关注
Choi Yohyun
Choi Yohyun
KOREA INSTITUTE of CIVIL ENGINEERING and BUILDING TECHNOLOGY
在 kict.re.kr 的电子邮件经过验证
标题
引用次数
引用次数
年份
Predictive modelling for blasting-induced vibrations from open-pit excavations
YH Choi, SS Lee
Applied Sciences 11 (16), 7487, 2021
162021
A study on the optimal setting of large uncharged hole boring machine for reducing blast-induced vibration using deep learning
MS Kim, JK Lee, YH Choi, SH Kim, KW Jeong, KL Kim, SS Lee
Explosives and Blasting 38 (4), 16-25, 2020
92020
Reliability and efficiency of metamodel for numerical back analysis of tunnel excavation
YH Choi, SS Lee
Applied Sciences 12 (14), 6851, 2022
42022
Breaking new ground: Opportunities and challenges in tunnel boring machine operations with integrated management systems and artificial intelligence
J Loy-Benitez, MK Song, YH Choi, JK Lee, SS Lee
Automation in Construction 158, 105199, 2024
22024
Prediction of vertical alignment of the MSP borehole using artificial neural network
YH Choi, MS Kim, SS Lee
KSCE Journal of Civil Engineering 26 (10), 4330-4337, 2022
22022
Transfer component analysis-driven domain adaptation approach for estimating the life of tunnel boring machine disc cutters
J Loy-Benitez, HK Lee, MK Song, YH Choi, SS Lee
Tunnelling and Underground Space Technology 147, 105714, 2024
12024
系统目前无法执行此操作,请稍后再试。
文章 1–6