关注
Chathuri Gunarathna
Chathuri Gunarathna
其他姓名M A C L Gunarathna, Chathuri L Gunarathna
在 rmit.edu.au 的电子邮件经过验证
标题
引用次数
引用次数
年份
The evolution of stakeholder management practices in Australian mega construction projects
RJ Yang, S Jayasuriya, C Gunarathna, M Arashpour, X Xue, G Zhang
Engineering, Construction and Architectural Management 25 (6), 690-706, 2018
552018
Reviewing global peer-to-peer distributed renewable energy trading projects
CL Gunarathna, RJ Yang, S Jayasuriya, K Wang
Energy Research & Social Science 89, 102655, 2022
332022
Skills developments of labourers to achieve the successful project delivery in the Sri Lankan construction industry
PGD Fernando, N Fernando, M Gunarathna
Civil and Environmental Research 8 (5), 86-97, 2016
322016
Conflicts and management styles in the Sri Lankan commercial building sector
C Gunarathna, RJ Yang, N Fernando
Engineering, Construction and Architectural Management 25 (2), 178-201, 2018
182018
Opportunities for improving construction health and safety using real-time H&S management innovations: a socio-technical-economic perspective
RJ Yang, CL Gunarathna, V McDermott, H Lingard, H Zhao, C Liu
International journal of construction management 20 (5), 534-554, 2020
132020
Diverse distributed renewable energy trading paradigms: a business model review
M Gunarathna, RJ Yang, A Song
Journal of Environmental Planning and Management 65 (1), 1-36, 2022
82022
BIM enabler for facilities management: A review of 33 cases
PU Wijeratne, C Gunarathna, RJ Yang, P Wu, K Hampson, A Shemery
International Journal of Construction Management 24 (3), 251-260, 2024
72024
Digitalizing building integrated photovoltaic (BIPV) conceptual design: A framework and an example platform
RJ Yang, ST Imalka, WMP Wijeratne, G Amarasinghe, N Weerasinghe, ...
Building and Environment 243, 110675, 2023
72023
Stakeholders' preference towards the use of conflict management styles in dual concern theory in post contract stage
M Gunarathna, NG Fernando
Ceylon Institute of Builders, 2013
62013
Prefabricated building integrated photovoltaics: cost and deployment
J Yang, R Wakefield, MAC Gunarathna, RPN Weerasinghe
Royal Institution of Chartered Surveyors (RICS) Research Trust, 2019
42019
Project-based learning for proactive skills development of postgraduate students in solar energy building design digitalisation
C Gunarathna, R Yang, PW Mudiyanselage, G Amarasinghe, ...
Smart and Sustainable Built Environment, 2023
22023
Opportunities for using blockchain in distributed solar energy projects
M Gunarathna, RJ Yang, S Jayasuriya, K Wang, T Samarasinghalage, ...
IOP Conference Series: Earth and Environmental Science 1101 (2), 022047, 2022
12022
Artificial intelligence-based pre-conception stage construction budget decision-making model and tool for residential buildings
AM Sadick, A Gurmu, C Gunarathna
Engineering, Construction and Architectural Management, 2024
2024
Opportunities for blockchain application in distributed solar energy (DSE) projects
M Arachchilage, L GUNARATHNA
RMIT University, 2022
2022
Strategic framework for local manufacturing of prefabricated active solar building
MACL Gunarathna, RJ Yang
Asia-Pacific Solar Research Conference, Newcastle, Australia, 2022
2022
Transitioning Bendigo’s Energy Economy, a Feasibility Study of Renewable Energy
J Yang, C Liu, C Gunarathna, K Wang, C Sun, G Rosengarten, ...
Centre for New Energy Technology, 2022
2022
Blockchain-based Business Platform for Peer-to-Peer Distributed Renewable Energy Trading
C Gunarathna, R Yang, A Song
CIB World Building Congress 2019, Hong Kong SAR, China, 3064-3073, 2019
2019
Opportunities for Improving Construction Health and Safety Using Real-time H&S Management Innovations
C Gunarathna, R Yang, V McDermott, H Lingard
22nd International Conference on Advancement of Construction Management and …, 2017
2017
Stakeholders’ Preference towards the Use of Conflict Management Styles in Dual Concern Theory in Post Contract Stage
GMA C.L., NG Fernando
International Conference on Construction in a Changing World, 2014
2014
Possibilities of use of NRM2 in the Sri Lankan construction industry
M Kularathna, B Perera, M Gunarathna, L Seneviratne
2014
系统目前无法执行此操作,请稍后再试。
文章 1–20