关注
Shahin Dabirian
Shahin Dabirian
Assistant Professor, Art University of Isfahan
在 aui.ac.ir 的电子邮件经过验证
标题
引用次数
引用次数
年份
Dynamic modelling of human resource allocation in construction projects
S Dabirian, S Abbaspour, M Khanzadi, M Ahmadi
International Journal of Construction Management, 1-10, 2019
402019
Forecasting contractor's deviation from the client objectives in prequalification model using support vector regression
AM Attar, M Khanzadi, S Dabirian, E Kalhor
International Journal of Project Management 31 (6), 924-936, 2013
402013
Predicting labor costs in construction projects using agent-based modeling and simulation
S Dabirian, M Khanzadi, M Moussazadeh
Scientia Iranica 23 (1), 91-101, 2016
242016
Evaluation of labor hiring policies in construction projects performance using system dynamics
SD Soroush Abbaspour
International Journal of Productivity and Performance Management, 2019
21*2019
Qualitative modeling of sustainability performance in construction projects considering productivity approach
S Dabirian, M Khanzadi, R Taheriattar
International Journal of Civil Engineering 15, 1143-1158, 2017
212017
Analyzing the impact of financial policies on construction projects performance using system dynamics
S Dabirian, M Ahmadi, S Abbaspour
Engineering, Construction and Architectural Management 30 (3), 1201-1221, 2023
192023
Predicting the effects of congestion on labour productivity in construction projects using agent-based modelling
S Dabirian, M Moussazadeh, M Khanzadi, S Abbaspour
International Journal of Construction Management 23 (4), 606-618, 2023
192023
Selecting the best strategy of labour productivity improvement in Tehran grade 1-3 construction contractor companies by applying analytic hierarchy process and statistical …
M Khanzadi, S Dabirian, A Mohammadpour, MO Makhmalbaf
The International symposium on the analytic hierarchy process (ISAHP …, 2011
172011
Applying delphi method and decision support system for bidding
M Khanzadi, S Dabirian, H Heshmatnejad
First International Conference on Construction in Developing Countries …, 2008
112008
Assessment of effective factors on time, cost and quality of mass house building projects using analytic hierarchy process—a case study in Tehran
M Khanzadi, S Dabirian, Y Youneszadeh
Retrieved on 17 (3), 2o17, 2008
72008
Estimating the effects of human resource motivation on construction projects performance using system dynamics
S Dabirian
Journal of Structural and Construction Engineering 8 (11), 193-210, 2022
52022
Application of analytic hierarchy process (AHP) to prioritize causes of claims based on the effect on the time and costs of infrastructural projects in the field of Iran oil …
M Khanzadi, S Dabirian, V Yousefi
Proc., Int. Symp. on the Analytic Hierarchy Process (ISAHP) 14, 2009
52009
Dynamic Modeling of Human Resource Development in Construction Projects
S Abbaspour, S Dabirian
Journal of Structural and Construction Engineering 7 (2), 246-266, 2020
32020
An improved evaluation of construction project’s labor need based on project workflow
S Dabirian, S Abbaspour, M Ahmadi
International Journal of Innovation, Management and Technology 9 (1), 49-55, 2018
12018
System dynamics modeling of construction safety management based on site corrective actions
S Dabirian, M Saffar
Proceedings of the 35th International Conference of the System Dynamics …, 2017
12017
DEVELOPING THE LSM VPR SCHEDULING METHOD FOR SCHEDULING HIGHWAY CONSTRUCTION PROJECTS BASED ON EFFECTIVE FACTORS ON EMBANKMENT ACTIVITY PRODUCTIVITY
M Khanzadi, S Dabirian, GK ZIA
INTERNATIONAL JOURNAL OF OPTIMIZATION IN CIVIL ENGINEERING 3 (4), 601-616, 2013
12013
Using Hybrid Method for Strategic Planning of Construction Contractor Companies
M Khanzadi, S Dabirian, R Taheriattar
Journal of American Science 8 (1), 513-524, 2012
12012
بررسی مهم‌ترین عوامل مؤثر بر تخطی هزینه در پروژه‌های ساخت با به‌کارگیری رویکرد ترکیبی پویایی سیستم و دیمتل
دبیریان, شاهین, خانزادی, عبدالهی
مجله ی مهندسی عمران شریف 36 (3.1), 13-28, 2020
2020
Implementing and continuity of lean construction using discrete event simulation
S Dabirian, S Ghorashi
Journal of Structural and Construction Engineering 5 (4), 93-111, 2019
2019
DYNAMIC MODELING OF CONSTRUCTION PROJECTS'LABOR NEED
S Dabirian, S ABBASPOUR, M KHANZADI
SHARIF: CIVIL ENINEERING 352 (22), 69-79, 2019
2019
系统目前无法执行此操作,请稍后再试。
文章 1–20