关注
Audrey Cerqueus
Audrey Cerqueus
IMT Atlantique
在 imt-atlantique.fr 的电子邮件经过验证
标题
引用次数
引用次数
年份
A branch-and-bound method for the bi-objective simple line assembly balancing problem
A Cerqueus, X Delorme
International Journal of Production Research 57 (18), 5640-5659, 2019
312019
Surrogate upper bound sets for bi-objective bi-dimensional binary knapsack problems
A Cerqueus, A Przybylski, X Gandibleux
European Journal of Operational Research 244 (2), 417-433, 2015
162015
On branching heuristics for the bi-objective 0/1 unidimensional knapsack problem
A Cerqueus, X Gandibleux, A Przybylski, F Saubion
Journal of Heuristics 23, 285-319, 2017
122017
Balancing and configuration planning of RMS to minimize energy cost
A Cerqueus, P Gianessi, D Lamy, X Delorme
Advances in Production Management Systems. Towards Smart and Digital …, 2020
112020
Evaluating the scalability of reconfigurable manufacturing systems at the design phase
A Cerqueus, X Delorme
International Journal of Production Research 61 (23), 8080-8093, 2023
102023
Reconfigurable digitalized and servitized production systems: requirements and challenges
M Paul, A Cerqueus, D Schneider, HH Benderbal, X Boucher, D Lamy, ...
Advances in Production Management Systems. Towards Smart and Digital …, 2020
92020
Analysis of the scalability for different configurations of lines
A Cerqueus, X Delorme, A Dolgui
Reconfigurable Manufacturing Systems: From Design to Implementation, 139-160, 2020
82020
Towards reconfigurable digitalized and servitized manufacturing systems: Conceptual framework
X Boucher, A Cerqueus, X Delorme, C Gonnermann, M Paul, G Reinhart, ...
Advances in Production Management Systems. Production Management for the …, 2019
82019
RMS balancing and planning under uncertain demand and energy cost considerations
X Delorme, A Cerqueus, P Gianessi, D Lamy
International Journal of Production Economics 261, 108873, 2023
62023
Using reconfigurable manufacturing systems to minimize energy cost: a two-phase algorithm
P Gianessi, A Cerqueus, D Lamy, X Delorme
IFAC-PapersOnLine 54 (1), 379-384, 2021
42021
A bi-objective based measure for the scalability of reconfigurable manufacturing systems
A Cerqueus, X Delorme
Advances in Production Management Systems. Artificial Intelligence for …, 2021
42021
Additive, structural, and multiplicative transformations for the construction of quasi-cyclic LDPC matrices
A Derrien, E Boutillon, A Cerqueus
IEEE Transactions on Communications 67 (4), 2647-2659, 2018
42018
Methodology for optimal wind vane design
H Kerhascoët, J Laurent, A Cerqueus, M Sevaux, E Senn, F Hauville, ...
OCEANS 2016-Shanghai, 1-7, 2016
42016
Retail order picking scheduling with missing operations and limited buffer
S Souiden, A Cerqueus, X Delorme, JL Rascle
IFAC-PapersOnLine 53 (2), 10767-10772, 2020
22020
Modelisation de la girouette d’un voilier: experimentation avec LocalSolver
A Cerqueus, M Sevaux, H Kerhascoet, J Laurent
ROADEF: Recherche Opérationnelle et d'Aide à la Décision, 2016
22016
Efficacité des heuristiques de branchement pour le branch-and-bound multi-objectif: vers une gestion plus dynamique
A Cerqueus, X Gandibleux, A Przybylski, F Saubion
ROADEF-15ème congrès annuel de la Société française de recherche …, 2014
22014
Simulated annealing for a bi-objective-based scalable balancing of a reconfigurable assembly line under uncertainty and limited resources
S Arbi, A Cerqueus, E Gurevsky, A Dolgui, A Siadat
50th International Conference on Computers & Industrial Engineering (CIE50), 2023
12023
Design and planning of configurations in RMS to minimize the energy cost facing uncertain demand
X Delorme, A Cerqueus, P Gianessi, D Lamy
International Working Seminar on Production Economics 2022 (IWSPE), 14p, 2022
12022
Simulation Model for a Semi-automated Retail Order Picking System under Uncertainty
S Souiden, A Cerqueus, X Delorme, JL Rascle
Smart and Sustainable Collaborative Networks 4.0: 22nd IFIP WG 5.5 Working …, 2021
12021
Bounds and bound sets for the bi-objective simple assembly line balancing problem
A Cerqueus, X Delorme
IESM 2017: 7th International Conference on Industrial Engineering and …, 2017
12017
系统目前无法执行此操作,请稍后再试。
文章 1–20