Predicting change by evaluating the change implementation process in construction projects using event tree analysis
G Heravi, MH Charkhakan
Journal of Management in Engineering 31 (5), 04014081, 2015
302015
Risk manageability assessment to improve risk response plan: Case study of construction projects in Iran
MH Charkhakan, G Heravi
Journal of Construction Engineering and Management 144 (11), 05018012, 2018
262018
Predicting and tracing change-formation scenarios in construction projects using the DEMATEL technique
G Heravi, MH Charkhakan
Journal of Management in Engineering 30 (6), 04014028, 2014
262014
Evaluating the preventability of conflicts arising from change occurrence in construction projects
MH Charkhakan, G Heravi
Engineering, Construction and Architectural Management 26 (8), 1777-1800, 2019
162019
Identification of changes formation scenarios in construction projects based on changes occurrence paths analysis
MH Charkhakan, G Heravi
Construction Research Congress 2012: Construction Challenges in a Flat World …, 2012
142012
Quantifying the predictability and preventability of conflicts between construction project parties
MH Charkhakan, G Heravi
Engineering, Construction and Architectural Management 30 (5), 1932-1950, 2022
22022
A New Approach to Risk Analysis: Probability–Impact–Manageability Assessment based on Chain of Risks
MH Charkhakan, G Heravi
Iranian Journal of Science and Technology, Transactions of Civil Engineering …, 2023