关注
mohammad arif rohman
mohammad arif rohman
Department of Civil Engineering, Institut Teknologi Sepuluh Nopember (ITS)
在 ce.its.ac.id 的电子邮件经过验证 - 首页
标题
引用次数
引用次数
年份
Development of project cost contingency estimation model using risk analysis and fuzzy expert system
A Idrus, MF Nuruddin, MA Rohman
Expert Systems with Applications 38 (3), 1501-1508, 2011
1652011
Success criteria of toll road projects from a community societal perspective
MA Rohman, H Doloi, CA Heywood
Built environment project and asset management, ISSN: 2044-124X ., DOI 10 …, 2017
602017
Analisa Penyebab Keterlambatan Proyek Pembangunan Sidoarjo Town Square Menggunakan Metode Fault Tree Analysis (FTA)
R Amalia, MA Rohman, CB Nurcahyo
Jurnal Teknik ITS 1 (1), D20-D23, 2012
412012
Evaluation of road design performance in delivering community project social benefits in Indonesian PPP
MA Rohman, IPA Wiguna
International Journal of Construction Management, 1-13, 2019
312019
Penilaian Kriteria Green Building pada Gedung Teknik Sipil ITS
AA Putri, MA Rohman, C Utomo
Jurnal Teknik ITS 1 (1), D107-D112, 2012
312012
The occupant's awareness to achieve energy efficiency in campus building
AG Prafitasiwi, MA Rohman, CS Ongkowijoyo
Results in Engineering 14, 100397, 2022
252022
Analisis Prioritas Pemeliharaan Jalan Kabupaten Karanganyar Metode Analytical Hierarchy Process (AHP)
V Sushera, MA Rohman, AAG Kartika
Jurnal Transportasi: Sistem, Material, Dan Infrastruktur 1 (2), 95-99, 2019
202019
The barrier and driver factors of building information modelling (BIM) adoption in indonesia: a preliminary survey
FR Utomo, MA Rohman
IPTEK Journal of Proceedings Series, 133-139, 2019
182019
Assessment of the government’s role performance in public-private partnership (PPP) toll road projects in Indonesia
MA Rohman
Journal of Financial Management of Property and Construction, ISSN: 1366 …, 2021
162021
A framework for green supply chain management in construction sector: A case study in Indonesia
IPA Wiguna, F Rachmawati, MA Rohman, LB Setyaning
Journal of Industrial Engineering and Management 14 (4), 788-807, 2021
102021
Risk analysis of traffic congestion due to problem in heavy vehicles: a concept
PA Kesuma, MA Rohman, CA Prastantyo
First International Conference of Construction, Infrastructure, and …, 2019
102019
Analysis The Effect of Total Quality Management, Technology, and Knowledge Management on Product Quality in Indonesia Construction Industry
MY Latansa, TJW Adi, MA Rohman
IPTEK Journal of Proceedings Series, 527-535, 2019
92019
Analisa perbandingan metode pelaksanaan cast in situ dengan pracetak terhadap biaya dan waktu pada proyek dian regency apartemen
F Fani, IPA Wiguna, MA Rohman
Jurnal Teknik POMITS 1 (1), 1-6, 2012
92012
Rencana Kontijensi untuk Tanah Longsor di Desa Kalikuning, Pacitan, Jawa Timur
T Tatas, IPA Wiguna, M Machsus, TD Widyastuti, MA Rohman
Jurnal Aplikasi Teknik Sipil 13 (2), 27-40, 2015
72015
Model Pelatihan Inovasi Manajemen Biaya untuk Ketangguhan Usaha UMKM Konstruksi
C Utomo, R Indriyani, MA Rohman, CB Nurcahyo, YE Putri
Sewagati 6 (4), 463-469, 2022
62022
Identification of fire safety indicators for shopping centre buildings in Surabaya
GF Marantika, MA Rohman, F Rachmawati, IPA Wiguna
IOP Conference Series: Materials Science and Engineering 930 (1), 012009, 2020
62020
A concept to evaluate procurement principles implementation of public construction project in Surabaya
PV Sandi, MA Rohman, C Utomo
IOP Conference Series: Materials Science and Engineering 930 (1), 012005, 2020
62020
Pelatihan Manajemen Keuangan UMKM Konstruksi di Surabaya untuk Keberlanjutan Kinerja Usaha
YE Putri, C Utomo, R Indryani, C Rahmawati, MA Rohman
Seminar Nasional Penelitian Dan Pengabdian Kepada Masyarakat 2, 383-392, 2020
62020
Social sustainability indicators for school buildings in Surabaya
YA Hidayat, MA Rohman, C Utomo
International Conference on Planning towards Sustainability (ICoPS), 1-8, 2020
62020
Klasifikasi Faktor-Faktor Penghambat Dan Pendorong Adopsi Building Information Modelling (Bim) Di Indonesia
FR Utomo, MA Rohman
Fakultas Bisnis dan Manajemen Teknologi ITS, 2019
62019
系统目前无法执行此操作,请稍后再试。
文章 1–20