关注
Seulbi Lee
标题
引用次数
引用次数
年份
Bayesian network-based seismic damage estimation for power and potable water supply systems
S Lee, M Choi, HS Lee, M Park
Reliability Engineering & System Safety 197, 106796, 2020
402020
Probabilistic framework for assessing the vulnerability of power distribution infrastructures under extreme wind conditions
S Lee, Y Ham
Sustainable Cities and Society 65, 102587, 2021
292021
Large-scale visual data–driven probabilistic risk assessment of utility poles regarding the vulnerability of power distribution infrastructure systems
J Kim, M Kamari, S Lee, Y Ham
Journal of construction engineering and management 147 (10), 04021121, 2021
262021
Comparison of emergency response abilities and evacuation performance involving vulnerable occupants in building fire situations
M Choi, S Lee, S Hwang, M Park, HS Lee
Sustainability 12 (1), 87, 2019
252019
Distributed and interoperable simulation for comprehensive disaster response management in facilities
M Choi, R Starbuck, S Lee, S Hwang, SH Lee, M Park, HS Lee
Automation in Construction 93, 12-21, 2018
182018
Impact of demand-side response on community resilience: Focusing on a power grid after seismic hazards
S Lee, M Park, HS Lee, Y Ham
Journal of Management in Engineering 36 (6), 04020071, 2020
172020
High level architecture (HLA) compliant distributed simulation platform for disaster preparedness and response in facility management
S Hwang, R Starbuck, SH Lee, M Choi, S Lee, M Park
2016 Winter Simulation Conference (WSC), 3365-3374, 2016
172016
Damage propagation from component level to system level in the electricity sector
S Lee, S Hwang, M Park, HS Lee
Journal of Infrastructure Systems 24 (3), 04018016, 2018
92018
A framework for post-disaster facility restoration management: needs and requirements for the use of hybrid simulation
M Park, SH Lee, HS Lee, M Choi, S Hwang, MG Moon, S Lee, JH Pyeon
Construction Research Congress 2014: Construction in a Global Network, 1269-1278, 2014
52014
An analysis of mental process within construction workforces for project-level safety management
M Shin, HS Lee, M Park, S Lee
Proceedings of the 31st International Conference of the System Dynamics …, 2013
52013
Probabilistic analysis of structural reliability of leaning poles in power distribution infrastructure systems under extreme wind loads
S Lee, Y Ham
Construction Research Congress 2020, 619-626, 2020
32020
Measuring the Distance between Trees and Power Lines under Wind Loads to Assess the Heightened Potential Risk of Wildfire
S Lee, Y Ham
Remote Sensing 15 (6), 1485, 2023
22023
Analysis of the Degraded Performance and Restoration Plan of Lfieline Systems Considering Interdependency in the Post-disaster
S Lee, M Park, HS Lee, S Hwang
Korean Journal of Construction Engineering and Management 15 (4), 139-149, 2014
22014
Quantitative Analysis of the Factors Influencing Field Installation Time for Precast Concrete Building Components: An Empirical Study
E Jeong, J Jang, S Lee, S Ahn, TW Kim
Journal of Management in Engineering 40 (3), 04024010, 2024
12024
Robustness estimation for power and water supply network: In the context of failure propagation
S Lee, M Park, HS Lee
Korean Journal of Construction Engineering and Management 19 (3), 33-42, 2018
12018
A Dynamic Approach for Evaluating the Validity of Boosting Pocliies for Green Standard for Energy and Environmental Design Certification
JH Kim, HS Lee, M Park, S Lee
Korean Journal of Construction Engineering and Management 17 (1), 28-39, 2016
12016
The impact of different types and levels of construction noise on physiological responses: Focusing on standardization and habituation
S Lee, S Hwang, M Lee, S Lee
Sustainable Cities and Society, 105644, 2024
2024
Modeling Fire Ignition Probability in the Wildland-Urban Interface: Focusing on Power Infrastructure and Surrounding Environment
S Lee, Y Ham
Computing in Civil Engineering 2021, 2022
2022
Analysis on Disaster Information Effect Process to Occupant Behaviour: Focusing on Relationship to Egress Time
D Ji, S Lee, HS Lee, M Park
Korean Journal of Construction Engineering and Management 19 (3), 11-22, 2018
2018
系统目前无法执行此操作,请稍后再试。
文章 1–19