关注
Ehsan Asnaashari
Ehsan Asnaashari
Senior Lecturer, Construction Management, Nottingham Trent University
在 ntu.ac.uk 的电子邮件经过验证 - 首页
标题
引用次数
引用次数
年份
Causes of construction delays in Iran: project management, logistics, technology and environment
E Asnaashari, A Knight, A Hurst, SS Farahani
Procs 25th Annual ARCOM Conference, 7-9, 2009
522009
ICT adoption in the Iranian construction industry: barriers and opportunities
A Alaghbandrad, MB Nobakht, M Hosseinalipour, E Asnaashari
proceedings of the 28th ISARC, Seoul, Korea, 280-285, 2011
342011
Identifying success factors of healthcare facility construction projects in Iran
RZ Doulabi, E Asnaashari
Procedia engineering 164, 409-415, 2016
312016
Problems and barriers of ICT utilization on Iranian construction sites: Case study on the successful use of ICT in remote construction sites
A Alaghbandrad, E Asnaashari, C Preece
Journal of Information Technology in Construction (ITcon) 17 (6), 93-102, 2012
292012
Strategy management of construction workspaces by conflict resolution algorithm and visualization model
M Rohani, G Shafabakhsh, A Haddad, E Asnaashari
Engineering, Construction and Architectural Management 25 (8), 1053-1074, 2018
252018
A hybrid fuzzy risk assessment framework for determining building demolition safety index
M Alipour-Bashary, M Ravanshadnia, H Abbasianjahromi, E Asnaashari
KSCE Journal of Civil Engineering 25 (4), 1144-1162, 2021
142021
The workflow planning of construction sites using whale optimization algorithm (WOA)
M Rohani, G Shafabakhsh, A Haddad, E Asnaashari
Turk Online J Des Art Commun 6, 2938-2950, 2016
122016
Delays in the Iranian construction projects: Stakeholders and economy
E Asnaashari, A Knight, A Hurst
Challenges, opportunities and solutions in structural engineering and …, 2009
92009
Building demolition risk assessment by applying a hybrid fuzzy FTA and fuzzy CRITIC-TOPSIS framework
M Alipour-Bashary, M Ravanshadnia, H Abbasianjahromi, E Asnaashari
International Journal of Building Pathology and Adaptation 40 (1), 134-159, 2022
82022
Operation planning of concrete box girder bridge by 4D CAD visualization techniques
M Rohani, G Shafabakhsh, A Haddad, E Asnaashari
International Journal of Civil and Environmental Engineering 10 (6), 811-817, 2016
82016
Causes of delay in Iran construction projects
E Asnaashari, S Farahani, A Hoseini, A Knight, A Hurst
Proceedings of the 5th International Conference on Construction in the 21st …, 2009
72009
A holistic conceptual model for managing construction logistics in building projects: The case of Iran
E Asnaashari
PQDT-Global, 2011
62011
Causes of construction delays in Iran
E Asnaashari, A Knight, A Hurst, SS Farahani
Design and the Built Environment Nottingham Trent University, Burton Street …, 2010
52010
Sensitivity Analysis of Workspace Conflicts According to Changing Geometric Conditions
M Rohani, G Shafabakhsh, A Haddad, E Asnaashari
Engineering, Technology & Applied Science Research 7 (1), 1429-1435, 2017
42017
Organizational project management maturity from the construction practitioners point of view
S MOTAMEDPOOYA, E ASNAASHARI
42016
ICT utilization in administrative tasks in Iranian construction organizations
AA Rad, E Asnaashari, A Knight, A Hurst
Proceedings 26th Annual ARCOM Conference, 615-624, 2010
32010
Identifying and ranking the occupational stressors and developing a TOPSIS framework for project managers in Iran to cope with occupational stress
E Asnaashari, RZ Doulabi, N Dadkhah, N Saghafi, L Ghanbariha
THIRTY-Seventh ANNUAL CONFERENCE, 199, 2021
22021
Contract risk analysis in transportation infrastructure projects based on public-private partnership (PPP) method
O Pourafshar, B Barmayehvar, R Esmaeilabadi, E Asnaashari
Civil Infrastructure Researches 7 (1), 189-210, 2021
12021
Building Information Modeling Implementation in Iran Review
AHS Beydokhti, H Bahrami, E Asnaashari
The first international conference and the third national conference on …, 2016
12016
Quantitative Analysis of ICT Utilization Problems in the Iranian Construction Industry
A Alaghbandrad, E Asnaashari, MB Nobakht
The Construction, Building & Real Estate Research Conference, 11-13, 2012
12012
系统目前无法执行此操作,请稍后再试。
文章 1–20