Factors affecting housing maintenance cost in Malaysia AS Ali, SN Kamaruzzaman, R Sulaiman, Y Cheong Peng Journal of facilities management 8 (4), 285-298, 2010 | 252 | 2010 |
Cost performance for building construction projects in Klang Valley AS Ali, SN Kamaruzzaman Journal of Building performance 1 (1), 2010 | 240 | 2010 |
The performance measurement of construction projects managed by ISO-certified contractors in Malaysia AS Ali, I Rahmat Journal of Retail & Leisure Property 9, 25-35, 2010 | 200 | 2010 |
Cost decision making in building maintenance practice in Malaysia A Shah Ali Journal of Facilities Management 7 (4), 298-306, 2009 | 158 | 2009 |
The effect of indoor environmental quality on occupants’ perception of performance: A case study of refurbished historic buildings in Malaysia SN Kamaruzzaman, CO Egbu, EMA Zawawi, AS Ali, AI Che-Ani Energy and Buildings 43 (2-3), 407-413, 2011 | 123 | 2011 |
Building defects: Possible solution for poor construction workmanship AS Ali, KH Wen Journal of Building Performance 2 (1), 2011 | 108 | 2011 |
CONTRACTORS’PERCEPTION OF FACTORS CONTRIBUTING TO PROJECT DELAY: CASE STUDIES OF COMMERCIAL PROJECTS IN KLANG VALLEY, MALAYSIA AS Ali, A Smith, M Pitt, CH Choon Journal of Design and Built Environment 7 (1), 2010 | 97 | 2010 |
Involvement of key design participants in refurbishment design process A Shah Ali, I Rahmat, H Hassan Facilities 26 (9/10), 389-400, 2008 | 94 | 2008 |
A Study on causes of accident and prevention in Malaysian construction industry AS Ali, SN Kamaruzzaman, GC Sing Editorial Board/Sidang Editor 3, 95-104, 2010 | 87 | 2010 |
Surgical emphysema and pneumomediastinum complicating dental extraction A Ali, DR Cunliffe, SR Watt-Smith British dental journal 188 (11), 589-590, 2000 | 85 | 2000 |
The effect of physical environment comfort on employees’ performance in office buildings: A case study of three public universities in Malaysia AS Ali, SJL Chua, MEL Lim Structural Survey 33 (4/5), 294-308, 2015 | 80 | 2015 |
The effect of design on maintenance for school buildings in Penang, Malaysia AS Ali, KC Keong, N Zakaria, U Zolkafli, F Akashah Structural Survey 31 (3), 194-201, 2013 | 76 | 2013 |
Implementation of risk management in the Malaysian construction industry LC Siang, AS Ali Journal of Surveying, Construction and Property 3 (1), 2012 | 75 | 2012 |
The characteristics of refurbishment projects in Malaysia A Shah Ali, S Nizam Kamaruzzaman, H Salleh Facilities 27 (1/2), 56-65, 2009 | 71 | 2009 |
The effect of leadership behaviors on staff performance in Somalia ASA Ali, HO Elmi, AI Mohamed Educational Research International 2 (2), 197-210, 2013 | 58 | 2013 |
Understanding the service provider perspective towards better service quality in local authorities W Zahari Wan Yusoff, M Ismail, A Shah Ali Journal of Facilities Management 8 (3), 226-238, 2010 | 57 | 2010 |
The involvement of the key participants in the production of project plans and the planning performance of refurbishment projects I Rahmat, AS Ali Journal of Building Appraisal 5, 273-288, 2010 | 56 | 2010 |
Maintenance of high-rise residential buildings SJL Chua, NB Zubbir, AS Ali, CP Au-Yong International journal of building pathology and adaptation 36 (2), 137-151, 2018 | 49 | 2018 |
Building condition assessment: lesson learnt from pilot projects S Yacob, AS Ali, AYC Peng MATEC Web of Conferences 66, 00072, 2016 | 46 | 2016 |
Analytic hierarchy process decision-making framework for procurement strategy selection in building maintenance work SC Jin Lin, AS Ali, AB Alias Journal of Performance of Constructed Facilities 29 (2), 04014050, 2015 | 46 | 2015 |