Critical success factors for facility management employer’s information requirements (EIR) for BIM S Ashworth, M Tucker, CK Druhmann Facilities 37 (1/2), 103-118, 2019 | 77 | 2019 |
Integration of FM expertise and end user needs in the BIM process using the Employer`s Information Requirements (EIR) S Ashworth, M Tucker, C Druhmann, M Kassem CIB World Building Congress 2016, Tampere, Finland 5, 942-953, 2016 | 34 | 2016 |
The Role of FM in Preparing a BIM Strategy and Employer’s Information Requirements (EIR) to Align with Client Asset Management Strategy S Ashworth, M Tucker, C Druhmann 15th EuroFM Research Symposium, Milan, Italy, 218-228, 2016 | 33 | 2016 |
Employer’s Information Requirements (EIR): A BIM case study to meet client and facility manager needs S Ashworth, MP Tucker, C Druhmann Papers from the 16th EuroFM Research Symposium, 2017 | 21 | 2017 |
How Facility Management can use Building Information Modelling (BIM) to improve the decision making process G Carbonari, S Ashworth, S Stravoravdis Journal for Facility Management:Wissenschaft trifft Praxis 10 (10/2015), 53-67, 2015 | 20 | 2015 |
FM awareness of building information modelling (BIM) S Ashworth, M Tucker British Institute of Facilities Management, 2017 | 12 | 2017 |
BIM guidance to optimise the operational phase: defining information requirements based on ISO 19650 S Ashworth, M Dillinger, K Körkemeyer Facilities 41 (5/6), 337-356, 2023 | 10 | 2023 |
The evolution of facility management (FM) in the building information modelling (BIM) process: An opportunity to use critical success factors (CSF) for optimising built assets SJ Ashworth PQDT-Global, 2021 | 9 | 2021 |
Employers Information Requirements (EIR): template and guidance S Ashworth, CK Druhmann BIFM: Advancing our Profession, 2017 | 8 | 2017 |
Added Value of FM Know-how, In The Building Whole Life Process S Ashworth Zurich University of Applied Sciences, 2013 | 7 | 2013 |
Added Value of FM Know-how: In the Building Whole Life Process S Ashworth 12th EuroFM Research Symposium, Prague, Czech Republic, 250-260, 2013 | 7 | 2013 |
The benefits of building information modelling (BIM) to facility management (FM) over built assets whole lifecycle S Ashworth, C Druhmann, T Streeter European Facility Management Conference, 2019 | 6 | 2019 |
FM awareness of building information modelling (BIM): August 2017 S Ashworth, M Tucker Institute of Workplace and Facility Management (IWFM), 2017 | 6 | 2017 |
Integrating life cycle sustainability analysis with BIM M Meslec, S Ashworth, C Druhmann 17th EFMC Research Symposium. Sofia, Bulgaria, 96-108, 2018 | 4 | 2018 |
Integration of FM and asset management expertise in digital building models S Ashworth, C Druhmann Journal for Facility Management 10 (10/2015), 38-52, 2015 | 3 | 2015 |
Digitally transforming facility management in healthcare: a systematic review of key digital technologies and systems P Schmitter, S Ashworth IOP Conference Series: Earth and Environmental Science 1176 (1), 012012, 2023 | 2 | 2023 |
Swiss-COBie: development of a design for information exchange between planners, contractors and FM in Switzerland S Ashworth, M El-Arousy, CK Druhmann 16th EuroFM Research Symposium:“Consolidating the Global Scope of Facility …, 2017 | 2 | 2017 |
Rating systems in conjunction with BIM deliver outstanding possibilities for sustainable construction CK Druhmann, S Ashworth Journal of Civil Engineering and Architecture Reseach 3 (10), 1711-1717, 2016 | 2 | 2016 |
BIM and FM: Research and Practice Workshop S Ashworth, D Bryde https://www.researchgate.net/publication …, 2015 | 2 | 2015 |
BIM and FM in Switzerland: A survey of the perception of BIM by FM professionals in Switzerland S Ashworth, D Bryde https://www.researchgate.net/publication …, 2015 | 2 | 2015 |