Simultaneous balancing and buffer allocation decisions for the design of mixed-model assembly lines with parallel workstations and stochastic task times L Tiacci International Journal of Production Economics 162, 201-215, 2015 | 98 | 2015 |
An approach to evaluate the impact of interaction between demand forecasting method and stock control policy on the inventory system performances L Tiacci, S Saetta International Journal of Production Economics 118 (1), 63-71, 2009 | 78 | 2009 |
Integrating ergonomic risks evaluation through OCRA index and balancing/sequencing decisions for mixed model stochastic asynchronous assembly lines L Tiacci, M Mimmi Omega 78, 112-138, 2018 | 68 | 2018 |
Reducing the mean supply delay of spare parts using lateral transshipments policies L Tiacci, S Saetta International Journal of Production Economics 133 (1), 182-191, 2011 | 68 | 2011 |
Coupling a genetic algorithm approach and a discrete event simulator to design mixed-model un-paced assembly lines with parallel workstations and stochastic task times L Tiacci International Journal of Production Economics 159, 319-333, 2015 | 59 | 2015 |
Event and object oriented simulation to fast evaluate operational objectives of mixed model assembly lines problems L Tiacci Simulation Modelling Practice and Theory 24, 35-48, 2012 | 49 | 2012 |
A heuristic for balancing the inventory level of different locations through lateral shipments L Tiacci, S Saetta International Journal of Production Economics 131 (1), 87-95, 2011 | 48 | 2011 |
Mixed-model U-shaped assembly lines: Balancing and comparing with straight lines with buffers and parallel workstations L Tiacci Journal of Manufacturing Systems 45, 286-305, 2017 | 47 | 2017 |
The innovative model of the Virtual Development Office for collaborative networked enterprises: the GPT network case study S Saetta, L Tiacci, L Cagnazzo International Journal of Computer Integrated Manufacturing 26 (1-2), 41-54, 2013 | 46 | 2013 |
Demand forecasting, lot sizing and scheduling on a rolling horizon basis L Tiacci, S Saetta International Journal of Production Economics 140 (2), 803-814, 2012 | 46 | 2012 |
Object-oriented event-graph modeling formalism to simulate manufacturing systems in the Industry 4.0 era L Tiacci Simulation Modelling Practice and Theory 99, 102027, 2020 | 34 | 2020 |
Supplying networks in the healthcare sector: a new outsourcing model for materials management C Paltriccia, L Tiacci Industrial Management & Data Systems 116 (8), 1493-1519, 2016 | 33 | 2016 |
A decomposition approach for the performance analysis of a serial multi-echelon supply chain S Saetta, L Paolini, L Tiacci, T Altiok International Journal of Production Research 50 (9), 2380-2395, 2012 | 23 | 2012 |
Knowledge management system in SMEs within stable enterprise networks L Cagnazzo, L Tiacci, V Rossi WSEAS Transactions on Business and Economics 11 (1), 155-174, 2014 | 19 | 2014 |
Balancing mixed-model assembly lines with parallel workstations through a genetic algorithm approach L Tiacci, S Saetta, A Martini International Journal of Industrial Engineering 13 (4), 402, 2006 | 19 | 2006 |
A logistic network to harmonise the development of local food system with safety and sustainability SA Saetta, V Caldarelli, L Tiacci, N Lerche, J Geldermann International Journal of Integrated Supply Management 9 (4), 307-328, 2015 | 18 | 2015 |
Evaluating how potential pool of Partners can join together in different types of Long Term Collaborative Networked Organizations A Cardoni, S Saetta, L Tiacci Collaborative Networks for a Sustainable World: 11th IFIP WG 5.5 Working …, 2010 | 13 | 2010 |
A web-based simulation game as a learning tool for the design process of complex systems F Bianconi, SA Saetta, L Tiacci Journal of Design Research 5 (2), 253-272, 2006 | 13 | 2006 |
Strategic context, organizational features and network performances: A survey on collaborative networked organizations of Italian SMEs A Ricciardi, A Cardoni, L Tiacci Collaborative Systems for Smart Networked Environments: 15th IFIP WG 5.5 …, 2014 | 10 | 2014 |
The cost-oriented stochastic assembly line balancing problem: a chance constrained programming approach A Foroughi, H Gökçen, L Tiacci International Journal of Industrial Engineering 23 (6), 412-430, 2016 | 9 | 2016 |