关注
Timothy R.B. Taylor, P.E., Ph.D.
Timothy R.B. Taylor, P.E., Ph.D.
National Center for Construction Education and Research
在 uky.edu 的电子邮件经过验证
标题
引用次数
引用次数
年份
Impact of skilled labor availability on construction project cost performance
H Karimi, TRB Taylor, GB Dadi, PM Goodrum, C Srinivasan
Journal of Construction Engineering and Management 144 (7), 04018057, 2018
1312018
Analysis of the impact of craft labour availability on North American construction project productivity and schedule performance
H Karimi, TRB Taylor, PM Goodrum
Construction management and economics 35 (6), 368-380, 2017
962017
Modeling the impact of design rework on transportation infrastructure construction project performance
Y Li, TRB Taylor
Journal of construction engineering and management 140 (9), 04014044, 2014
942014
Managing tipping point dynamics in complex construction projects
TRB Taylor, DN Ford
Journal of Construction Engineering and Management 134 (6), 421-431, 2008
932008
Change orders and lessons learned: Knowledge from statistical analyses of engineering change orders on Kentucky highway projects
TRB Taylor, M Uddin, PM Goodrum, A McCoy, Y Shan
Journal of Construction Engineering and Management 138 (12), 1360-1369, 2012
922012
Cognitive workload demands using 2D and 3D spatial engineering information formats
GB Dadi, PM Goodrum, TRB Taylor, CM Carswell
Journal of Construction Engineering and Management 140 (5), 04014001, 2014
882014
Improving model understanding using statistical screening
TRB Taylor, DN Ford, A Ford
System Dynamics Review 26 (1), 73-87, 2010
602010
Nighttime construction issues
DE Hancher, T Taylor
Transportation Research Record 1761 (1), 107-115, 2001
562001
Quantitative analysis of the impact of craft worker availability on construction project safety performance
H Karimi, TRB Taylor, PM Goodrum, C Srinivasan
Construction Innovation 16 (3), 307-322, 2016
532016
Project controls to minimize cost and schedule overruns: A model, research agenda, and initial results
DN Ford, JM Lyneis, T Taylor
2007 International System Dynamics Conference, 1-27, 2007
522007
Forecasting highway construction staffing requirements
TRB Taylor, WF Maloney
NCHRP synthesis of highway practice, 2013
502013
Effectiveness of communication of spatial engineering information through 3D CAD and 3D printed models
GB Dadi, PM Goodrum, TRB Taylor, WF Maloney
Visualization in Engineering 2, 1-12, 2014
452014
Project scoping process model development to achieve on-time and on-budget delivery of highway projects
S Kermanshachi, SD Anderson, P Goodrum, TRB Taylor
Transportation Research Record 2630 (1), 147-155, 2017
412017
The impact of design rework on construction project performance
Y Li, TRB Taylor
Proceedings of the 29th Annual International Conference of the System …, 2011
292011
Performance of 3D computers and 3D printed models as a fundamental means for spatial engineering information visualization
GB Dadi, TRB Taylor, PM Goodrum, WF Maloney
Canadian Journal of Civil Engineering 41 (10), 869-877, 2014
262014
Demographic influences on construction craft shortages in the US and Canada
MA Albattah, PM Goodrum, TRB Taylor
242015
Development of multi-level scoping process framework for transportation infrastructure projects using IDEF modeling technique
S Kermanshachi, E Safapour, S Anderson, P Goodrum, T Taylor, ...
Proceedings of transportation research board 98th annual conference, 2630-18, 2019
232019
Effective project scoping practices to improve on-time and on-budget delivery of highway projects
S Anderson, C Quiroga, J Overman, K Choi, J Sahu, S Kermanshachi, ...
NCHRP Report, 2016
202016
Impact of public policy and societal risk perception on US civilian nuclear power plant construction
TRB Taylor, DN Ford, KF Reinschmidt
Journal of construction engineering and management 138 (8), 972-981, 2012
202012
Young talent motivations to pursue craft careers in construction: The theory of planned behavior
F Minooei, PM Goodrum, TRB Taylor
Journal of Construction Engineering and Management 146 (7), 04020082, 2020
192020
系统目前无法执行此操作,请稍后再试。
文章 1–20