The impact of Motivation on Labour Productivity in Nigeria Construction Industry AO Aiyetan, AO Olotuah Conference of Association of Researchers in Construction management, London …, 2006 | 83* | 2006 |
Sustainable Low-Cost Housing Provision in Nigeria: a bottom-up, participatory approach AO Olotuah, AO Aiyetan Proceedings of 22nd Annual ARCOM Conference 2, 633-639, 2006 | 55 | 2006 |
A Systems Thinking Approach to Eliminate Delays on Building Construction Projects in South Africa. AO Aiyetan, JJ Smallwood, W Shakantu Acta Structilia 18 (2), 19-40, 2011 | 49 | 2011 |
Building design for buildability: an investigation of the current practice in Nigeria I Mbamali, OA Aiyetan, JO Kehinde Building and environment 40 (9), 1267-1274, 2005 | 38 | 2005 |
Causes of rework on building construction projects in Nigeria AO Aiyetan Interim: Interdisciplinary Journal 12 (3), 1-15, 2013 | 33 | 2013 |
Materials Management and Waste Minimisation on Construction Sites in Lagos State, Nigeria. AO Aiyetan, JJ Smallwood The Proceedings of the 4th International Conference on Engineering and …, 2013 | 31 | 2013 |
Influences on construction project delivery time AO Aiyetan Unpublished PhD thesis, Nelson Mandela Metropolitan University, Port Elizabeth, 2010 | 28 | 2010 |
System dynamics approach to mitigating skilled labour shortages in the construction industry: A South African context OA Aiyetan, D Das Construction Economics and Building 18 (4), 45-63, 2018 | 27 | 2018 |
Influences on Construction Project Delivery Time Performance AO Aiyetan, JJ Smallwood, W Shakantu The Third Built Conference of Association of Schools of Construction of …, 2008 | 25 | 2008 |
A linear regression modelling of the relation-ship between initial estimated and final achieved construction time in South Africa AO Aiyetan, JJ Smallwood, W Shakantu Acta Structilia 19 (1), 39-56, 2012 | 23 | 2012 |
Evaluation of the factors and strategies for water infrastructure project delivery in South Africa AO Aiyetan, DK Das Infrastructures 6 (5), 65, 2021 | 21 | 2021 |
Using system dynamics modelling principles to resolve problems of rework in construction projects in Nigeria OA Aiyetan, D Das Journal of Construction Project Management and Innovation 5 (2), 1266-1295, 2015 | 19 | 2015 |
Assessment of fire safety practices in public buildings in western Nigeria S Makanjuola, AE Oke, A Aiyetan InRICS COBRA Res Conf, Univ Cape Town, 39-48, 2009 | 13 | 2009 |
Use of Drones for construction in developing countries: Barriers and strategic interventions AO Aiyetan, DK Das International Journal of Construction Management 23 (16), 2888-2897, 2023 | 12 | 2023 |
Factors and strategies for improving construction management on sites in mega-projects in South Africa: An explorative survey AO Aiyetan, DK Das Infrastructures 7 (2), 19, 2022 | 11 | 2022 |
Influence of client understanding on quality of design AA Aiyetan, JJ Smallwood, W Shakantu 5th International Conference Proceedings on Engineering, Project and …, 2014 | 9 | 2014 |
Resolving contractor commitment challenges in project delivery by using conceptual system dynamics models OA Aiyetan, D Dillip Journal of construction project management and innovation 6 (sup-1), 1563-1582, 2016 | 8 | 2016 |
Sustainable Low-Cost Housing Provision in Nigeria: a bottom-up, participatory approach” Boyd AO Olotuah, AO Aiyetan D (Ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September …, 2006 | 8 | 2006 |
Rework cost on building projects in the south western part of Nigeria OA Aiyetan Journal of Construction Project Management and Innovation 4 (1), 755-769, 2014 | 7 | 2014 |
Risk Associated with the use of Software’s for Quantity Surveyors Practice in South West Nigeria AO Aiyetan Proceedings of the 6th International Conference on Engineering, Project, and …, 2015 | 6* | 2015 |