A two-agent single-machine scheduling problem with truncated sum-of-processing-times-based learning considerations TCE Cheng, SR Cheng, WH Wu, PH Hsu, CC Wu Computers & Industrial Engineering 60 (4), 534-541, 2011 | 123 | 2011 |
A single-machine learning effect scheduling problem with release times WC Lee, CC Wu, PH Hsu Omega 38 (1-2), 3-11, 2010 | 86 | 2010 |
Solving a two-agent single-machine scheduling problem considering learning effect DC Li, PH Hsu Computers & Operations Research 39 (7), 1644-1651, 2012 | 66 | 2012 |
Simulated-annealing heuristics for the single-machine scheduling problem with learning and unequal job release times CC Wu, PH Hsu, K Lai Journal of Manufacturing Systems 30 (1), 54-62, 2011 | 53 | 2011 |
Genetic algorithm for minimizing the total weighted completion time scheduling problem with learning and release times CC Wu, PH Hsu, JC Chen, NS Wang Computers & Operations Research 38 (7), 1025-1034, 2011 | 46 | 2011 |
A single-machine scheduling with a truncated linear deterioration and ready times CC Wu, WH Wu, WH Wu, PH Hsu, Y Yin, J Xu Information Sciences 256, 109-125, 2014 | 38 | 2014 |
A two-agent single-machine scheduling problem with late work criteria DJ Wang, CC Kang, YR Shiau, CC Wu, PH Hsu Soft Computing 21, 2015-2033, 2017 | 32 | 2017 |
A two-machine flowshop scheduling problem with a truncated sum of processing-times-based learning function CC Wu, WH Wu, PH Hsu, K Lai Applied Mathematical Modelling 36 (10), 5001-5014, 2012 | 28 | 2012 |
A Truncated Sum of Processing‐Times–Based Learning Model for a Two‐Machine Flowshop Scheduling Problem K Lai, PH Hsu, PH Ting, CC Wu Human Factors and Ergonomics in Manufacturing & Service Industries 24 (2 …, 2014 | 23 | 2014 |
Two-machine flowshop scheduling with truncated learning to minimize the total completion time DC Li, PH Hsu, CC Wu, TCE Cheng Computers & Industrial Engineering 61 (3), 655-662, 2011 | 22 | 2011 |
Metaheuristics for two-stage flow-shop assembly problem with a truncation learning function CC Wu, X Zhang, A Azzouz, WL Shen, SR Cheng, PH Hsu, WC Lin Engineering optimization 53 (5), 843-866, 2021 | 19 | 2021 |
A Time-Dependent Scheduling Problem to Minimize the Sum of the Total Weighted Tardiness Among Two Agents. WH Wu, Y Yin, WH Wu, CC Wu, PH Hsu Journal of Industrial & Management Optimization 10 (2), 2014 | 17 | 2014 |
A two-stage three-machine assembly scheduling problem with a truncation position-based learning effect A Azzouz, PA Pan, PH Hsu, WC Lin, S Liu, L Ben Said, CC Wu Soft Computing 24, 10515-10533, 2020 | 14 | 2020 |
Genetic algorithm for a two-agent scheduling problem with truncated learning consideration WH Wu, Y Yin, SR Cheng, PH Hsu, CC Wu Asia-Pacific Journal of Operational Research 31 (06), 1450046, 2014 | 11 | 2014 |
A two-agent single-machine scheduling problem to minimize the total cost with release dates DJ Wang, Y Yin, WH Wu, WH Wu, CC Wu, PH Hsu Soft Computing 21, 805-816, 2017 | 10 | 2017 |
A Genetic Algorithm‐Based Approach for Single‐Machine Scheduling with Learning Effect and Release Time DC Li, PH Hsu, CC Chang Mathematical Problems in Engineering 2014 (1), 249493, 2014 | 10 | 2014 |
Competitive Two‐Agent Scheduling with Learning Effect and Release Times on a Single Machine DC Li, PH Hsu Mathematical Problems in Engineering 2013 (1), 754826, 2013 | 8 | 2013 |
Branch-and-bound and simulated annealing algorithms for a total weighted completion time scheduling with ready times and learning effect CC Wu, PH Hsu, JC Chen, NS Wang, WH Wu The International Journal of Advanced Manufacturing Technology 55, 341-353, 2011 | 8 | 2011 |
SIMULATED ANNEALING ALGORITHMS FOR THE TWO-MACHINE MAKESPAN FLOWSHOP SCHEDULING WITH TRUNCATED LEARNING CONSIDERATION. CC Wu, JC Chen, WH Wu, PH Hsu, WH Wu International Journal of Industrial Engineering 18 (8), 2011 | 5 | 2011 |
A bi-criterion sequence-dependent scheduling problem with order deliveries JY Xu, WC Lin, KX Hu, YW Chang, WH Wu, PH Hsu, TH Wu, CC Wu PeerJ Computer Science 10, e1763, 2024 | | 2024 |