A green multi-objective integrated scheduling of production and distribution with heterogeneous fleet vehicle routing and time windows M Ganji, H Kazemipoor, SMH Molana, SM Sajadi Journal of Cleaner Production 259, 120824, 2020 | 110 | 2020 |
Innovation and improvements in project implementation and management; using FMEA technique M Bahrami, DH Bazzaz, SM Sajjadi Procedia-Social and Behavioral Sciences 41, 418-425, 2012 | 107 | 2012 |
Production control in a failure-prone manufacturing network using discrete event simulation and automated response surface methodology SM Sajadi, MM Seyed Esfahani, K Sörensen The International Journal of Advanced Manufacturing Technology 53, 35-46, 2011 | 75 | 2011 |
The deployment and internationalization speed of e-business in the digital entrepreneurship era B Ziyae, SM Sajadi, MH Mobaraki Journal of Global Entrepreneurship Research 4, 1-11, 2014 | 67 | 2014 |
A framework for business model with strategic innovation in ICT firms: The importance of information N Faghih, B Dastourian, SM Sajadi, A Henten, P Foroudi The Bottom Line 31 (1), 16-41, 2018 | 53 | 2018 |
Designing a stochastic multi-objective simulation-based optimization model for sales and operations planning in built-to-order environment with uncertain distant outsourcing R Aiassi, SM Sajadi, SM Hadji-Molana, A Zamani-Babgohari Simulation Modelling Practice and Theory 104, 102103, 2020 | 41 | 2020 |
A mathematical modeling for incorporating energy price hikes into total natural gas consumption forecasting VM Dalfard, MN Asli, SM Asadzadeh, SM Sajadi, A Nazari-Shirkouhi Applied Mathematical Modelling 37 (8), 5664-5679, 2013 | 41 | 2013 |
Optimal control and simulation for production planning of network failure-prone manufacturing systems with perishable goods A Hatami-Marbini, SM Sajadi, H Malekpour Computers & Industrial Engineering 146, 106614, 2020 | 38 | 2020 |
Robust and stable flexible job shop scheduling with random machine breakdowns: multi-objectives genetic algorithm approach SM Sajadi, A Alizadeh, M Zandieh, F Tavan International journal of mathematics in operational research 14 (2), 268-289, 2019 | 38 | 2019 |
Analysis of the gap between customers’ perceptions and employees’ expectations of service quality based on fuzzy SERVQUAL logic (case study: Mofid children’s hospital in Tehran … M Mashhadiabdol, SM Sajadi, K Talebi International Journal of Services and Operations Management 17 (2), 119-141, 2014 | 37 | 2014 |
Analyzing the development of the third-generation biodiesel production from microalgae by a novel hybrid decision-making method: The case of Iran MA Naeini, M Zandieh, SE Najafi, SM Sajadi Energy 195, 116895, 2020 | 35 | 2020 |
A multi-objective Environmental Hedging Point Policy with customer satisfaction criteria M Afshar-Bakeshloo, A Bozorgi-Amiria, SM Sajadi, F Jolai Journal of Cleaner Production 179, 478–494, 2018 | 34 | 2018 |
Multi-objective optimization for stochastic failure prone job shop scheduling problem via hybrid of NSGA-II and simulation method S Amelian, SM Sajadi, M Navabakhsh, Mehrzad, Esmaeilian Expert System, 1-18, 2019 | 29 | 2019 |
The analysis of effect of aspiration to growth of managers for SMEs growth case study: Exporting manufacturing SMEs in Iran F Hanifzadeh, K Talebi, SM Sajadi Journal of entrepreneurship in Emerging Economies 10 (2), 277-301, 2018 | 27 | 2018 |
Optimal production and preventive maintenance rate in a failure-prone manufacturing system using discrete event simulation S Amelian, SM Sajadi, M Alinaghian Int. J. Industrial and Systems Engineering 20 (4), 483-496, 2015 | 25 | 2015 |
Investigate the Parameters which Affect the Patients Waiting Time In Emergency Department of Orthopedic Services in Ayatollah Kashani Abstract Hospital with the Lean … A Mahabadi, S Ketabi, SM Sajadi Health Inf Manage 11 (7), 1016-1025, 2015 | 23 | 2015 |
An Emergency Medical Services System Design Using Mathematical Modelling and Simulation-Based Optimization Approaches A Hatami-Marbini, N Varzgani, SM Sajadi, A Kamali Available at SSRN 4057582, 2022 | 22 | 2022 |
Simulation optimization for the Nurse Scheduling in a Hospital Emergency Department (Case study: Shahid Beheshti Hospital) SM sajadi, S Ghasemi, H Vahdani International Journal of Industrial and Systems Engineering 23 (4), 405-419, 2016 | 22 | 2016 |
A hybrid FMEA-TOPSIS method for risk management, Case Study: Esfahan Mobarakeh Steel Company M Ahmadi, SM Hajimolana, SM Sajadi International Journal of Process Management and Benchmarking 7 (3), 397-408, 2017 | 21 | 2017 |
A New Fuzzy Multi-Objective Multi-Mode Resource-Constrained Project Scheduling Model SM Sajadi, P Azimi, A Ghamginzadeh, A Rahimzadeh Int. J. of Mathematics in Operational Research 12 (1), 45-66, 2017 | 20 | 2017 |