Minimizing rental cost under specified rental policy in two stage flow shop, the processing time associated with probabilities including break-down interval and job block criteria S Sharma, D Gupta European Journal of Business and Management 3 (2), 85-103, 2011 | 54 | 2011 |
Threshold effect on a fuzzy queue model with batch arrival M Mittal, TP Singh, D Gupta Arya Bhatta Journal of Mathematics and Informatics 7 (1), 109-118, 2015 | 18 | 2015 |
Flow shop scheduling on 2-machines with setup time and single transport facility under fuzzy environment D Gupta, S Sharma, S Aggarwal Opsearch 50 (1), 14-24, 2013 | 18 | 2013 |
Optimal scheduling for total waiting time of jobs in specially structured two stage flow shop problem processing times associated with probabilities D Gupta, B Goyal Arya Bhatta Journal of Mathematics and Informatics 8 (1), 45-52, 2016 | 15 | 2016 |
3-stage specially structured flow shop scheduling to minimize the rental cost including transportation time, job weightage and job block criteria D Gupta, S Bala, P Singla, S Sharma European Journal of Business and Management 7 (4), 1-7, 2015 | 14 | 2015 |
Optimal Two Stage open Shop specially structured scheduling To Minimize the Rental Cost, processing time associated with probabilities including transportation time D Gupta, S Bala, P Singla IOSR Journal of Mathematics 3 (3), 01-06, 2012 | 14 | 2012 |
Heuristic approach for n-jobs, 3-machines flow shop scheduling problem, processing time associated with probabilities involving transportation time, break-down interval … D Gupta, S Sharma, S Sharma Mathematical Theory and Modeling 1 (1), 30-36, 2011 | 13 | 2011 |
Fuzzy bi-criteria scheduling on parallel machines involving weighted flow time and maximum tardiness KK Nailwal, D Gupta, S Sharma Cogent Mathematics 2 (1), 1019792, 2015 | 12 | 2015 |
On network queue model centrally linked with a common feedback channel TP Singh, KD Gupta Journal of Mathematics and System Sciences 6 (2), 18-31, 2010 | 12 | 2010 |
Analysis of biserial servers linked to a common server in fuzzy environment D Gupta, S Sharma International Journal of Computer Applications 68 (6), 2013 | 11 | 2013 |
On steady state behaviour of a network queuing model with biserial and parallel channels linked with a common server D Gupta, S Sharma, N Gulati Computer engineering and intelligent systems 2 (2), 11-22, 2011 | 11 | 2011 |
Bicriteria scheduling on parallel machines: total tardiness and weighted flowtime in fuzzy environment S Sharma, D Gupta, S Sharma International Journal of Mathematics in Operational Research 5 (4), 492-507, 2013 | 10 | 2013 |
A Heuristic Approach to n × m Flow Shop Scheduling Problem in Which Processing Times Are Associated with Their Respective Probabilities with No‐Idle Constraint D Gupta, H Singh International Scholarly Research Notices 2013 (1), 948541, 2013 | 10 | 2013 |
A Fuzzy logic based approach to minimize the rental cost of machines for specially structured three stages flow-shop scheduling D Gupta, S Aggarwal, S Sharma Advances in applied science research 3 (2), 1071-1076, 2012 | 10 | 2012 |
Seema and Shefali (2011),“Bicriteria in n× 2 flow shop scheduling under specified rental policy, processing time and setup time each associated with probabilities including … D Gupta, S Sharma Industrial Engineering Letters 1 (1), 1-12, 2011 | 10 | 2011 |
Job block concept in two stage specially structured Flow shop scheduling to minimize the total waiting time of jobs D Gupta, B Goyal International Journal of Latest Trends in Engineering and Technology 7 (3 …, 2016 | 9 | 2016 |
Bi-objective scheduling on parallel machines with uncertain processing time D Gupta, S Sharma, S Aggarwal Advances in Applied Science Research 3 (2), 1020-1026, 2012 | 9 | 2012 |
Application of Branch and Bound Technique for n* 3 Flow Shop Scheduling in Which Processing Time Associated With Their Respective Probabilities D Gupta Mathematical Modeling and Theory 2 (1), 31-36, 2011 | 8 | 2011 |
WITHDRAWN: Optimizing rental cost with no idle constraints in two machines with weightage D Gupta, R Goel, H Kaur Materials Today: Proceedings, 2021 | 7 | 2021 |
An improvement heuristic for permutation flow shop scheduling KK Nailwal, D Gupta, K Jeet, S Sharma International Journal of Process Management and Benchmarking 9 (1), 124-148, 2019 | 6 | 2019 |