Just-in-time scheduling in identical parallel machine sequence-dependent group scheduling problem A Goli, T Keshavarz Journal of Industrial and Management Optimization 18 (6), 3807-3830, 2022 | 58 | 2022 |
A branch-and-bound algorithm for the single machine sequence-dependent group scheduling problem with earliness and tardiness penalties T Keshavarz, M Savelsbergh, N Salmasi Applied Mathematical Modelling 39 (20), 6410-6424, 2015 | 39 | 2015 |
Flowshop sequence-dependent group scheduling with minimisation of weighted earliness and tardiness T Keshavarz, N Salmasi, M Varmazyar European Journal of Industrial Engineering 13 (1), 54-80, 2019 | 35 | 2019 |
Minimizing total completion time in the flexible flowshop sequence-dependent group scheduling problem T Keshavarz, N Salmasi, M Varmazyar Annals of Operations Research 226, 351-377, 2015 | 35 | 2015 |
Makespan minimisation in flexible flowshop sequence-dependent group scheduling problem T Keshavarz, N Salmasi International Journal of Production Research 51 (20), 6182-6193, 2013 | 35 | 2013 |
Efficient upper and lower bounding methods for flowshop sequence-dependent group scheduling problems T Keshavarz, N Salmasi European Journal of Industrial Engineering 8 (3), 366-387, 2014 | 20 | 2014 |
A hybrid neural network approach to minimize total completion time on a single batch processing machine N Rafiee Parsa, T Keshavarz, B Karimi, SM Moattar Husseini International Transactions in Operational Research, 2019 | 12 | 2019 |
Unrelated Parallel Machines Scheduling with Sequence-Dependent Setup Times to Minimize Makespan and Tariff Charged Energy Consumption T Keshavarz, E Karimi, M Shakhsi-Niaei Advances in Industrial Engineering 55 (1), 91-113, 2021 | 4 | 2021 |
A lower bounding method for earliness and tardiness minimization on a single batch processing machine T Keshavarz Journal of Industrial and Systems Engineering 13 (2), 9-26, 2020 | 3 | 2020 |
INTEGRATING PRODUCTION SCHEDULING, DELIVERY, AND 3D LOADING PROBLEMS IN A TWO-STAGE SUPPLY CHAIN. T Keshavarz, Z Noormohamadzade, MB Fakhrzad International Journal of Industrial Engineering 27 (6), 2020 | 1 | 2020 |
Scheduling a batch processing machine in a just-in-time production system by considering a tight due date T Keshavarz, H Zarabadipour Research in Production and Operations Management, 2024 | | 2024 |
DEVELOPING AN INTEGRATED MODEL FOR PRICING AND INVENTORY CONTROL OF PERISHABLE GOODS IN A TWO-STAGE SUPPLY CHAIN: A CASE STUDY OF GREEN MORTAR T Keshavarz, M Farasat Sharif Journal of Industrial Engineering & Management 39 (1), 35-48, 2023 | | 2023 |
Developing an Integrated Model for Pricing and Inventory Control of Perishable Goods in a Two-Stage Supply Chain: A Case Study of Green Mortar T Keshavarz, M Farasat Sharif Journal of Industrial Engineering & Management, 2023 | | 2023 |
Analyzing the impact of COVID-19 on the supply chain of E-commerce Companies O Solatinejad, T Keshavarz Journal of International Business Administration 5 (3), 181-199, 2022 | | 2022 |
Efficient Algorithms for Just-In-Time Scheduling on a Batch Processing Machine T Keshavarz, N Rafiee Parsa Journal of Operational Research In Its Applications (Applied Mathematics …, 2021 | | 2021 |
A Memetic Algorithm for Flexible Flow Shop Sequence Dependent Group Scheduling Problem TY Keshavarz, N Salmasi, R Logendran IIE Annual Conference. Proceedings, 1, 2010 | | 2010 |
Modeling the rational behavior of buyers and sellers in an E-commerce system using agent-based simulation M Ghanbari, T Keshavarz, M Shakhsi-Niaei Journal of International Business Administration 6 (4), 81-101, 2000 | | 2000 |
Pricing Model in Competitive Dual-Channel Supply Chain with Considering Outsourcing Strategy under Uncertainty TY Keshavarz, HR Kechidi, M Honarvar | | |