关注
Azizur Rahman
Azizur Rahman
Department of Civil and Construction Engineering, Swinburne University of
在 swin.edu.au 的电子邮件经过验证
标题
引用次数
引用次数
年份
Ergonomic mismatch between students anthropometry and university classroom furniture
P MS, R A, T N
Theoretical Issues in Ergonomics Science, 1-30, 2019
45*2019
Productivity improvement through line balancing in apparel industries
MRH Shumon, K Arif-Uz-Zaman, A Rahman, B Khulna
Proceedings of the International Conference on Industrial Engineering and …, 2010
282010
Musculoskeletal health and safety of aged workers in manual handling works
A Rahman, E Palaneeswaran, A Kulkarni, P Zou
2015 International Conference on Industrial Engineering and Operations …, 2015
182015
Foot Plantar Pressure Measurement Using Low Cost Force Sensitive Resistor (FSR): Feasibility Study
A Jor, S Das, AS Bappy, A Rahman
Journal of Scientific Research 11 (3), 311-319, 2019
142019
Strategic fit strategy formulation: keys to enhancing competitiveness and improving capabilities of a manufacturing unit
MH Rahman, A Rahman
Production & Manufacturing Research 8 (1), 59-79, 2020
132020
Strategic fit: model development and fitness analysis of a manufacturing unit
MH Rahman, A Rahman
Production & Manufacturing Research 7 (1), 44-66, 2019
122019
IMPLEMENTATION OF 5S IN JUTE MILL: A CASE STUDY
M Al Amin, S Roy, A Rahman, MI Shikdar
Journal of Engineering 10 (1), 77-84, 2019
122019
Prospects of remanufacturing, Bangladesh perspective
RH Shumon, A Rahman
International Journal of Industrial Engineering: Theory, Applications and …, 2011
112011
Productivity improvement through balancing process using multi-skilled manpower in apparel industries
RH Shumon, K Arif-Uz-Zaman, A Rahman
International Journal of Industrial and Systems Engineering 1 11 (1-2), 31-47, 2012
62012
Implementation of total quality management inBangladesh power generating sector: progress and problems
A Rahman, MK Uddin, K Arif-Uz-Zaman, MRH Shumon
International Journal of Industrial and Systems Engineering 1 11 (1-2), 122-136, 2012
42012
Virtual reality based ergonomic risk evaluation of welding tasks
A Rahmana, E Palaneeswaranb, A Kulkarnic
Proceedings 19th Triennial Congress of the IEA 9, 14, 2015
32015
An industrial application of DMECA approach to management process analysis
A Rahman, MK Uddin
International Journal of Industrial and Systems Engineering 11 (1-2), 48-65, 2012
22012
Collaborative Supply Chain Practices and Prospect of Companies in Bangladesh
MA Quddus, AMMN Ahsan, A Rahman
2*2012
Ensuring Safety: A Great Challenge for Electricity Distribution System
A Rahman, MK Uddin, MS Islam, A Engineer
22010
Prototype Development of a Joint Padded Metatarsal Cup for High Heel to Enhance Female Foot Musculoskeletal Safety
A Jor, A Rahman
The Kurume Medical Journal, 2019
2019
Modelling Back Problems from Lifting and Lowering Tasks in Australian Construction Industry
A Rahman, E Palaneeswaran
2018
Scheduler-Flexible Scheduling Method, Interface with Planning and Production
M Kazi Arif-Uz-Zaman, RH Shumon, A Rahman, B Khulna
2010
A COMPARATIVE STUDY OF MECHANISTIC PARACHOR MODEL OVER PARACHOR MODEL IN A MULTI-COMPONENT HYDROCARBON SYSTEM
M Marufuzzaman, A Henni, A Rahman
EQUILIBRIUM, 3118.22139, 2008
2008
EXHAUST ODOR REDUCTION BY CHARCOAL-ADSORPTION SYSTEM IN DIRECT INJECTION DIESEL ENGINES
MM Roy, A Rahman, SMM Rahman
2005
系统目前无法执行此操作,请稍后再试。
文章 1–19