Low Cost House Demand Predictor NY Zainun, MZA Majid Universitas Teknologi Malaysia 61, 2003 | 62 | 2003 |
Forecasting low-cost housing demand in Johor Bahru, Malaysia using artificial neural networks (ANN) NYB Zainun, IA Rahman, M Eftekhari Journal of Mathematics Research 2 (1), 14, 2010 | 37 | 2010 |
Web-based risk assessment technique for time and cost overrun (WRATTCO)–A framework AH Memon, IA Rahman, NY Zainun, AT Abd Karim Procedia-Social and Behavioral Sciences 129, 178-185, 2014 | 35 | 2014 |
Mapping of construction waste illegal dumping using geographical information system (gis) NY Zainun, IA Rahman, RA Rothman IOP Conference Series: Materials Science and Engineering 160 (1), 012049, 2016 | 33 | 2016 |
Risk severity matrix for sustainable public-private partnership projects in developing countries SH Khahro, TH Ali, S Hassan, NY Zainun, Y Javed, SA Memon Sustainability 13 (6), 3292, 2021 | 27 | 2021 |
Claims in construction projects: A comprehensive literature review HH Shaikh, NY Zainun, SH Khahro IOP Conference Series: Earth and Environmental Science 498 (1), 012095, 2020 | 27 | 2020 |
Proposed framework for the flood disaster management cycle in Malaysia SAHBS Muzamil, NY Zainun, NN Ajman, N Sulaiman, SH Khahro, ... Sustainability 14 (7), 4088, 2022 | 22 | 2022 |
An overview of total Quality management (TQM) practice in construction sector AJ Likita, NY Zainun, IA Rahman, ASMA Awal, AR Alias, MQA Rahman, ... IOP Conference Series: Earth and Environmental Science 140 (1), 012115, 2018 | 20 | 2018 |
Improving time performance in construction projects: Perspective of contractor AH Memon, N Roslan, NY Zainun Journal of American Science 10 (8), 46-50, 2014 | 18 | 2014 |
Measures for controlling time and cost overrun factors during execution stage N Roslan, NY Zainun, AH Memon International Journal of Construction Technology and Management 1 (1), 8-11, 2014 | 17 | 2014 |
Time management practices in large construction projects AH Memon, IA Rahman, I Ismail, NY Zainun IEEE Colloquium on Humanities, Science and Engineering, 61-66, 2014 | 17 | 2014 |
Comparison between ARIMA and DES methods of forecasting population for housing demand in Johor AR Alias, NY Zainun, IA Rahman MATEC Web of Conferences 81, 07002, 2016 | 15 | 2016 |
Computerized model to forecast low-cost housing demand in urban area in Malaysia using artificial neural networks (ANN) NYB Zainun © NY Zainun, 2011 | 13 | 2011 |
General risks for tunnelling projects: An overview LY Siang, FEM Ghazali, NY Zainun, R Ali AIP Conference Proceedings 1892 (1), 2017 | 12 | 2017 |
Low cost housing demand factors in Malaysia NY Zainun, SS Ismail Applied Mechanics and Materials 773, 1037-1041, 2015 | 12 | 2015 |
Assessing low-cost housing demand in Melaka: PLS-SEM approach NY Zainun, N Roslan, AH Memon Advanced Materials Research 838, 3156-3162, 2014 | 12 | 2014 |
Relevancy of factors and mitigation measures in controlling time and cost overrun towards Malaysian environment N Roslan, NY Zainun, AH Memon Applied Mechanics and Materials 773, 1007-1011, 2015 | 10 | 2015 |
Forecasting low-cost housing demand in Pahang, Malaysia using Artificial Neural Networks NY Zainun, IA Rahman, M Eftekhari Journal of Surveying, Construction and Property 2 (2), 2011 | 10 | 2011 |
The sustainable world CA Brebbia WIT press, 2011 | 9 | 2011 |
Delay in decision-making affecting construction projects: a sustainable decision-making model for mega projects SH Khahro, HH Shaikh, NY Zainun, B Sultan, QH Khahro Sustainability 15 (7), 5872, 2023 | 8 | 2023 |