Readiness assessment of electronic health records implementation S Ajami, S Ketabi, SS Isfahani, A Heidari Acta Informatica Medica 19 (4), 224, 2011 | 114 | 2011 |
Performance evaluation of medical records departments by analytical hierarchy process (AHP) approach in the selected hospitals in Isfahan: Medical records dep. & AHP S Ajami, S Ketabi Journal of medical systems 36, 1165-1171, 2012 | 67 | 2012 |
Wait time in emergency department (ED) processes S Ajami, S Ketabi, MH Yarmohammadian, H Bagherian Medical Archives 66 (1), 53, 2012 | 48 | 2012 |
An analysis of the average waiting time during the patient discharge process at Kashani Hospital in Esfahan, Iran: a case study S Ajami, S Ketabi Health Information Management Journal 36 (2), 37-42, 2007 | 47 | 2007 |
Ranking the banks through performance evaluation by integrating fuzzy AHP and TOPSIS methods: A study of Iranian private banks M Rezaei, S Ketabi International Journal of Academic Research in Accounting, Finance and …, 2016 | 45 | 2016 |
Efficiency measurement of cardiac care units of Isfahan hospitals in Iran S Ketabi Journal of medical systems 35, 143-150, 2011 | 44 | 2011 |
Waiting time in emergency department by simulation. S Ajami, S Ketabi, MH Yarmohammadian, H Bagherian ITCH, 196-200, 2011 | 37 | 2011 |
Requirements and areas associated with readiness assessment of Electronic Health Records implementation. S Ajami, S Ketabi, S Saghaeiannejad, A Heidari Journal of Health Administration 14 (46), 2011 | 34 | 2011 |
Developing a network DEA model for sustainability analysis of Iran’s electricity distribution network M Tavassoli, S Ketabi, M Ghandehari International Journal of Electrical Power & Energy Systems 122, 106187, 2020 | 32 | 2020 |
Reducing waiting time in emergency department at Ayatollah-Kashani Hospital using simulation. S Ajami, S Ketabi, HB MahmoodAbadi | 30 | 2013 |
Measuring the efficiency of Qom hospitals with data envelopment analysis and analytic hierarchy process R Salehzadeh, S Ketabi Journal of Health Information Management 8 (420), 479-489, 2011 | 30 | 2011 |
Investigate the parameters which affect the patients waiting time in emergency department of orthopedic services in Ayatollah Kashani hospital with the lean management approach A Mahabadi, S Ketabi, SM Sajadi ﺖﺳا دازآ تﻻﺎﻘﻣ جرد مﺪﻋ ﺎﯾ و جرد، يرﺎﺘﺳاﺮﯾو رد ﻪﻠﺠﻣ., 2014 | 23 | 2014 |
Bed balancing in surgical wards via block scheduling MW Carter, S Ketabi Journal of Minimally Invasive Surgical Sciences 2 (2), 129-137, 2013 | 23 | 2013 |
Factors affecting patients' length of stay in Alzahra hospital based on hierarchical analysis technique M Yaghoubi, S Karimi, S Ketabi, M Javadi Director General 8 (3), 2011 | 22 | 2011 |
Performance improvement indicators of the Medical Records Department and Information Technology (IT) in hospitals S Ajami, S Ketabi, F Torabiyan Pakistan journal of medical sciences 31 (3), 717, 2015 | 21 | 2015 |
Selecting the Proper Marketing Mixusing the AHP technique: A Strategic Market Planning Approach S Ketabi, M Ansari, M Naserei Taherei Journal of Economics and Administrative Sciences 17 (1), 79-92, 2005 | 19 | 2005 |
Improving the medical records department processes by lean management S Ajami, S Ketabi, A Sadeghian, S Saghaeinnejad-Isfahani Journal of education and health promotion 4 (1), 48, 2015 | 18 | 2015 |
Analysis of efficiency and resource allocation at different wards in Shariati hospital, Isfahan, Iran, using data envelopment analysis E Azad, S Ketabi, I Soltani, M Bagherzade Health Information Management 8 (7), 938-947, 2012 | 18 | 2012 |
Integrative design, production, and marketing policy for a configurable product family M Ziaei, S Ketabi, M Ghandehari International Journal of Management Science and Engineering Management 16 (1 …, 2021 | 15 | 2021 |
A novel fuzzy network DEA model to evaluate efficiency of Iran’s electricity distribution network with sustainability considerations M Tavassoli, S Ketabi, M Ghandehari Sustainable Energy Technologies and Assessments 52, 102269, 2022 | 14 | 2022 |