The value of integrating Scan-to-BIM and Scan-vs-BIM techniques for construction monitoring using laser scanning and BIM: The case of cylindrical MEP components F Bosché, M Ahmed, Y Turkan, CT Haas, R Haas Automation in Construction 49, 201-213, 2015 | 511 | 2015 |
Measuring the impact of rework on construction cost performance BG Hwang, SR Thomas, CT Haas, CH Caldas Journal of construction engineering and management 135 (3), 187-198, 2009 | 485 | 2009 |
Automated progress tracking using 4D schedule and 3D sensing technologies Y Turkan, F Bosche, CT Haas, R Haas Automation in construction 22, 414-421, 2012 | 453 | 2012 |
State of research in automatic as-built modelling V Pătrăucean, I Armeni, M Nahangi, J Yeung, I Brilakis, C Haas Advanced Engineering Informatics 29 (2), 162-171, 2015 | 384 | 2015 |
US construction labor productivity trends, 1970–1998 E Allmon, CT Haas, JD Borcherding, PM Goodrum Journal of construction engineering and management 126 (2), 97-104, 2000 | 378 | 2000 |
Automating the task of tracking the delivery and receipt of fabricated pipe spools in industrial projects J Song, CT Haas, C Caldas, E Ergen, B Akinci Automation in construction 15 (2), 166-177, 2006 | 360 | 2006 |
Automated retrieval of 3D CAD model objects in construction range images F Bosche, CT Haas Automation in Construction 17 (4), 499-512, 2008 | 331 | 2008 |
Tracking the location of materials on construction job sites J Song, CT Haas, CH Caldas Journal of construction engineering and management 132 (9), 911-918, 2006 | 306 | 2006 |
Tool to design for construction worker safety JA Gambatese, JW Hinze, CT Haas Journal of Architectural Engineering 3 (1), 32-41, 1997 | 296 | 1997 |
Assignment and allocation optimization of partially multiskilled workforce JE Gomar, CT Haas, DP Morton Journal of construction Engineering and Management 128 (2), 103-109, 2002 | 244 | 2002 |
Tracking the built status of MEP works: Assessing the value of a Scan-vs-BIM system F Bosché, A Guillemet, Y Turkan, CT Haas, R Haas Journal of computing in civil engineering 28 (4), 05014004, 2014 | 239 | 2014 |
Real-time three-dimensional occupancy grid modeling for the detection and tracking of construction resources J Teizer, CH Caldas, CT Haas Journal of Construction Engineering and Management 133 (11), 880-888, 2007 | 233 | 2007 |
Supplier selection process in an integrated construction materials management model M Safa, A Shahi, CT Haas, KW Hipel Automation in construction 48, 64-73, 2014 | 198 | 2014 |
US construction labor productivity trends, 1970–1998 P Teicholz, PM Goodrum, CT Haas Journal of Construction Engineering and Management 127 (5), 427-429, 2001 | 192 | 2001 |
Assessing the impact of materials tracking technologies on construction craft productivity D Grau, CH Caldas, CT Haas, PM Goodrum, J Gong Automation in construction 18 (7), 903-911, 2009 | 185 | 2009 |
Automated recognition of 3D CAD objects in site laser scans for project 3D status visualization and performance control F Bosche, CT Haas, B Akinci Journal of Computing in Civil Engineering 23 (6), 311-318, 2009 | 171 | 2009 |
A proximity-based method for locating RFID tagged objects J Song, CT Haas, CH Caldas Advanced Engineering Informatics 21 (4), 367-376, 2007 | 169 | 2007 |
Understanding and interpreting baseline perceptions of sustainability in construction among civil engineers in the United States WK Chong, S Kumar, CT Haas, SM Beheiry, L Coplen, M Oey Journal of management in engineering 25 (3), 143-154, 2009 | 163 | 2009 |
Examining the business impact of owner commitment to sustainability SM Beheiry, WK Chong, CT Haas Journal of construction engineering and management 132 (4), 384-392, 2006 | 161 | 2006 |
Application of system dynamics for developing financially self-sustaining management policies for water and wastewater systems R Rehan, MA Knight, CT Haas, AJA Unger Water research 45 (16), 4737-4750, 2011 | 160 | 2011 |