关注
Gursans GUVEN
标题
引用次数
引用次数
年份
Analyzing the benefits of RFID technology for cost sharing in construction supply chains: A case study on prefabricated precast components
G Demiralp, G Guven, E Ergen
Automation in construction 24, 120-129, 2012
1372012
Taxonomy of uncertainty in environmental life cycle assessment of infrastructure projects
S Saxe, G Guven, L Pereira, A Arrigoni, T Opher, A Roy, A Arceo, ...
Environmental Research Letters 15 (8), 083003, 2020
512020
Capturing variability in material intensity of single-family dwellings: A case study of Toronto, Canada
A Arceo, M Tham, G Guven, HL MacLean, S Saxe
Resources, Conservation and Recycling 175, 105885, 2021
302021
A construction classification system database for understanding resource use in building construction
G Guven, A Arceo, A Bennett, M Tham, B Olanrewaju, M McGrail, K Isin, ...
Scientific Data 9 (1), 42, 2022
282022
Providing guidance for evacuation during an emergency based on a real-time damage and vulnerability assessment of facilities
G Guven, E Ergen, MA Erberik, O Kurc, MT Birgönül
Computing in Civil Engineering (2012), 586-593, 2012
202012
Identification of local information items needed during search and rescue following an earthquake
G Guven, E Ergen
Disaster Prevention and Management: An International Journal 20 (5), 458-472, 2011
202011
Embodied greenhouse gas assessment of a bridge: A comparison of preconstruction Building Information Model and construction records
M Nahangi, G Guven, B Olanrewaju, S Saxe
Journal of Cleaner Production 295, 126388, 2021
192021
Formalization of occupant feedback and integration with BIM in office buildings
E Ergen, B Kula, G Guven, D Artan
Journal of computing in civil engineering 35 (1), 04020055, 2021
182021
Tracking major resources for automated progress monitoring of construction activities: masonry work case
G Guven, E Ergen
Construction Innovation 21 (4), 648-667, 2021
172021
BIM-Based Automated Safety Review for Fall Prevention
G Tekbas, G Guven
Communications in Computer and Information Science 1188, 80-90, 2020
112020
A rule-based methodology for automated progress monitoring of construction activities: a case for masonry work
G Guven, E Ergen
Journal of Information Technology in Construction, 2019
102019
Determining the benefits of an RFID-based system for tracking pre-fabricated components in a supply chain
E Ergen, G Demiralp, G Guven
Computing in Civil Engineering (2011), 291-298, 2011
102011
Blockage assessment of buildings during emergency using multiple types of sensors
E Ergen, G Guven, O Kurc, MA Erberik, T Ergin, MT Birgonul, B Akinci
Automation in Construction 49, 71-82, 2015
92015
Local information access for search and rescue using wireless data storage mediums
E Ergen, S Sariel-Talay, G Guven, G Avdan
Journal of computing in civil engineering 25 (4), 263-274, 2011
92011
Rateworkspace: BIM integrated post-occupancy evaluation system for office buildings
D Artan, E Ergen, B Kula, GG Işın
Journal of Information Technology in Construction, 2022
82022
Assessing the need for storing data on radio frequency identification (RFID) tags
E Ergen, G Guven
26th International CIB W078 Conference-Managing IT in Construction, Istanbul …, 2009
62009
Factors affecting the selection of data storage approach in radio frequency identification applications
G Guven, E Ergen
Construction Innovation 13 (1), 117-138, 2013
42013
Requirements of indoor navigation during emergency response and disaster management
M Ayhan, G Güven Işın, E Ergen Pehlevan, M Erberik, Ö Kurç, M Birgönül
42012
Value of RFID technology in construction supply chains
G Guven, G Demiralp, E Ergen
The Value of RFID: Benefits vs. Costs, 111-127, 2013
32013
Evaluation of RFID and Wireless Sensor Technologies for Local Search and Rescue Data Storage
G Avdan, E Ergen, G Guven, C Eroglu, S Sariel-Talay
International Symposium on Robotics and Intelligent Sensors (IRIS2010), 8-11, 2010
32010
系统目前无法执行此操作,请稍后再试。
文章 1–20