A review of planning and scheduling systems and methods for integrated steel production L Tang, J Liu, A Rong, Z Yang European Journal of operational research 133 (1), 1-20, 2001 | 540 | 2001 |
A multiple traveling salesman problem model for hot rolling scheduling in Shanghai Baoshan Iron & Steel Complex L Tang, J Liu, A Rong, Z Yang European Journal of Operational Research 124 (2), 267-282, 2000 | 523 | 2000 |
A mathematical programming model for scheduling steelmaking-continuous casting production L Tang, J Liu, A Rong, Z Yang European Journal of Operational Research 120 (2), 423-435, 2000 | 343 | 2000 |
Differential evolution with an individual-dependent mechanism L Tang, Y Dong, J Liu IEEE Transactions on Evolutionary Computation 19 (4), 560-574, 2014 | 305 | 2014 |
An improved differential evolution algorithm for practical dynamic scheduling in steelmaking-continuous casting production L Tang, Y Zhao, J Liu IEEE Transactions on Evolutionary Computation 18 (2), 209-225, 2013 | 293 | 2013 |
Steel-making process scheduling using Lagrangian relaxation L Tang, PB Luh, J Liu, L Fang International Journal of Production Research 40 (1), 55-70, 2002 | 288 | 2002 |
A hybrid multiobjective evolutionary algorithm for multiobjective optimization problems L Tang, X Wang IEEE Transactions on Evolutionary Computation 17 (1), 20-45, 2012 | 195 | 2012 |
Scheduling a hybrid flowshop with batch production at the last stage H Xuan, L Tang Computers & operations research 34 (9), 2718-2733, 2007 | 164 | 2007 |
Modeling and solution of the joint quay crane and truck scheduling problem L Tang, J Zhao, J Liu European Journal of Operational Research 236 (3), 978-990, 2014 | 136 | 2014 |
A two-stage flow shop scheduling problem on a batching machine and a discrete machine with blocking and shared setup times H Gong, L Tang, CW Duin Computers & Operations Research 37 (5), 960-969, 2010 | 129 | 2010 |
A new hybrid ant colony optimization algorithm for the vehicle routing problem X Zhang, L Tang Pattern Recognition Letters 30 (9), 848-855, 2009 | 125 | 2009 |
A multi-objective model for purchasing of bulk raw materials of a large-scale integrated steel plant Z Gao, L Tang International Journal of Production Economics 83 (3), 325-334, 2003 | 123 | 2003 |
A neural network model and algorithm for the hybrid flow shop scheduling problem in a dynamic environment L Tang, W Liu, J Liu Journal of Intelligent Manufacturing 16 (3), 361-370, 2005 | 121 | 2005 |
A new Lagrangian relaxation algorithm for hybrid flowshop scheduling to minimize total weighted completion time L Tang, H Xuan, J Liu Computers & Operations Research 33 (11), 3344-3359, 2006 | 119 | 2006 |
Decision support system for the batching problems of steelmaking and continuous-casting production L Tang, G Wang Omega 36 (6), 976-991, 2008 | 112 | 2008 |
Iterated local search algorithm based on very large-scale neighborhood for prize-collecting vehicle routing problem L Tang, X Wang The International Journal of Advanced Manufacturing Technology 29 (11-12 …, 2006 | 110 | 2006 |
A tabu search heuristic for the hybrid flowshop scheduling with finite intermediate buffers X Wang, L Tang Computers & Operations Research 36 (3), 907-918, 2009 | 109 | 2009 |
Modelling and a genetic algorithm solution for the slab stack shuffling problem when implementing steel rolling schedules L Tang, J Liu, A Rong, Z Yang International Journal of Production Research 40 (7), 1583-1595, 2002 | 105 | 2002 |
Data analytics and optimization for smart industry L Tang, Y Meng Frontiers of Engineering Management 8 (2), 157-171, 2021 | 103 | 2021 |
An improved Benders decomposition algorithm for the logistics facility location problem with capacity expansions L Tang, W Jiang, GKD Saharidis Annals of operations research 210 (1), 165-190, 2013 | 99 | 2013 |