for apartment construction project applying conceptual 4d digital twin framework
WG Kim, N Ham, JJ Kim
Sustainability 13 (21), 11784, 2021
112021
Comparison Analysis of BIM Level in the Domestic and Overseas BIM Projects-Focused on BIM Journals and Award Winning Projects
SH Koh, NH Ham, JS Lee, SW Yoon, JJ Kim
Journal of KIBIM 7 (2), 25-35, 2017
112017
A case study on BIM operating and performance measurement in construction phase
NH Ham, JJ Kim
Journal of KIBIM 5 (2), 1-11, 2015
102015
Process of Using BIM for Small-Scale Construction Projects-Focusing on the Steel-frame Work
JK Kim, MY Yoo, NH Ham, JJ Kim, CS Choi
Journal of KIBIM 8 (2), 41-50, 2018
82018
A Study of BIM-based Construction Management Work Process Development in Design Phase
S Lee, N Ham, J Kim, J Kim
Korean journal of construction engineering and management 14 (6), 90-101, 2013
82013
系统目前无法执行此操作,请稍后再试。
文章 1–20