关注
José Fernando Gonçalves
José Fernando Gonçalves
Universidade do Porto, Faculdade de Economia, INESC TEC, LIAAD
在 fep.up.pt 的电子邮件经过验证 - 首页
标题
引用次数
引用次数
年份
A hybrid genetic algorithm for the job shop scheduling problem
JF Gonçalves, JJ de Magalhães Mendes, MGC Resende
European Journal of Operational Research 167 (1), 77-95, 2005
8672005
Biased random-key genetic algorithms for combinatorial optimization
JF Gonçalves, MGC Resende
Journal of Heuristics 17 (5), 487-525, 2011
6962011
A genetic algorithm for the resource constrained multi-project scheduling problem
JF Gonçalves, JJM Mendes, MGC Resende
European journal of operational research 189 (3), 1171-1190, 2008
5142008
An evolutionary algorithm for manufacturing cell formation
JF Gonçalves, MGC Resende
Computers & Industrial Engineering 47 (2-3), 247-273, 2004
3702004
A random key based genetic algorithm for the resource constrained project scheduling problem
JJM Mendes, JF Gonçalves, MGC Resende
Computers & operations research 36 (1), 92-109, 2009
3612009
A hybrid genetic algorithm for assembly line balancing
JF Gonçalves, JR De Almeida
Journal of Heuristics 8 (6), 629-642, 2002
2522002
A biased random key genetic algorithm for 2D and 3D bin packing problems
JF Gonçalves, MGC Resende
International Journal of Production Economics 145 (2), 500–510, 2013
2132013
A biased random-key genetic algorithm for the unequal area facility layout problem
JF Gonçalves, MGC Resende
European Journal of Operational Research 246 (1), 86–107, 2015
1992015
A parallel multi-population biased random-key genetic algorithm for a container loading problem
JF Gonçalves, MGC Resende
Computers & Operations Research 39 (2), 179–190, 2012
1992012
A hybrid genetic algorithm-heuristic for a two-dimensional orthogonal packing problem
JF Gonçalves
European Journal of Operational Research 183 (3), 1212-1229, 2007
1422007
A biased random-key genetic algorithm with forward-backward improvement for the resource constrained project scheduling problem
JF Gonçalves, MGC Resende, JJM Mendes
Journal of Heuristics 17 (5), 467-486, 2011
1332011
A parallel multi-population genetic algorithm for a constrained two-dimensional orthogonal packing problem
JF Gonçalves, MGC Resende
Journal of Combinatorial Optimization 22 (2), 180-201, 2011
113*2011
An extended Akers graphical method with a biased random-key genetic algorithm for job-shop scheduling
JF Gonçalves, MGC Resende
International Transactions in Operational Research 21 (2), 215-246, 2014
110*2014
Gestão de Aprovisionamentos
JF Gonçalves
Publindustria, 2002
952002
A hybrid particle swarm optimization and simulated annealing algorithm for the job shop scheduling problem with transport resources
DBMM Fontes, SM Homayouni, JF Gonçalves
European Journal of Operational Research, 2022
822022
A genetic algorithm approach for the single machine scheduling problem with linear earliness and quadratic tardiness penalties
JMS Valente, JF Gonçalves
Computers & Operations Research 36 (10), 2707-2715, 2009
742009
A container loading algorithm with static mechanical equilibrium stability constraints
MP Ramos, A. G., Oliveira, J. F., Gonçalves, J. F., & Lopes
Transportation Research Part B: Methodological 91, 565-581, 2016
682016
An experimental comparison of biased and unbiased random-key genetic algorithms
JF Gonçalves, MGC Resende, RF Toso
Pesquisa Operacional 34 (2), 143-164, 2014
64*2014
The multi-parent biased random-key genetic algorithm with implicit path-relinking and its real-world applications
CE Andrade, RF Toso, JF Gonçalves, MGC Resende
European Journal of Operational Research 289 (1), 17-30, 2021
622021
A multistart biased random key genetic algorithm for the flexible job shop scheduling problem with transportation
SM Homayouni, DBMM Fontes, JF Gonçalves
International Transactions in Operational Research 30 (2), 688-716, 2022
522022
系统目前无法执行此操作,请稍后再试。
文章 1–20