关注
Palaneeswaran Ekambaram
Palaneeswaran Ekambaram
在 swin.edu.au 的电子邮件经过验证
标题
引用次数
引用次数
年份
Contractor selection for design/build projects
E Palaneeswaran, MM Kumaraswamy
Journal of construction engineering and management 126 (5), 331-339, 2000
2422000
Recent advances and proposed improvements in contractor prequalification methodologies
E Palaneeswaran, M Kumaraswamy
Building and Environment 36 (1), 73-87, 2001
2072001
Curing congenital construction industry disorders through relationally integrated supply chains
E Palaneeswaran, M Kumaraswamy, M Rahman, T Ng
Building and environment 38 (4), 571-582, 2003
1482003
Factors contributing to the success of equipment-intensive subcontractors in construction
ST Ng, Z Tang, E Palaneeswaran
International journal of project management 27 (7), 736-744, 2009
1372009
Concessionaire selection for build-operate-transfer tunnel projects in Hong Kong
XQ Zhang, MM Kumaraswamy, W Zheng, E Palaneeswaran
Journal of Construction Engineering and Management 128 (2), 155-163, 2002
1142002
A support vector machine model for contractor prequalification
KC Lam, E Palaneeswaran, C Yu
Automation in Construction 18 (3), 321-329, 2009
1122009
Selection matters–in construction supply chain optimisation
M Kumaraswamy, E Palaneeswaran, P Humphreys
International Journal of Physical Distribution & Logistics Management 30 (7 …, 2000
1002000
Reducing rework to enhance project performance levels
E Palaneeswaran
Proceedings of the one day Seminar on" Recent Developments in Project …, 2006
992006
Targeting optimum value in public sector projects through “best value”‐focused contractor selection
E Palaneeswaran, M Kumaraswamy, T Ng
Engineering, construction and architectural management 10 (6), 418-431, 2003
942003
Benchmarking contractor selection practices in public‐sector construction—a proposed model
E Palaneeswaran, MM Kumaraswamy
Engineering, Construction and Architectural Management 7 (3), 285-299, 2000
942000
Reduce rework, improve safety: an empirical inquiry into the precursors to error in construction
PED Love, P Teo, F Ackermann, J Smith, J Alexander, E Palaneeswaran, ...
Production Planning & Control 29 (5), 353-366, 2018
852018
A dynamic e-Reporting system for contractor's performance appraisal
ST Ng, E Palaneeswaran, MM Kumaraswamy
Advances in Engineering software 33 (6), 339-349, 2002
852002
Review of performance measurement: implications for public–private partnerships
J Liu, PED Love, J Smith, M Regan, E Palaneeswaran
Built Environment Project and Asset Management 5 (1), 35-51, 2015
782015
Improving megaproject briefing through enhanced collaboration with ICT
JKH Chung, MM Kumaraswamy, E Palaneeswaran
Automation in construction 18 (7), 966-974, 2009
762009
Exploring delays in Victoria-based Astralian pipeline projects
A Orangi, E Palaneeswaran, J Wilson
Procedia engineering 14, 874-881, 2011
752011
Mapping rework causes and effects using artificial neural networks
E Palaneeswaran, PED Love, MM Kumaraswamy, TST Ng
Building research & information 36 (5), 450-465, 2008
752008
Client satisfaction and quality management systems in contractor organizations
E Palaneeswaran, T Ng, M Kumaraswamy
Building and environment 41 (11), 1557-1570, 2006
722006
Reforging construction supply chains:: a source selection perspective
E Palaneeswaran, MM Kumaraswamy, XQ Zhang
European Journal of Purchasing & Supply Management 7 (3), 165-178, 2001
652001
Empowering collaborative decisions in complex construction project scenarios
MM Kumaraswamy, ST Ng, OO Ugwu, E Palaneeswaran, MM Rahman
Engineering, Construction and Architectural Management 11 (2), 133-142, 2004
632004
Web-based client advisory decision support system for design–builder prequalification
E Palaneeswaran, MM Kumaraswamy
Journal of Computing in Civil Engineering 19 (1), 69-82, 2005
452005
系统目前无法执行此操作,请稍后再试。
文章 1–20