A survey on assembly lines and its types U Saif, Z Guan, B Wang, J Mirza, S Huang Frontiers of Mechanical Engineering 9, 95-105, 2014 | 67 | 2014 |
Close loop supply chain network problem with uncertainty in demand and returned products: Genetic artificial bee colony algorithm approach YY Cui, Z Guan, U Saif, L Zhang, F Zhang, J Mirza Journal of Cleaner Production 162, 717-742, 2017 | 56 | 2017 |
Multi-objective artificial bee colony algorithm for simultaneous sequencing and balancing of mixed model assembly line U Saif, Z Guan, W Liu, B Wang, C Zhang The International Journal of Advanced Manufacturing Technology 75, 1809-1827, 2014 | 56 | 2014 |
Multi-objective artificial bee colony algorithm for order oriented simultaneous sequencing and balancing of multi-mixed model assembly line U Saif, Z Guan, L Zhang, F Zhang, B Wang, J Mirza Journal of Intelligent Manufacturing 30, 1195-1220, 2019 | 49 | 2019 |
Pareto based artificial bee colony algorithm for multi objective single model assembly line balancing with uncertain task times U Saif, Z Guan, W Liu, C Zhang, B Wang Computers & Industrial Engineering 76, 1-15, 2014 | 49 | 2014 |
Closed-loop supply chain network design integrated with assembly and disassembly line balancing under uncertainty: an enhanced decomposition approach A Yolmeh, U Saif International Journal of Production Research 59 (9), 2690-2707, 2021 | 40 | 2021 |
Multi-level planning and scheduling for parallel PCB assembly lines using hybrid spider monkey optimization approach J Mumtaz, Z Guan, L Yue, Z Wang, S Ullah, M Rauf Ieee Access 7, 18685-18700, 2019 | 38 | 2019 |
Multi objective lotsizing and scheduling with material constraints in flexible parallel lines using a Pareto based guided artificial bee colony algorithm L Yue, Z Guan, L Zhang, S Ullah, Y Cui Computers & Industrial Engineering 128, 659-680, 2019 | 36 | 2019 |
Simultaneous order scheduling and mixed-model sequencing in assemble-to-order production environment: a multi-objective hybrid artificial bee colony algorithm B Wang, Z Guan, S Ullah, X Xu, Z He Journal of Intelligent manufacturing 28, 419-436, 2017 | 31 | 2017 |
An improved genetic algorithm for robust permutation flowshop scheduling Q Liu, S Ullah, C Zhang The International Journal of Advanced Manufacturing Technology 56, 345-354, 2011 | 31 | 2011 |
Simulation-based optimisation of logistics distribution system for an assembly line with path constraints C Wang, Z Guan, X Shao, S Ullah International Journal of Production Research 52 (12), 3538-3551, 2014 | 28 | 2014 |
Hybrid Pareto artificial bee colony algorithm for assembly line balancing with task time variations U Saif, Z Guan, L Zhang, J Mirza, Y Lei International Journal of Computer Integrated Manufacturing 30 (2-3), 255-270, 2017 | 26 | 2017 |
Self-learning control for coordinated collision avoidance of automated vehicles Y Wang, G Yin, Y Li, S Ullah, W Zhuang, J Wang, N Zhang, K Geng Proceedings of the Institution of Mechanical Engineers, Part D: Journal of …, 2021 | 25 | 2021 |
Modeling of weld bead geometry on HSLA steel using response surface methodology M Jahanzaib, S Hussain, A Wasim, H Aziz, A Mirza, S Ullah The International Journal of Advanced Manufacturing Technology 89, 2087-2098, 2017 | 23 | 2017 |
Integrated planning and scheduling of multiple manufacturing projects under resource constraints using raccoon family optimization algorithm M Rauf, Z Guan, L Yue, Z Guo, J Mumtaz, S Ullah IEEE Access 8, 151279-151295, 2020 | 18 | 2020 |
Drum buffer rope-based heuristic for multi-level rolling horizon planning in mixed model production U Saif, Z Guan, C Wang, C He, L Yue, J Mirza International Journal of Production Research 57 (12), 3864-3891, 2019 | 18 | 2019 |
Hybrid Pareto artificial bee colony algorithm for multi-objective single machine group scheduling problem with sequence-dependent setup times and learning effects L Yue, Z Guan, U Saif, F Zhang, H Wang SpringerPlus 5, 1-31, 2016 | 18 | 2016 |
Inventory management for a remanufacture-to-order production with multi-components (parts) F Zhang, Z Guan, L Zhang, Y Cui, P Yi, S Ullah Journal of Intelligent Manufacturing 30, 59-78, 2019 | 14 | 2019 |
A bottleneck degree-based migrating birds optimization algorithm for the PCB production scheduling J Cao, Z Guan, L Yue, S Ullah, RAK Sherwani IEEE Access 8, 209579-209593, 2020 | 13 | 2020 |
Slotting optimization of automated storage and retrieval system (AS/RS) for efficient delivery of parts in an assembly shop using genetic algorithm: A case Study L Yue, Z Guan, C He, D Luo, U Saif IOP conference series: materials science and engineering 215 (1), 012002, 2017 | 10 | 2017 |