A literature review on the impact of RFID technologies on supply chain management A Sarac, N Absi, S Dauzère-Pérès International journal of production economics 128 (1), 77-95, 2010 | 815 | 2010 |
An integrated approach for modeling and solving the general multiprocessor job-shop scheduling problem using tabu search S Dauzère-Pérès, J Paulli Annals of Operations Research 70 (0), 281-306, 1997 | 546 | 1997 |
Single item lot sizing problems N Brahimi, S Dauzere-Peres, NM Najid, A Nordli European Journal of Operational Research 168 (1), 1-16, 2006 | 520 | 2006 |
A survey of problems, solution techniques, and future challenges in scheduling semiconductor manufacturing operations L Mönch, JW Fowler, S Dauzère-Pérès, SJ Mason, O Rose Journal of scheduling 14, 583-599, 2011 | 447 | 2011 |
Lot sizing with carbon emission constraints N Absi, S Dauzère-Pérès, S Kedad-Sidhoum, B Penz, C Rapine European Journal of Operational Research 227 (1), 55-61, 2013 | 340 | 2013 |
Routing trains through railway stations: Model formulation and algorithms PJ Zwaneveld, LG Kroon, HE Romeijn, M Salomon, S Dauzere-Peres, ... Transportation science 30 (3), 181-194, 1996 | 258 | 1996 |
Solving the flexible job shop scheduling problem with sequence-dependent setup times L Shen, S Dauzère-Pérès, JS Neufeld European journal of operational research 265 (2), 503-516, 2018 | 239 | 2018 |
A genetic local search algorithm for minimizing total weighted tardiness in the job-shop scheduling problem I Essafi, Y Mati, S Dauzère-Pérès Computers & Operations Research 35 (8), 2599-2616, 2008 | 212 | 2008 |
Single-item dynamic lot-sizing problems: An updated survey N Brahimi, N Absi, S Dauzère-Pérès, A Nordli European Journal of Operational Research 263 (3), 838-863, 2017 | 210 | 2017 |
A modified shifting bottleneck procedure for job-shop scheduling S Dauzere-Peres, JB Lasserre The international journal of production research 31 (4), 923-932, 1993 | 205 | 1993 |
Multi-resource shop scheduling with resource flexibility S Dauzère-Pérès, W Roux, JB Lasserre European Journal of Operational Research 107 (2), 289-305, 1998 | 157 | 1998 |
A two-phase iterative heuristic approach for the production routing problem N Absi, C Archetti, S Dauzère-Pérès, D Feillet Transportation Science 49 (4), 784-795, 2015 | 148 | 2015 |
Genetic algorithms to minimize the weighted number of late jobs on a single machine M Sevaux, S Dauzère-Pérès European journal of operational research 151 (2), 296-306, 2003 | 147 | 2003 |
Artificial intelligence in manufacturing and logistics systems: algorithms, applications, and case studies CF Chien, S Dauzère-Pérès, WT Huh, YJ Jang, JR Morrison International Journal of Production Research 58 (9), 2730-2731, 2020 | 146 | 2020 |
Flexibility and robustness in scheduling JC Billaut, A Moukrim, E Sanlaville ISTE/John Wiley & Sons, 2008 | 143 | 2008 |
Modelling and analysis of semiconductor manufacturing in a shrinking world: challenges and successes CF Chien, S Dauzère-Pérès, H Ehm, JW Fowler, Z Jiang, ... European Journal of Industrial Engineering 4 5 (3), 254-271, 2011 | 127 | 2011 |
Solving the discrete lotsizing and scheduling problem with sequence dependent set-up costs and set-up times using the travelling salesman problem with time windows M Salomon, MM Solomon, LN Van Wassenhove, Y Dumas, ... European Journal of Operational Research 100 (3), 494-513, 1997 | 123 | 1997 |
Integration of lotsizing and scheduling decisions in a job-shop S Dauzère-Péres, JB Lasserre European Journal of Operational Research 75 (2), 413-426, 1994 | 112 | 1994 |
A general approach for optimizing regular criteria in the job-shop scheduling problem Y Mati, S Dauzère-Pérès, C Lahlou European Journal of Operational Research 212 (1), 33-42, 2011 | 111 | 2011 |
An integrated approach in production planning and scheduling S Dauzère-Pérès, JB Lasserre Lecture notes in economics and mathematical systems 411, 1994 | 107* | 1994 |