关注
Gonçalves, B.S.
标题
引用次数
引用次数
年份
Implementation of lean in health care environments: an update of systematic reviews
RM Lima, J Dinis-Carvalho, TA Souza, E Vieira, B Gonçalves
International Journal of Lean Six Sigma 12 (2), 399-431, 2021
572021
A two-level optimisation-simulation method for production planning and scheduling: the industrial case of a human–robot collaborative assembly line
M Vieira, S Moniz, BS Gonçalves, T Pinto-Varela, AP Barbosa-Póvoa, ...
International Journal of Production Research 60 (9), 2942-2962, 2022
302022
Modeling, assessment and design of an emergency department of a public hospital through discrete-event simulation
A Castanheira-Pinto, BS Gonçalves, RM Lima, J Dinis-Carvalho
Applied Sciences 11 (2), 805, 2021
232021
Integrating simulation and optimization for process planning and scheduling problems
M Vieira, S Moniz, B Gonçalves, T Pinto-Varela, AP Barbosa-Póvoa
Computer Aided Chemical Engineering 46, 1441-1446, 2019
102019
Assessment of biomass supply chain design and planning using discrete-event simulation modeling
H Paulo, M Vieira, BS Gonçalves, T Pinto-Varela, AP Barbosa-Póvoa
Computer Aided Chemical Engineering 51, 967-972, 2022
42022
Improving hospital operations management to reduce ineffective medical appointments
L Barretiri, BS Gonçalves, RM Lima, J Dinis-Carvalho
Cogent Engineering 8 (1), 1904806, 2021
42021
Optimization model for waiting list management and service continuous improvement
REL Vieira, BSF Gonçalves, RM Lima, J Dinis-Carvalho
42020
Production planning and setup time optimization: an industrial case study
JP Vaz, L Varela, B Gonçalves, J Machado
Design, Simulation, Manufacturing: The Innovation Exchange, 220-230, 2020
22020
A systematized approach for reduction of medical appointment waiting list
BS Gonçalves, E Vieira, RM Lima, J Dinis-Carvalho
Production 32, e20210137, 2022
12022
Reducing waiting time for orthopaedic consultation through a continuous improvement approach
J Dinis-Carvalho, E Vieira, RM Lima, BS Gonçalves
Innovations in industrial engineering, 461-471, 2022
12022
Prioritizing internal production on MRI waiting list management: an optimization model
L Barretiri, BS Gonçalves, RM Lima, J Dinis-Carvalho
International Conference Innovation in Engineering, 68-78, 2021
12021
Data Modelling and Validation of An Emergency Department Simulation Model—A Lean Healthcare Approach
A Castanheira-Pinto, B Gonçalves, RM Lima, J Dinis-Carvalho
International Joint conference on Industrial Engineering and Operations …, 2021
12021
Infrastructure Management in Portugal: A Survey
B Gonçalves, J Matos, P Lourenço
IABSE Congress Report 18 (8), 1460-1467, 2012
12012
An Approach to the Design of Resilient Biomass Supply Chain Using Discrete Event held at Simulation
H Paulo, M Vieira, BS Gonçalves, T Pinto-Varela, APBP D ID
Industrial Engineering and Operations Management: XXIX IJCIEOM, Lisbon …, 2023
2023
An Approach to the Design of Resilient Biomass Supply Chain Using Discrete Event Simulation
H Paulo, M Vieira, BS Gonçalves, T Pinto-Varela, AP Barbosa-Póvoa
International Joint conference on Industrial Engineering and Operations …, 2023
2023
Industrial Management for Industry 4.0–Simulation System to Support Learning of Opportunities and Challenges of Dealing with Real-Time Data
RM Lima, BS Gonçalves, ET Lopes, V Tino, RM Sousa
Leveraging Transdisciplinary Engineering in a Changing and Connected World …, 2023
2023
A Discrete-Event Simulation Approach to the Design and Planning of Biomass Supply Chains considering Technological Learning
H Paulo, M Vieira, BS Gonçalves, S Relvas, T Pinto-Varela, ...
Computer Aided Chemical Engineering 52, 1285-1291, 2023
2023
DEPENDÊNCIA DA QUALIDADE DO AR EM FUNÇÃO DOS FATORES METEREOLÓGICOS NO CAMPUS 2 DO POLITÉCNICO DE LEIRIA
J Siopa, B Gonçalves, L Aires, M Gaspar
7 BOAS VINDAS, 14, 2022
2022
Analysing a meta-model for production scheduling in different kind of flow shop configurations
JD Martins, L Varela, B Gonçalves, J Machado, AC Monteiro, G Putnik
Procedia CIRP 112, 51-56, 2022
2022
Towards an Integrated Decision-Support Framework for the New Generation of Manufacturing Systems
M Vieira, F Coelho, C da Silva, B Mota, J Guapo, R Macedo, B Gonçalves, ...
Operational Research: IO 2019, Tomar, Portugal, July 22–24 20, 171-184, 2021
2021
系统目前无法执行此操作,请稍后再试。
文章 1–20