Mohammad Ghasemi
Mohammad Ghasemi
其他姓名M Ghasemi, Ghasemi, M
School of Information Technology, Deakin University, Geelong, 3216, Vic, Australia
在 research.deakin.edu.au 的电子邮件经过验证 - 首页
标题
引用次数
引用次数
年份
A new approach for production project scheduling with time-cost-quality trade-off considering multi-mode resource-constraints under interval uncertainty
M Ghasemi, SM Mousavi, S Aramesh, R Shahabi-Shahmiri, ...
International Journal of Production Research 61 (9), 2963-2985, 2023
152023
An optimization model for construction project scheduling by considering CO2 emissions with multi-mode resource constraints under interval-valued fuzzy uncertainty
S Aramesh, SM Mousavi, M Ghasemi, R Shahabi-Shahmiri
International Journal of Environmental Science and Technology 20 (1), 87-102, 2023
122023
A new combination of multi-mode resource-constrained project scheduling and group decision-making process with interval-fuzzy information
M Ghasemi, SM Mousavi, S Aramesh
Journal of Industrial and Systems Engineering 13 (1), 216-239, 2020
92020
An integrated chance-constrained stochastic model for a preemptive multi-skilled multi-mode resource-constrained project scheduling problem: a case study of building a sports …
SA Mirnezami, R Tavakkoli-Moghaddam, R Shahabi-Shahmiri, ...
Engineering Applications of Artificial Intelligence 126, 106726, 2023
82023
A chance-constrained programming method with credibility measure for solving the multi-skill multi-mode resource-constrained project scheduling problem
M Ghasemi, RK Chakrabortty, R Shahabi-Shahmiri, SA Mirnezami
International Journal of Construction Management 24 (10), 1090-1106, 2024
32024
Multi-skill resource-constrained project scheduling problem considering overlapping: fuzzy multi-objective programming approach to a case study
F Zarei, M Arashpour, SA Mirnezami, R Shahabi-Shahamiri, M Ghasemi
International Journal of Construction Management 24 (8), 820-833, 2024
22024
A robust chance-constrained programming approach for a bi-objective pre-emptive multi-mode resource-constrained project scheduling problem with time crashing
R Shahabi-Shahmiri, TS Kyriakidis, M Ghasemi, SA Mirnezami, S Mirjalili
International Journal of Systems Science: Operations & Logistics 10 (1), 2253147, 2023
12023
An AUGMECON2VIKOR Algorithm for a Multi-objective Model in a Sustainable Manufacturing System Under Reliable Constraints
R Shahabi-Shahmiri, R Tavakkoli-Moghaddam, A Dolgui, M Ghasemi, ...
IFIP International Conference on Advances in Production Management Systems …, 2024
2024
Preemptive and non-preemptive multi-skill multi-mode resource-constrained project scheduling problems considering sustainability and energy consumption: A comprehensive …
R Shahabi-Shahmiri, R Tavakkoli-Moghaddam, A Dolgui, SA Mirnezami, ...
Journal of Environmental Management 367, 121986, 2024
2024
Optimizing Perishable and Non-Perishable Product Assignment to Packaging Lines in a Sustainable Manufacturing System: An AUGMECON2VIKOR Algorithm
R Shahabi-Shahmiri, R Tavakkoli-Moghaddam, Z Hanzalek, M Ghasemi, ...
IFAC-PapersOnLine 58 (19), 1282-1287, 2024
2024
Modeling the multi-mode project scheduling with budget considerations under fuzzy uncertainty conditions
M Ghasemi, SM Mousavi
16th iran international industrial engineering conference, 2020
2020